CYLINDER HEAD > INSTALLATION |
| 1. INSTALL CYLINDER HEAD GASKET |
![]() |
Find where the piston head protrudes most by slowly turning the crankshaft clockwise and counterclockwise.
![]() |
Measure the piston protrusion of each cylinder at 2 points as shown in the illustration.
For the piston protrusion value of each cylinder, use the average of the 2 measurements of each cylinder.
![]() |
Select a new cylinder head gasket.
| Mark | Thickness |
| A | 0.80 to 0.90 mm (0.0315 to 0.0354 in.) |
| B | 0.85 to 0.95 mm (0.0335 to 0.0374 in.) |
| C | 0.90 to 1.00 mm (0.0354 to 0.0394 in.) |
| D | 0.95 to 1.05 mm (0.0374 to 0.0413 in.) |
| E | 1.00 to 1.10 mm (0.0394 to 0.0433 in.) |
Select the largest piston protrusion value from the measurements made. Then select a new appropriate gasket according to the table below.
| Gasket Size | Piston Protrusion |
| Use A | 0.005 to 0.054 mm (0.0002 to 0.0021 in.) |
| Use B | 0.055 to 0.104 mm (0.0022 to 0.0041 in.) |
| Use C | 0.105 to 0.154 mm (0.0041 to 0.0061 in.) |
| Use D | 0.155 to 0.204 mm (0.0061 to 0.0080 in.) |
| Use E | 0.205 to 0.255 mm (0.0081 to 0.0100 in.) |
![]() |
Place the cylinder head on the cylinder block.
Place the cylinder head gasket on the cylinder block.
Place the cylinder head on the cylinder head gasket.
| 2. INSTALL CYLINDER HEAD SUB-ASSEMBLY |
![]() |
Apply a light coat of engine oil on the threads and under the heads of the cylinder head bolts.
Install and uniformly tighten the 18 cylinder head bolts, in several passes in the sequence shown in the illustration.
![]() |
Mark the front of the cylinder head bolts with paint.
Further tighten the cylinder head bolts by 90° in the sequence shown in the illustration above.
Finally, tighten the cylinder head bolts by an additional 90°.
Check that the painted marks are now facing rearward.
| 3. INSTALL CAMSHAFT |
![]() |
Using the crankshaft pulley bolt, set the No. 1 cylinder to 90° BTDC/compression.
![]() |
Install the camshaft.
Apply MP grease to the thrust portion of the camshaft.
Place the camshaft on the cylinder head, facing the key groove upward.
![]() |
Align the timing marks (1 dot mark) of the camshaft drive and driven main gears, and set the No. 2 camshaft in place.
![]() |
Remove any old packing (FIPG) material from the camshaft bearing cap.
Apply seal packing to the specified areas shown in the illustration.
![]() |
Install the 5 bearing caps in their proper locations.
![]() |
Apply a light coat of engine oil on the threads and under the heads of the bearing cap bolts.
Install and uniformly tighten the 15 bearing cap bolts in several passes in the sequence shown in the illustration.
Install the camshaft oil seal.
| 4. INSPECT VALVE CLEARANCE |
![]() |
Check only the valves indicated.
Using a feeler gauge, measure the clearance between the valve lifter and camshaft.
| Intake | Exhaust |
| 0.20 to 0.30 mm (0.008 to 0.012 in.) | 0.35 to 0.45 mm (0.014 to 0.018 in.) |
Turn the crankshaft 360° to set the No. 4 cylinder to TDC / compression.
![]() |
Check only the valves indicated.
Using a feeler gauge, measure the clearance between the valve lifter and camshaft.
| Intake | Exhaust |
| 0.20 to 0.30 mm (0.008 to 0.012 in.) | 0.35 to 0.45 mm (0.014 to 0.018 in.) |
| 5. ADJUST VALVE CLEARANCE |
Adjust the valve clearance (Click here).
| 6. INSTALL INJECTOR ASSEMBLY |
![]() |
Install 4 new injection nozzle seats to the cylinder head.
Apply a small amount of clean engine oil to 4 new O-rings.
![]() |
Install an O-ring to each injector as shown in the illustration.
Insert the 4 injectors into the cylinder head.
For an injector that has been replaced with a new injector, register the injector compensation code .
![]() |
Temporarily install 4 new washers and the 4 nozzle holder clamps with the 4 bolts.
![]() |
Temporarily install the 4 injection pipes with the union nuts.
![]() |
Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
If scratches or dents are present, replace the nozzle leakage pipe.
![]() |
Set the leakage pipe and 5 new gaskets in place.
Apply a small amount of oil to the 4 hollow screws and union bolt.
Temporarily install the leakage pipe with the 4 hollow screws and union bolt.
Tighten the 4 holder clamp bolts.
![]() |
Tighten the 4 hollow screws in order from 1 to 4.
Tighten the union bolt.
Remove the 4 injection pipes.
| 7. INSPECT FOR FUEL LEAK |
![]() |
Check that there are no leaks from the nozzle leakage pipe connection.
Install the gasket and No. 2 nozzle leakage pipe to the cylinder head with SST (check valve).
Apply a small amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe connection.
![]() |
Install SST (turbocharger pressure gauge) to the fuel return side of the leakage pipe, and maintain 100 kPa (1.0 kgf/cm2, 14.5 psi) of pressure for 60 seconds to check that no bubbles form.
After checking for fuel leaks, wipe off the soapy water from the leakage pipe connection.
Remove SST, No. 2 nozzle leakage pipe and gasket.
| 8. INSTALL CYLINDER BLOCK INSULATOR (w/ EGR Cooler) |
![]() |
Install the block insulator to the head.
| 9. INSTALL NO. 2 TIMING BELT COVER |
![]() |
Apply seal packing (FIPG) to the specified areas shown in the illustration.
Install the No. 2 timing belt cover with the 4 bolts and nut.
| 10. INSTALL CAMSHAFT TIMING PULLEY |
![]() |
Install the camshaft timing pulley.
Fasten the bolt of the camshaft timing pulley by holding the camshaft with a wrench.
| 11. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
![]() |
Remove any old seal packing (FIPG) material from the cylinder head.
Apply seal packing to the specific areas shown in the illustration.
![]() |
Install the gasket and cylinder head cover with the 10 bolts and 2 nuts.
| 12. INSTALL NOZZLE HOLDER SEAL |
Install 4 new nozzle holder seals.
| 13. INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY |
Install the timing belt idler and new washer with the bolt.
| 14. INSTALL TIMING BELT |
![]() |
Check that the timing marks are aligned as shown in the illustration.
Using a 10 mm hexagon wrench, install the timing belt idler pulley and new washer with the bolt.
Check that the idler pulley moves smoothly.
If it does not move smoothly, check the idler sub-assembly and washer.
Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.
![]() |
Place the tensioner upright. Then set the press to the top of the tensioner.
Using a press, slowly push in the push rod using 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force.
Align the holes of the push rod and housing. Then pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.
Install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.
Tighten the 2 bolts.
![]() |
Remove the 1.5 mm hexagon wrench from the tensioner.
![]() |
Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.
| 15. INSTALL NO. 1 TIMING BELT COVER |
Install the timing belt cover with the 6 bolts.
Install the wire harness clamp.
Install the water hose clamp with the bolt.
| 16. INSTALL INTAKE MANIFOLD (w/ EGR Cooler) |
Install the intake manifold (Click here).
| 17. INSTALL INTAKE MANIFOLD (w/o EGR Cooler) |
![]() |
Install a new gasket and the manifold to the cylinder head withe the 4 bolts and 2 nuts in the order shown in the illustration.
| 18. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY (w/o EGR Cooler) |
Temporarily install the No. 2 nozzle leakage pipe with the 3 bolts.
Temporarily install a new gasket and the union bolt.
Tighten the 3 bolts and union bolt.
Connect the 3 fuel hoses.
| 19. INSTALL NO. 4 INJECTION PIPE |
Temporarily install the No. 4 injection pipe with the union nuts.
Install the 2 bolts.
![]() |
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the injector side.
| 20. INSTALL NO. 1, NO. 2 AND NO. 4 INJECTION PIPE (w/o EGR Cooler) |
![]() |
Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.
Install the No. 2 and No. 3 injection pipe clamps with the bolt and 2 nuts, as shown in the illustration.
![]() |
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
| 21. CONNECT WIRE HARNESS (w/o EGR Cooler) |
| 22. INSTALL MANIFOLD STAY (w/o EGR Cooler) |
![]() |
Install the manifold stay with the 2 bolts.
| 23. INSTALL GLOW PLUG ASSEMBLY |
w/ EGR Cooler:
Install the glow plug assembly (Click here).
w/ EGR System:
Install the glow plug assembly (Click here).
w/o EGR System:
Install the glow plug assembly (Click here).
| 24. INSTALL EXHAUST MANIFOLD |
![]() |
w/ EGR Cooler:
Install a new gasket, manifold, 8 new collars and 8 spacers to the cylinder head with 8 new nuts.
w/o EGR Cooler:
Install a new gasket, manifold and 8 spacers to the cylinder head with 8 new nuts.
| 25. INSTALL TURBOCHARGER SUB-ASSEMBLY |
w/ EGR Cooler:
Install the turbocharger sub-assembly (Click here).
w/o EGR Cooler:
Install the turbocharger sub-assembly (Click here).
| 26. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (for Cold Area Specification Vehicles) |
Install the bracket with the 2 bolts.
| 27. INSTALL VISCOUS WITH MAGNET CLUTCH HEATER ASSEMBLY (for Cold Area Specification Vehicles) |
![]() |
Install the viscous with magnet clutch heater with the 2 bolt.
Connect the connect.
| 28. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning System) |
Install the No. 1 compressor mounting bracket with the 4 bolts.
| 29. INSTALL COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System) |
Install the cooler compressor with the 4 bolts.
| 30. INSTALL FAN PULLEY |
Install the fan pulley with the 4 nuts.
| 31. INSTALL FAN SHROUD |
Install the fan pulley to the water pump.
Install the shroud together with the coupling fan between the radiator and engine component.
Install the fluid coupling fan to the fan pulley with the 4 nuts.
Tighten the nuts as much as possible by hand.
![]() |
Attach the shroud's claws to the radiator.
Install the shroud with the 2 bolts.
Install the drive belt .
Tighten the 4 nuts of the fluid coupling fan.
![]() |
Install the radiator reservoir with the 2 bolts.
Connect the No. 1 and No. 2 water by-pass hoses to the tank upper and lower.
![]() |
Install the oil reservoir with the 3 bolts.
| 32. ADD FUEL |
| 33. TIGHTEN FUEL TANK CAP ASSEMBLY |
| 34. ADD ENGINE OIL |
| 35. BLEED AIR FROM FUEL SYSTEM |
![]() |
Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.
Start the engine.
When the engine can be started, proceed to the next step.
If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.
Turn the ignition switch off.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON and turn the intelligent tester on.
Clear the DTCs (Click here).
Start the engine.*1
![]() |
Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2
Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3
Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.

Enter the following menus: Powertrain / Engine and ECT / DTC.
Read Current DTCs.
Clear the DTCs (Click here).
Repeat steps *1 to *3.
Enter the following menus: Powertrain / Engine and ECT / DTC.
Read Current DTCs.
| 36. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 37. PERFORM REGISTRATION |
Perform registration of the injector compensation codes .
Perform pilot quantity learning .
| 38. PERFORM INITIALIZATION |
Perform initialization of the crank time compensation reset function (Click here).
| 39. CHECK FOR ENGINE OIL LEAKS |
| 40. INSPECT FOR FUEL LEAK |
![]() |
Check that there are no leaks from any part of the fuel system when the engine is stopped.
If there is fuel leakage, repair or replace parts as necessary.
Start the engine and check that there are no leaks from any part of the fuel system.
If there is fuel leakage, repair or replace parts as necessary.
Disconnect the return hose from the common rail.
Start the engine and check for fuel leaks from the return pipe.
If there is fuel leakage, replace the common rail.
Connect the intelligent tester to the DLC3.
Start the engine and push the intelligent tester main switch ON.
Select the Fuel Leak test from the Active Test mode on the intelligent tester.
If the intelligent tester is not available, fully depress the accelerator pedal quickly. Increase the engine speed to the maximum and maintain that speed for 2 seconds. Repeat this operation several times.
Check that there are no leaks from any part of the fuel system.
Reconnect the return hose to the common rail.
| 41. CHECK OIL LEVEL |