Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › FUSE BOX
RM37A0E _51 Engine / Hybrid System _086850 HYBRID / BATTERY CONTROL _0420009 FUSE BOX A

HYBRID / BATTERY CONTROL  FUSE BOX  INSTALLATION  


PROCEDURE

Hide G92Z2 1.INSTALL HYBRID BATTERY TERMINAL BLOCK

CAUTION:

Be sure to wear insulated gloves.


a.
A455835C01
2.125,0.688 2.844,0.688 true 2.875,0.583 3.188,0.74 0.313,0.156 10 false *a
*a Pin


Install the hybrid battery terminal block to the HV battery with the nut.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)

NOTICE:

Make sure to align the hole of the hybrid battery terminal block with the pin.



b.

Connect the 2 hybrid battery terminal block connectors.

NOTICE:

Make sure that the connectors are connected securely.



Hide G920Q 2.INSTALL NO. 1 HYBRID BATTERY SHIELD SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves.


a.

Install the No. 1 hybrid battery shield sub-assembly with the 6 nuts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


b.

Install the electric vehicle battery plug assembly with the bolt.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


Hide 82161 3.CONNECT FLOOR WIRE

CAUTION:

Be sure to wear insulated gloves.


a.

Engage the 3 clamps.


b.

Connect the electric vehicle battery plug assembly connector.


c.

Connect the HV battery junction block assembly connector.

NOTICE:

Make sure that the connectors are connected securely.



d.

Engage the clamp.


Hide G92QC 5.INSTALL NO. 10 HV BATTERY SHIELD PANEL

Hide 58510D 7.INSTALL FRONT FLOOR CARPET ASSEMBLY

Hide 11.PERFORM INITIALIZATION