ENGINE ASSEMBLY > INSTALLATION |
| 1. INSTALL ENGINE OIL LEVEL SENSOR |
Set a new gasket, and then install the engine oil level sensor with the 4 bolts.
| 2. INSTALL CRANKSHAFT POSITION SENSOR |
![]() |
Apply a light coat of engine oil to the O-ring of the crankshaft position sensor.
![]() |
Install the crankshaft position sensor with the bolt.
Connect the 3 wire harness clamps.
![]() |
Connect the crankshaft position sensor connector to the vacuum pipe No.1.
Connect the crankshaft position sensor connector.
| 3. INSTALL CAMSHAFT POSITION SENSOR |
![]() |
Apply a light coat of engine oil to the O-ring of the camshaft position sensor.
![]() |
Install the camshaft position sensor with the bolt.
Connect the camshaft position sensor connector.
| 4. INSTALL DIESEL ENGINE WATER TEMPERATURE SENSOR |
Using a deep-socket wrench (17 mm), install the water temperature sensor.
| 5. INSTALL VACUUM PUMP ASSEMBLY |
| 6. INSTALL CRANKSHAFT PULLEY |
![]() |
Tighten the bolt holding the crankshaft pulley with SST.
| 7. INSTALL TIMING BELT IDLER SUB-ASSEMBLY NO.1 |
![]() |
Using a 10 mm socket hexagon wrench, install the timing belt idler No.1 and plate washer with the bolt.
| 8. INSTALL ENGINE MOUNTING BRACKET FRONT NO.1 RH |
![]() |
Install the engine mounting bracket front No.1 RH with the 4 bolts.
| 9. INSTALL EXHAUST MANIFOLD |
Install a new gasket and the exhaust manifold with the 2 bolts and 6 nuts.
| 10. INSTALL TURBOCHARGER SUB-ASSEMBLY |
| 11. INSTALL TURBINE OUTLET ELBOW |
Install a new gasket to the turbocharger.
![]() |
Install the turbine outlet elbow with 4 new bolts.
| 12. INSTALL TURBO WATER PIPE SUB-ASSEMBLY NO.2 (for Water Cooled Turbocharger) |
Install a new gasket onto the turbocharger.
![]() |
Install the turbo water pipe No.2 with the bolt and 2 nuts to the turbocharger.
| 13. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY NO.2 |
Water cooled turbocharger (w/ heater)
Install a new gasket onto the cylinder block.
![]() |
Install the water by-pass pipe No.2 with the bolt and 2 nuts.
Connect the 2 water hoses with the 2 clips.
Connect the water by-pass hose No.3 with the clip.
Connect the heater water inlet hose with the clip.
Water cooled turbocharger (w/o heater)
Install a new gasket onto the cylinder block.
![]() |
Install the water by-pass pipe No.2 with the 2 nuts.
Install the turbo water pipe No.2 with the 2 bolts.
Connect the 2 water hoses with the 2 clips.
Connect the water by-pass hose No.3 with the clip.
Air cooled turbocharger (w/o heater)
Install a new gasket onto the cylinder block.
![]() |
Install the water by-pass pipe No.2 with the 2 nuts.
| 14. INSTALL COMPRESSOR ELBOW STAY |
![]() |
Install the compressor elbow stay with the bolt.
| 15. INSTALL VENTILATION HOSE INSULATOR HEAT |
Install the ventilation hose insulator heat with the 2 bolts.
| 16. INSTALL VENTILATION PIPE |
Install the ventilation pipe with the bolt.
| 17. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Temporarily install the V-ribbed belt tensioner with the 4 bolts.
Tighten the V-ribbed belt tensioner with the 4 bolts.
| 18. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator assembly with the bolt.
Install the generator wire to terminal B with the nut.
Install the terminal cap.
Connect the generator connector.
| 19. INSTALL GENERATOR BRACKET |
Install the generator bracket with the bolt.
| 20. INSTALL IDLER PULLEY ASSEMBLY (w/ Air Conditioning) |
Install the idler pulley and washers with the bolt.
| 21. INSTALL COMPRESSOR BRACKET (w/ Air Conditioning) |
![]() |
Temporarily install the compressor bracket with the 4 bolts.
Install the compressor bracket by tightening the 4 bolts as shown in the illustration.
| 22. INSTALL THERMOSTAT |
Install a new gasket to the thermostat.
![]() |
Install the thermostat with the jiggle valve facing up.
| 23. INSTALL WATER INLET |
![]() |
Install the water inlet with the 3 bolts.
| 24. INSTALL GLOW PLUG |
Using a deep socket wrench (12 mm), install the 4 glow plugs.
| 25. INSTALL GLOW PLUG NO.1 CONNECTOR |
Install the glow plug No.1 connectors with the 4 nuts.
Install the 4 grommets.
| 26. INSTALL ENGINE MOUNTING BRACKET FRONT NO.1 LH |
![]() |
Install the engine mounting bracket front No.1 LH with the 4 bolt.
| 27. INSTALL WATER OUTLET |
![]() |
Set a new gasket.
![]() |
Install the water outlet with the 2 bolts.
| 28. INSTALL OIL COOLER COVER SUB-ASSEMBLY (w/o EGR Valve) |
![]() |
Install a new gasket and oil cooler cover with the 2 nuts and 13 bolts.
![]() |
Install the oil drain hoses.
Connect the oil pressure switch connector.
| 29. REMOVE OIL COOLER COVER SUB-ASSEMBLY (w/ EGR Valve) |
![]() |
Install a new gasket and oil cooler cover with the 13 bolts.
![]() |
Install the vacuum transmitting pipe No.2 with the 2 nuts.
Install the oil drain hoses.
Connect the oil pressure switch connector.
| 30. INSTALL INJECTION OR SUPPLY PUMP ASSEMBLY |
![]() |
Confirm that the supply pump gear in the timing gear case moves back and forth smoothly.
Install a new O-ring and the pulley key to the supply pump.
Aligning the projecting edge of the supply pump head to the key-slot of the supply pump gear, install the pump to the timing gear case.
While holding the supply pump by hand, push the supply pump gear rearward to engage the pump gear and drive shaft.
Temporarily install the supply pump with the 2 nuts.
![]() |
Using SST, hold the crankshaft.
Install the supply pump gear set nut.
![]() |
Temporarily install the supply pump stay with the 2 bolts on the engine block side.
Tighten the 2 nuts for the injection pump.
![]() |
Install the camshaft timing pulley flange No.2 and pump drive shaft pulley with the 4 bolts.
| 31. CHECK PUMP DRIVE SHAFT THRUST CLEARANCE |
![]() |
Push the pump drive shaft pulley back and forth to check a thrust clearance of the injection pump drive shaft.
| 32. INSTALL COMMON RAIL ASSEMBLY |
![]() |
Install the common rail assembly with the 2 bolts.
Connect the fuel hose to the fuel pressure limiter.
Connect the fuel pressure sensor connector.
| 33. INSTALL OIL FILTER SUB-ASSEMBLY |
Apply clean engine oil to the gasket of a new oil filter.
Lightly screw the oil filter into place by hand. Tighten it until the gasket contacts the seat.
![]() |
Using SST, tighten the oil filter until the gasket contacts the seat, and then turn it further 3/4.
| 34. INSTALL INTAKE MANIFOLD |
![]() |
Install a new gasket and the intake manifold with the 4 bolts and 2 nuts.
Install the manifold stay with the bolt and nut.
Connect the ground cable with the bolt.
| 35. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY NO.2 |
Temporarily install the nozzle leakage pipe with the 2 bolts.
![]() |
Install the new gasket and union bolt to the nozzle leakage pipe.
![]() |
Tighten the 2 bolts.
| 36. INSTALL FUEL INLET PIPE SUB-ASSEMBLY |
Temporarily install the fuel inlet pipe.
Using SST, tighten the injection pipe on the common rail side.
Using SST, tighten the injection pipe on the supply pump side.
| 37. INSTALL INJECTION PIPE |
Install the injection pipes.
![]() |
Temporarily install the 4 injection pipes.
![]() |
Install the injection pipe clamp No.3 in 2 nuts.
![]() |
Fasten the union sequentially, from the injection pipe common rail to the injector, using SST.
| 38. INSTALL OIL LEVEL GAUGE GUIDE |
Install a new O-ring to the oil level gauge guide.
Apply a light coat of engine oil to the O-ring.
Install the oil level gauge guide with the bolt.
Install the oil level gauge.
| 39. INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR Valve) |
Temporarily tighten the EGR valve assembly with the sensor.
![]() |
Install 2 new gaskets and the EGR valve to the intake air connector as shown in the illustration.
![]() |
Temporarily tighten the intake air connector with EGR valve assembly to the intake manifold with the bolt and the 2 nuts.
Install the vacuum hose to the intake air connector.
Temporarily tighten the manifold stay with the bolt.
![]() |
Connect the EGR valve position sensor connector.
Connect the intake air temperature sensor connector.
Install the vacuum regulating valve.
![]() |
Install the vacuum regulating valve with the 2 bolts.
Connect the 2 vacuum hoses and the regulating valve connector.
| 40. INSTALL INTAKE AIR CONNECTOR (w/o EGR Valve) |
![]() |
Temporarily install 2 new gaskets and intake air connector No.2 to the intake air connector.
![]() |
Temporarily tighten the intake air connector assembly with the bolt and 2 nuts.
Tighten the manifold stay with the bolt.
Tighten the intake air connector with the bolt and 2 nuts.
Install the vacuum hose to the intake air connector.
| 41. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve) |
![]() |
Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.
![]() |
Install the EGR pipe with the 2 bolts and the 2 nuts.
![]() |
Connect the fuel pressure sensor connector.
| 42. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
Install a new gasket to intake air connector.
![]() |
Install the throttle body with the 2 bolts and the 2 nuts.
![]() |
Connect the 2 throttle body connectors.
| 43. INSTALL FAN PULLEY |
Install the fan pulley with the 4 nuts.
| 44. PERFORM PISTON AND VALVE BREAK PREVENT WORK |
![]() |
When turning the camshaft with the timing belt removed, turn the crankshaft 90° counterclockwise.
| 45. INSTALL TIMING BELT |
![]() |
Check that the timing marks are aligned as shown in the illustration.
Install the timing belt to pump drive shaft pulley, camshaft timing pulley and timing belt idler No.1 in sequence.
![]() |
Set the tensioner to the press upright.
Using a press, slowly apply 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force to the push rod.
Align the holes of push rod and housing, pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.
Temporarily install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.
Tighten the 2 bolts.
Remove the 1.5 mm hexagon wrench from the tensioner.
![]() |
Turn the crankshaft in the clockwise direction twice, check that the timing marks are aligned as shown in the illustration.
| 46. INSTALL TIMING BELT NO.1 COVER |
![]() |
Install the timing belt No.1 cover with the 6 bolts.
| 47. INSTALL VANE PUMP ASSEMBLY |
Install a new vane pump O-ring to the vane pump assembly.
![]() |
Install the vane pump assembly with the 2 nuts.
| 48. REMOVE ENGINE STAND |
| 49. INSTALL FRONT SUSPENSION CROSS MEMBER |
Install the engine assembly to the cross member.
Install the 4 bolts for the left and right sides of the front suspension cross member.
| 50. CONNECT PRESSURE FEED TUBE ASSEMBLY |
Install a new gasket to the pressure feed tube assembly.
![]() |
Connect the pressure feed tube assembly to the vane pump assembly with the union bolt.
| 51. CONNECT OIL RESERVOIR TO PUMP HOSE NO.1 |
![]() |
Connect the oil reservoir to pump hose No.1 to the vane pump assembly with the clip.
| 52. INSTALL ENGINE WIRE |
Install the engine wire to the engine assembly.
| 53. INSTALL REAR END PLATE |
Install the rear end plate with the bolt.
| 54. INSTALL FLYWHEEL SUB-ASSEMBLY |
![]() |
Fix the crankshaft with SST.
![]() |
Apply adhesive to 2 or 3 threads of the 8 bolts.
![]() |
For manual transmission
Install the flywheel with the 8 bolts.
For automatic transmission.
Install the flywheel, drive plate and drive plate spacer rear with the 8 bolt.
| 55. INSTALL CLUTCH DISC ASSEMBLY (for Manual Transmission) |
![]() |
Insert SST into the clutch disc assembly, then insert them into the flywheel sub-assembly.
| 56. INSTALL CLUTCH COVER ASSEMBLY (for Manual Transmission) |
![]() |
Align the matchmarks on the clutch cover assembly with the one on the flywheel sub-assembly.
Following the procedures shown in the illustration, tighten the 6 bolts starting from the bolt located near the knock pin on the top.
| 57. INSPECT AND ADJUST CLUTCH COVER ASSEMBLY (for Manual Transmission) |
![]() |
Using a dial indicator with a roller instrument, check the diaphragm spring tip alignment.
![]() |
If alignment is not as specified, adjust the diaphragm spring tip alignment using SST.
| 58. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY (for Automatic Transmission) |
| 59. INSTALL MANUAL TRANSMISSION UNIT ASSEMBLY (for Manual Transmission) |
| 60. INSTALL STARTER ASSEMBLY (for 2.0kW Type) |
![]() |
Install the starter with the bolt and 2 nuts.
![]() |
Connect the wire harness to terminal 30 and install the nut.
Close the terminal cap.
Connect the terminal 50 connector to the starter assembly.
![]() |
Install the ground cable with the bolt.
| 61. REMOVE STARTER ASSEMBLY (for 2.7kW Type) |
![]() |
Install the starter with the bolt and 2 nuts.
![]() |
Connect the wire harness to terminal 30 and install the nut.
Close the terminal cap.
Connect the terminal 50 connector to the starter assembly.
![]() |
Install the wire ground cable with the bolt.
| 62. INSTALL ENGINE ASSEMBLY WITH TRANSMISSION |
Using a engine lifter, install the engine assembly w/ transmission to the vehicle.
![]() |
Install the stabilizer brackets and 16 bolts of the front suspension cross member.
Connect the rear engine mount.
Remove the engine lifter slowly.
| 63. CONNECT STEERING TORQUE SHAFT ASSEMBLY |
![]() |
Align the matchmarks on the steering torque shaft assembly and the power steering link assembly.
![]() |
Install bolt (B) and tighten the 2 bolts.
| 64. CONNECT OIL COOLER TUBE (for Automatic Transmission) |
Connect the oil cooler inlet tube and oil cooler outlet tube with the clamp to the oil cooler.
| 65. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission) |
![]() |
Fix the transmission control cable assembly to the control cable bracket with a clip.
Install the transmission control cable assembly to the control shaft lever with the nut.
| 66. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY (for Automatic Transmission) |
![]() |
Coat a new O-ring with ATF and install the oil filler tube.
Install the oil filler tube with the 2 bolts.
| 67. INSTALL CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission) |
![]() |
Install the clutch release cylinder with the 2 bolts.
| 68. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Manual Transmission) |
![]() |
Install 2 new clips to the transmission control cable bracket No.1.
Install the transmission control cable assembly to the transmission control cable bracket No.1.
Align the matchmarks on the control cable assembly and the outer lever.
![]() |
Install the transmission control cable assembly to the outer levers with the 2 nuts.
| 69. CONNECT SHOCK ABSORBER ASSEMBLY FRONT LH |
| 70. CONNECT SHOCK ABSORBER ASSEMBLY FRONT RH |
| 71. CONNECT FRONT SUSPENSION SUB-ASSEMBLY UPPER LH |
![]() |
Connect the front suspension upper arm to the steering knuckle with the nut.
Install a new cotter pin.
| 72. CONNECT FRONT SUSPENSION SUB-ASSEMBLY UPPER RH |
| 73. INSTALL FRONT DISC BRAKE CALIPER ASSEMBLY LH |
![]() |
Install the brake caliper assembly to the steering knuckle with the 2 bolts.
| 74. INSTALL FRONT DISC BRAKE CALIPER ASSEMBLY RH |
| 75. INSTALL SPEED SENSOR FRONT LH (w/ ABS) |
![]() |
Install the speed sensor to the steering knuckle with the 2 bolts.
| 76. INSTALL SPEED SENSOR FRONT RH (w/ ABS) |
| 77. REMOVE PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY (for Super Long Wheelbase) |
![]() |
Remove the SST from the extension housing.
Install the propeller with center bearing shaft assembly in the extension housing.
![]() |
Install the center support bearing assembly No.1, and temporarily tighten the 2 bolts.
![]() |
Align the matchmarks on the propeller shaft flange and differential flange.
Install the propeller shaft assy with the 4 nuts, 4 bolts and 4 washers.
![]() |
Check that the center line of the bracket is at right angles to the shaft axial direction.
![]() |
Adjust the center support bearing assembly No.1.
Tighten the 2 bolts.
| 78. INSTALL PROPELLER SHAFT ASSEMBLY (for Long Wheelbase) |
![]() |
Remove the SST from the extension housing.
Install the propeller shaft assembly in the extension housing.
Align the matchmarks on the propeller shaft flange and differential flange.
![]() |
Install the propeller shaft assembly with the 4 nuts, 4 bolts and 4 washers.
| 79. INSTALL EXHAUST PIPE ASSEMBLY CENTER (for Super Long Wheelbase) |
Connect the exhaust pipe supports and install the exhaust pipe assembly center and a new gasket with the 2 bolts to the exhaust pipe assembly tail.
| 80. INSTALL EXHAUST PIPE ASSEMBLY FRONT (for Super Long Wheelbase) |
Inspect the compression spring.
![]() |
Using vernier calipers, measure the free length of the compression springs.
![]() |
Install the gasket.
Fully insert a new gasket to the exhaust manifold by hand.
Using a wooden block, uniformly strike the gasket so that the gasket and exhaust manifold are properly fit.
Connect the exhaust pipe support, and install the exhaust pipe assembly front and a new gasket with the 4 bolts, 2 compression springs and 2nuts.
| 81. REMOVE EXHAUST PIPE ASSEMBLY FRONT (for Long Wheelbase) |
Inspect the compression spring.
![]() |
Using vernier calipers, measure the free length of the compression springs.
![]() |
Install the gasket.
Fully insert a new gasket to the exhaust manifold by hand.
Using a wooden block, uniformly strike the gasket so that the gasket and exhaust manifold are properly fit.
Connect the exhaust pipe support, and install the exhaust pipe assembly front with the 4 bolts, 2 compression springs and 2 nuts.
| 82. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY |
![]() |
Install the vane pump oil reservoir assembly with the 2 bolts.
| 83. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning) |
![]() |
Install the compressor and magnetic clutch with the 4 bolts.
| 84. CONNECT ENGINE WIRE |
Connect the +B terminal and connector of the starter.
![]() |
Install the 4 connectors and nut as shown in the illustration.
Connect the clamps of the engine wire and earth cable.
Connect the connectors to the ECM.
Install the wire harness support of the ECM.
| 85. CONNECT VACUUM HOSE |
![]() |
Connect the vacuum hose to the vacuum pump assembly.
| 86. CONNECT FUEL HOSE NO.1 |
Connect the fuel hose No.1 with the clamp to the injection pump assembly.
| 87. CONNECT FUEL HOSE NO.2 |
Connect the fuel hose No.2 with the clamp to the nozzle leakage pipe No.2.
| 88. CONNECT WATER BY-PASS HOSE NO.3 |
Connect the water by-pass hose No.3 with the clamp to the water by-pass pipe No.2.
| 89. CONNECT RADIATOR HOSE NO.4 |
Connect the radiator hose No.4 with the clamp to the water outlet.
| 90. CONNECT RADIATOR HOSE INLET |
Connect the radiator inlet hose with the clamp to the water inlet.
| 91. CONNECT AIR HOSE NO.4 |
Connect the air hose No.4 with the clamp to the diesel throttle body.
| 92. CONNECT OIL RETURN HOSE (w/ Intercooler) |
Connect the oil return hose to the intake manifold.
| 93. INSTALL COMPRESSOR OUTLET ELBOW |
![]() |
Install the compressor outlet elbow with the 2 bolts and 2 clamps.
| 94. INSTALL AIR CLEANER HOSE ASSEMBLY |
Install the air cleaner hose assembly with the clamp.
| 95. INSTALL FENDER APRON MUDGUARD SEAL |
| 96. INSTALL FAN AND GENERATOR V BELT |
![]() |
Install the drive belt by rotating the tensioner pulley in clockwise direction with the pulley set bolt of the tensioner.
![]() |
Make sure that the indicator mark of the tensioner is within range A.
| 97. INSTALL ENGINE SERVICE HOLE SUB COVER ASSEMBLY |
Install the engine service hole sub cover with the 5 bolts.
| 98. INSTALL FRONT DOOR SCUFF PLATE |
| 99. INSTALL FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type) |
Perform the same procedure as above on the opposite side.
| 100. REMOVE RONT SEAT ASSEMBLY RH (for Low-back Seat Type) |
Perform the same procedure as above on the opposite side.
| 101. CONNECT BATTERY NEGATIVE CABLE |
| 102. INSTALL FRONT WHEELS |
| 103. PLACE FRONT WHEELS FACING STRAIGHT AHEAD |
| 104. ADD ENGINE OIL |
| 105. ADD ENGINE COOLANT |
Firmly tighten the drain plugs and fill the radiator reserve tank assembly with coolant to the top of the inlet.
Loosen the bleeder plug of outlet housing.
When air is bled and the coolant drains out, firmly install the bleeder plug.
Add coolant up to the B line mark in the radiator reserve tank assembly and install the radiator cap.
| Condition | Capacity |
| w/ rear heater | 17.0 liters (18.0 US qts, 15.0 imp. qts) |
| w/o rear heater | 15.0 liters (15.9 US qts, 13.2 imp. qts) |
Warm up the engine.
After the engine cools down check that the coolant level is between the LOW and FULL level marks.
| 106. ADD POWER STEERING FLUID |
| 107. BLEED FUEL LINE |
Push the priming pump for several times to fill up the fuel lines with fuel.
| 108. BLEED POWER STEERING FLUID |
Check the fluid level.
Jack up the front of the vehicle and support it with stands.
Turn the steering wheel.
With the engine stopped, turn the steering wheel slowly from lock to lock several times.
Lower the vehicle.
Start the engine.
Run the engine at idle for a few minutes.
Turn the steering wheel.
With the engine idling, turn the steering wheel left or right to the full lock position and keep it there for 2 to 3 seconds, then turn the steering wheel to the opposite full lock position and keep it there for 2 to 3 seconds.
Repeat several times.
Stop the engine.
![]() |
Check for foaming or emulsification.
If the system has to be bled twice because of forming or emulsification, be sure to check for fluid leaks in the system.
Check the fluid level .
| 109. INSPECT FUEL LEAKAGE |
PERFORM ACTIVE TEST
Connect the intelligent tester to the DLC3.
Turn the ignition switch on.
Turn the intelligent tester on.
Enter the following menus: Powertrain / ECD / Active Test.
Perform the Active Test.
| Intelligent Tester Display | Test Details | Control Range | Diagnostic Notes |
| Test the Fuel Leak | Pressurizes common rail internal fuel pressure, and checks for fuel leaks | Stop/Start |
|
| 110. INSPECT ENGINE OIL LEAKS |
| 111. INSPECT ENGINE COOLANT LEAKS |
Fill the radiator with coolant and attach a radiator cap tester to the radiator.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 137 kPa (1.4 kgf/cm2, 19.9 psi), and check that the pressure does not drop.
| 112. INSPECT POWER STEERING FLUID LEAK |
| 113. INSPECT POWER STEERING FLUID LEVEL |
| 114. INSPECT MANUAL TRANSMISSION OIL (for Manual Transmission) |
![]() |
Park the vehicle in a level place.
Remove the transmission filler plug and gasket.
Check that the oil surface is within 5 mm (0.20 in.) below the lowest point of the transmission filler plug opening.
Check for oil leakage if the oil level is low.
Install the transmission filler plug and a new gasket.
| 115. INSPECT AUTOMATIC TRANSMISSION FLUID (for Automatic Transmission) |
![]() |
Park the vehicle on a level surface and set the parking brake.
With the engine idling and the brake pedal depressed, move shift the lever into all positions from P to L and return to the P position.
Take out the dipstick and wipe it clean.
Put it back all the way.
Take it out again and check that the fluid level is within the HOT range.
If the fluid level is below the HOT range, add new fluid and recheck the fluid level. If the fluid level exceeds the HOT range, drain the fluid once, add the proper amount of new fluid and recheck the fluid level.
| 116. INSPECT SHIFT LEVER POSITION (for Automatic Transmission) |
When shifting from P position only with ignition switch ON and depress the break pedal.
Make sure that the shifting lever moves smoothly and can be moderately operated.
When starting engine, make sure that the vehicle moves forward when shifting from N to D position and moves reward when shifting R position.
| 117. ADJUST SHIFT LEVER POSITION (for Automatic Transmission) |
![]() |
Remove a clip, nut, and disconnect between the control shaft lever to transmission control cable assembly from the control shaft lever and transmission control cable bracket No.1.
![]() |
Turn the control shaft lever until stop to a clockwise direction, return the control shaft lever 2 notches to N position.
![]() |
Set the shift lever to N position while holding the shift lever lightly toward the R position side and install it.
Inspect the operation condition and work.
| 118. INSPECT EXHAUST GAS LEAKS |
| 119. ADJUST FRONT WHEEL ALIGNMENT |
| 120. INSTALL ENGINE SIDE UNDER COVER RH (w/ Engine Side Under Cover RH) |
| 121. INSTALL ENGINE SIDE UNDER COVER LH (w/ Engine Side Under Cover LH) |
| 122. INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2) |
| 123. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1) |
| 124. CHECK IDLE SPEED |
Connect the intelligent tester to the DLC3.
![]() |
If the tester is not available, connect a tester probe of a tachometer to terminal 9 (TAC) of the DLC3 with SST.
Start the engine and check the idle speed.
In case of the tester probe of the tachometer is connected to the DLC3, disconnect the tester probe from terminal 9 of the DLC3 with SST.
Disconnect the intelligent tester from the DLC3.
| 125. INSPECT MAXIMUM ENGINE SPEED |
Connect the intelligent tester to the DLC3.
![]() |
If the tester is not available, connect a tester probe of a tachometer to terminal 9 (TAC) of the DLC3 with SST.
Start the engine.
Depress the accelerator pedal all the way to the limit.
Check the maximum speed.
In case of the tester probe of the tachometer is connected to the DLC3, disconnect the tester probe from terminal 9 of the DLC3 with SST.
Disconnect the intelligent tester from the DLC3.
| 126. INSPECT ABS SENSOR SIGNAL |
| 127. INSPECT FUNCTION OF THROTTLE BODY |
Inspect the throttle control motor.
![]() |
Using an ohmmeter, measure the resistance between the terminals.
| Tester Connection | Specified Condition |
| 1 (DUTY) - Body ground | 2 Ω to 10 kΩ |
| 128. PERFORM INITIALIZATION |