When replacing the parts in the following chart (A), replace the No. 1 injection pipe subassembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.
| Replaced Parts (A) | Pipes Requiring New Replacement |
|---|---|
| Injector assembly (including shuffling the injector assemblies between the cylinders) | ·
No. 1 injection pipe sub-assembly ·
No. 2 injection pipe sub-assembly |
| Supply pump assembly | Fuel inlet pipe sub-assembly |
·
Common rail assembly ·
Cylinder block sub-assembly ·
Cylinder head sub-assembly ·
Cylinder head gasket ·
Timing chain case assembly |
·
No. 1 injection pipe sub-assembly ·
No. 2 injection pipe sub-assembly ·
Fuel inlet pipe sub-assembly |
After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
The common rail assembly is a precision instrument. Do not use the common rail assembly if it is struck or dropped.
Hold the common rail assembly itself during removal and installation. Do not hold the pressure discharge valve etc.
Make sure foreign matter does not enter the fuel path.
23810A
1.INSTALL COMMON RAIL ASSEMBLY
Install the common rail assembly with the 2 nuts.
23282D
2.INSTALL NO. 4 FUEL HOSE
Connect the No. 4 fuel hose to the common rail assembly, and slide the clamp to secure it.
3.TEMPORARILY INSTALL NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
4.TIGHTEN NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
5.INSTALL WIRING HARNESS CLAMP BRACKET
23804C
6.INSTALL FUEL INLET PIPE SUB-ASSEMBLY
23815D
7.INSTALL NO. 3 FUEL PIPE
23804D
8.INSTALL NO. 4 FUEL PIPE SUB-ASSEMBLY (w/ DPF)
17118
9.INSTALL MANIFOLD STAY
23811H
10.INSTALL NO. 1 FUEL PIPE (w/ DPF)
89463C
11.CONNECT NO. 1 NITROGEN OXIDES SENSOR (w/ Urea SCR System)
Connect the No. 1 nitrogen oxides sensor with the 2 bolts to the cylinder head cover sub-assembly.
Connect the No. 1 nitrogen oxides sensor connector.
25624
12.INSTALL EGR VALVE ADAPTER (w/o EGR System)
82121
13.CONNECT ENGINE WIRE (w/o EGR System)
44306
14.CONNECT VANE PUMP OIL RESERVOIR SUB-ASSEMBLY (w/o EGR System)
12632
15.INSTALL NO. 2 ENGINE COVER BRACKET (w/o EGR System)
12633
16.INSTALL NO. 3 ENGINE COVER BRACKET (w/o EGR System)
16278
17.INSTALL NO. 2 WATER BY-PASS PIPE (w/o EGR System)
87209
18.INSTALL WATER HOSE SUB-ASSEMBLY (w/o EGR System)
26100G
19.INSTALL DIESEL THROTTLE BODY ASSEMBLY (w/o EGR System)
55781E
20.INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (w/o EGR System)
25800
21.INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR System without EGR Cooler)
25800
22.INSTALL EGR COOLER ASSEMBLY (w/ EGR System with EGR Cooler)
23.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
24. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART
25.ADD ENGINE COOLANT (w/o EGR System)
26.INSPECT FOR COOLANT LEAK (w/o EGR System)
27.BLEED AIR FROM FUEL SYSTEM
28.INSPECT FOR FUEL LEAK