Home › Power Source / Network › NETWORKING › NETWORK GATEWAY ECU › 2015.06–2017.08
RM27T0E _57 Power Source / Network _053729 NETWORKING _0261035 NETWORK GATEWAY ECU A

NETWORKING  NETWORK GATEWAY ECU  INSTALLATION  


CAUTION / NOTICE / HINT

HINT:
·

A bolt without a torque specification is shown in the standard bolt chart (See page General>SPECIFICATIONS>STANDARD BOLT>SPECIFIED TORQUE FOR STANDARD BOLTS).

·

Use the same procedure for LHD and RHD vehicles.

·

The procedure listed below is for LHD vehicles.



PROCEDURE

Hide 89111 1.INSTALL NETWORK GATEWAY ECU

a.

Attach the 2 claws to install the network gateway ECU to the ECU integration box RH.


Hide 82877 2.INSTALL ECU INTEGRATION BOX RH

a.

Install the ECU integration box RH with the 2 nuts and bolt.


b.

Attach the harness clamp.


c.

Connect the connectors.

NOTICE:
·

Do not twist the connectors of ECU when connecting them.

·

Do not apply more force than necessary to the connectors. If more than 98 N (10 kgf, 22 lbf) of force is applied to a connector, the connector or connector holder may be damaged.




Hide 55607 7.INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

Hide 62111C 8.INSTALL COWL SIDE TRIM BOARD RH

Hide 67910 9.INSTALL DOOR SCUFF PLATE ASSEMBLY RH

Hide 10.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).