Home › Drivetrain › K112 (CVT) › OIL COOLER › from 2016.05
RM24M0E _52 Drivetrain _059572 K112 CVT _0292049 OIL COOLER A

K112 CVT  OIL COOLER  INSTALLATION  


PROCEDURE

Hide 33493B 1.INSTALL OIL COOLER

a.

Install the oil cooler to the continuously variable transaxle with the 3 bolts.

Torque:
12 N*m (120 kgf*cm, 8 ft.*lbf)


Hide 2.INSTALL OIL COOLER HOSE

a.

Install the 6 clamps to the 3 outlet No. 1 oil cooler hoses.


b.

Install the 3 outlet No. 1 oil cooler hoses to the outlet oil cooler tube and engage the 3 clamps.


c.

Install the 6 clamps to the 3 inlet oil cooler hoses.


d.

Install the 3 inlet oil cooler hoses to the outlet oil cooler tube and engage the 3 clamps.


e.

Install the 2 oil cooler hoses to the oil cooler and continuously variable transaxle assembly and engage the 4 clamps.

NOTICE:

Fully insert the 2 oil cooler hoses until the 2nd rib on each oil cooler pipe.



f.

Install the 2 oil cooler hoses to the oil cooler tube sub-assembly and engage the 2 clamps.


Hide 3.CONNECT WATER BY-PASS HOSE

a.

Connect the 2 water by-pass hoses to the oil cooler and engage the 2 clamps.

NOTICE:

Fully insert the 2 water by-pass hoses until the 2nd rib on each oil cooler pipe.



Hide 6.ADD CONTINUOUSLY VARIABLE TRANSAXLE FLUID

Hide 8.INSPECT FOR OIL LEAK

Hide 53292A 9.INSTALL UPPER RADIATOR SUPPORT SEAL

Hide 51441 10.INSTALL NO. 1 ENGINE UNDER COVER

Hide 53702 11.INSTALL FRONT FENDER APRON LH