Home › Engine / Hybrid / EV System › 1VD-FTV ENGINE CONTROL › ECD SYSTEM (w/o DPF)
Cranking Holding Function Circuit
Circuit diagnosis · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
DESCRIPTION
The cranking holding control system provides current to the starter when the ECM detects the ignition switch start signal (STSW). When the ECM performs a firing judgment, the system cuts current to the starter. When an ECM receives the STSW signal, it turns on the ST CUT relay, which prevents flickering of the combination meter, clock, audio system, etc. Also, the ECM sends a signal to the ECM STAR terminal of the ECMl. Then the STAR output signal travels through the park/neutral position (PNP) switch to the ST relay, causing the starter to activate. When the engine is cranking, the starter operation signal is sent to the ECM STA terminal of the ECM. WIRING DIAGRAM
INSPECTION PROCEDURE
1. CHECK CRANKING
Check the cranking of the engine.
Result:
Test Result
Proceed to
Cranking possible and holding control operates
A
Does not crank
B
Cranking possible but holding control does not operate
C
B
C
A
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here )
2. READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the intelligent tester on.
Enter the following menus: Powertrain / Engine / Data List / Starter Signal.
Read the values.
Check the result when the ignition switch is turned to ON and when the engine is started.
OK:
Ignition Switch Condition
Display (Starter Signal)
ON
OFF
Engine started
ON
NG
OK
3. INSPECT STARTER RELAY (ST)
Inspect the starter relay (ST) (Click here ).
NG
REPLACE STARTER RELAY (ST)
OK
4. CHECK HARNESS AND CONNECTOR (PNP SWITCH - ST RELAY)
Disconnect the Park/Neutral Position (PNP) switch.
Remove the ST relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open):
Tester Connection
Condition
Specified Condition
ST relay (1) - C24-5
Always
Below 1 Ω
Standard Resistance (Check for Short):
Tester Connection
Condition
Specified Condition
ST relay (1) or D24-5 - Body ground
Always
10 kΩ or higher
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
5. CHECK HARNESS AND CONNECTOR (POWER SOURCE)
Remove the ST relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
Condition
Specified Condition
ST relay (2) - ST relay (5)
Always
11 to 14 V
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER RELAY (ST) - BATTERY, BODY GROUND)
OK
6. INSPECT STARTER
Inspect the starter (Click here ).
Result:
Test Result
Proceed to
OK
A
NG
B
B
A
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER - STARTER RELAY (ST), BATTERY)
7. INSPECT STARTER CUT RELAY (ST CUT)
Inspect the starter cut relay (ST CUT) (Click here ).
NG
REPLACE STARTER CUT RELAY (ST CUT)
OK
8. CHECK HARNESS AND CONNECTOR (ST CUT RELAY - PNP SWITCH, ECM)
Remove the starter cut relay (ST CUT) from the engine room relay block.
Disconnect the PNP switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open):
for LHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) - C45-63 (STAR)
Always
Below 1 Ω
ST CUT relay (3) - C24-4
Always
Below 1 Ω
for RHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) - C46-63 (STAR)
Always
Below 1 Ω
ST CUT relay (3) - C24-4
Always
Below 1 Ω
Standard Resistance (Check for Short):
for LHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) or C45-63 (STAR) - Body ground
Always
10 kΩ or higher
ST CUT relay (3) or C24-4 - Body ground
Always
10 kΩ or higher
for RHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) or C46-63 (STAR) - Body ground
Always
10 kΩ or higher
ST CUT relay (3) or C24-4 - Body ground
Always
10 kΩ or higher
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
9. INSPECT PARK/NEUTRAL POSITION SWITCH
Inspect the Park/Neutral Position (PNP) switch.
Disconnect the PNP switch connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
4 (B) - 5 (L)
Shift lever in P
Below 1 Ω
Shift lever in N
Below 1 Ω
NG
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY (Click here )
OK
10. CHECK HARNESS AND CONNECTOR (PNP SWITCH - ECM)
Disconnect the PNP switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open):
for LHD
Tester Connection
Condition
Specified Condition
C24-5 - A38-46 (STA)
Always
Below 1 Ω
for RHD
Tester Connection
Condition
Specified Condition
C24-5 - A52-46 (STA)
Always
Below 1 Ω
Standard Resistance (Check for Short):
for LHD
Tester Connection
Condition
Specified Condition
C24-5 or A38-46 (STA) - Body ground
Always
10 kΩ or higher
for RHD
Tester Connection
Condition
Specified Condition
C24-5 or A52-46 (STA) - Body ground
Always
10 kΩ or higher
Result
Result
Proceed to
NG
A
OK
B
B
A
REPAIR OR REPLACE HARNESS OR CONNECTOR
11. CHECK HARNESS AND CONNECTOR (MAIN BODY ECU - ECM)
Disconnect the main body ECU connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open):
for LHD
Tester Connection
Condition
Specified Condition
E4-4 (STSW) - A38-14 (STSW)
Always
Below 1 Ω
for RHD
Tester Connection
Condition
Specified Condition
E4-4 (STSW) - A52-14 (STSW)
Always
Below 1 Ω
Standard Resistance (Check for Short):
for LHD
Tester Connection
Condition
Specified Condition
E4-4 (STSW) or A38-14 (STSW) - Body ground
Always
10 kΩ or higher
for RHD
Tester Connection
Condition
Specified Condition
E4-4 (STSW) or A52-14 (STSW) - Body ground
Always
10 kΩ or higher
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
12. CHECK HARNESS AND CONNECTOR (ST CUT RELAY - PNP SWITCH, ECM)
Remove the starter cut relay (ST CUT) from the engine room relay block.
Disconnect the PNP switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open):
for LHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) - C45-63 (STAR)
Always
Below 1 Ω
ST CUT relay (3) - C24-4
Always
Below 1 Ω
for RHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) - C46-63 (STAR)
Always
Below 1 Ω
ST CUT relay (3) - C24-4
Always
Below 1 Ω
Standard Resistance (Check for Short):
for LHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) or C45-63 (STAR) - Body ground
Always
10 kΩ or higher
ST CUT relay (3) or C24-4 - Body ground
Always
10 kΩ or higher
for RHD
Tester Connection
Condition
Specified Condition
ST CUT relay (5) or C46-63 (STAR) - Body ground
Always
10 kΩ or higher
ST CUT relay (3) or C24-4 - Body ground
Always
10 kΩ or higher
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
13. REPLACE ECM
Replace the ECM (Click here ).
NEXT
14. CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
Check the starter operation.
OK:
Malfunction has been repaired successfully.
NG
GO TO ENTRY AND START SYSTEM (ENGINE DOES NOT START) (Click here )
OK