When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
After removing the injection pipes, clean them with a brush and compressed air.
1.INSTALL TIMING GEAR CASE ASSEMBLY
2.INSTALL OIL STRAINER SUB-ASSEMBLY
3.INSTALL OIL PAN SUB-ASSEMBLY
4.INSTALL INJECTION GEAR
5.INSTALL CRANKSHAFT TIMING GEAR
6.INSTALL NO. 1 IDLE GEAR SHAFT
7.INSTALL NO. 1 IDLE GEAR
8.INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
9.INSTALL TIMING GEAR COVER
10.INSTALL CRANKSHAFT PULLEY
11.INSTALL PUMP DRIVE SHAFT PULLEY
Install a new O-ring to the fuel supply pump.
Temporarily install the fuel supply pump with the nut.
Using SST, hold the crankshaft pulley and tighten the nut.
Install the No. 2 camshaft timing pulley flange and pump drive shaft pulley with the 4 bolts.
Using a dial indicator, check the thrust clearance of the pump drive shaft while moving the pump drive shaft pulley back and forth.
0.15 to 0.55 mm (0.00591 to 0.0217 in.)
If the clearance is not within the specified range, remove and reinstall the fuel supply pump and pump drive shaft pulley. Then repeat the step above.
12.INSTALL CRANKSHAFT POSITION SENSOR
13.INSTALL CAMSHAFT POSITION SENSOR
14.INSTALL VANE PUMP ASSEMBLY
15.INSTALL VACUUM PUMP ASSEMBLY
16.INSTALL TIMING GEAR COVER INSULATOR (w/ EGR Cooler)
17.INSTALL WATER PUMP ASSEMBLY
18.INSTALL NO. 2 TIMING BELT COVER
19.INSTALL CAMSHAFT TIMING PULLEY
20.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
21.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
22.INSTALL FUEL INLET PIPE SUB-ASSEMBLY
23.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
24.INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
25.TEMPORARILY INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY WITH NO. 2 EGR VALVE AND EGR COOLER (w/ EGR Cooler)
26.INSTALL NO. 2 INTAKE AIR CONNECTOR (w/ EGR Cooler)
27.TEMPORARILY INSTALL INTAKE AIR CONNECTOR (w/ EGR Cooler)
28.TIGHTEN INTAKE AIR CONNECTOR (w/ EGR Cooler)
29.TIGHTEN EGR COOLER (w/ EGR Cooler)
30.INSTALL NO. 2 INTAKE AIR CONNECTOR BRACKET (w/ EGR Cooler)
31.INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY (w/ EGR Cooler)
32.INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY
33.CONNECT NO. 4 WATER BY-PASS HOSE (w/ EGR Cooler)
34.CONNECT NO. 3 WATER BY-PASS HOSE (w/ EGR Cooler)
35.INSTALL MANIFOLD STAY (w/o EGR Cooler)
36.INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE (w/ EGR Cooler)
37.INSTALL DIESEL THROTTLE BODY ASSEMBLY (w/ EGR Cooler)
38.INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning System)
39.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
40.INSTALL GENERATOR BRACKET
41.INSTALL GENERATOR ASSEMBLY
42.INSTALL NO. 2 IDLE PULLEY ASSEMBLY
43.INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY
44.INSTALL TIMING BELT
45.INSTALL NO. 1 TIMING BELT COVER
46.INSTALL ENGINE ASSEMBLY
48.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
49.BLEED AIR FROM FUEL SYSTEM
50.ADD ENGINE COOLANT
51.BLEED AIR FROM POWER STEERING SYSTEM
52.INSPECT POWER STEERING FLUID LEVEL
53.PERFORM REGISTRATION
Perform registration of the injector compensation codes.
w/ EGR Cooler: (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/ EGR Cooler)>REGISTRATION)
w/o EGR Cooler: (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>REGISTRATION)
Perform pilot quantity learning.
w/ EGR Cooler: (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/ EGR Cooler)>REGISTRATION)
w/o EGR Cooler: (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>REGISTRATION)
54.INSPECT FOR OIL LEAK
55.INSPECT FOR COOLANT LEAK
56.INSPECT EXHAUST GAS LEAK
57.INSPECT FOR FUEL LEAK
58.INSPECT ENGINE OIL LEVEL