Home › Engine / Hybrid System › 1UR-FE (ENGINE CONTROL) › SFI SYSTEM › 2015.08–2016.08
RM2660E _51 Engine / Hybrid System _052772 1UR-FE ENGINE CONTROL _0254983 SFI SYSTEM C

1UR-FE ENGINE CONTROL  SFI SYSTEM  P2440  Secondary Air Injection System Switching Valve Stuck Open Bank1  P2441  Secondary Air Injection System Switching Valve Stuck Close Bank1  P2442  Secondary Air Injection System Switching Valve Stuck Open Bank 2  P2443  Secondary Air Injection System Switching Valve Stuck Closed Bank 2  


DESCRIPTION

Refer to DTC P0412 (See page Engine / Hybrid System>1UR-FE (ENGINE CONTROL)>SFI SYSTEM>P0412).

DTC No. DTC Detection Condition Trouble Area
P2440 The air switching valve (for Bank 1) is stuck open for approximately 60 seconds after the engine is started cold (1 trip detection logic).
·

Air switching valve assembly

·

Open or short in air switching valve circuit

·

Secondary Air Injection system piping

·

Pressure sensor

·

Pressure sensor circuit

·

Air injection control driver

·

ECM


The air switching valve (for Bank 1) is stuck open for 5 seconds or more while the engine is running (1 trip detection logic).
P2441 The air switching valve (for Bank 1) is stuck closed for approximately 60 seconds after the engine is started cold (2 trip detection logic)..
·

Air switching valve assembly

·

Open or short in air switching valve circuit

·

Secondary Air Injection system piping

·

Pressure sensor

·

Pressure sensor circuit

·

Air injection control driver

·

ECM

·

Open or short in air pump heater circuit

·

No. 2 integration relay (AIR PMP HTR)

·

Air pump assembly


The air switching valve (for Bank 1) is stuck closed for 5 seconds or more while the engine is running (2 trip detection logic).
P2442 The air switching valve (for Bank 2) is stuck open for approximately 60 seconds after the engine is started cold (1 trip detection logic).
·

Air switching valve assembly

·

Open or short in air switching valve circuit

·

Secondary Air Injection system piping

·

Pressure sensor

·

Pressure sensor circuit

·

Air injection VSV relay (AI VLV)

·

ECM


The air switching valve (for Bank 2) is stuck open for 5 seconds or more while the engine is running (1 trip detection logic).
P2443 The air switching valve (for Bank 2) is stuck closed for approximately 60 seconds after the engine is started cold (2 trip detection logic).
·

Air switching valve assembly

·

Open or short in air switching valve circuit

·

Secondary Air Injection system piping

·

Pressure sensor

·

Pressure sensor circuit

·

Air injection VSV relay (AI VLV)

·

ECM

·

Open or short in air pump heater circuit

·

No. 2 integration relay (AIR PMP HTR)

·

Air pump assembly


The air switching valve (for Bank 2) is stuck closed for 5 seconds or more while the engine is running (2 trip detection logic).

HINT:

Air switching valve normal operation:

When the air switching valve is open, exhaust gas pulsation occurs in the secondary air passage.

When the air switching valve is closed, exhaust gas pulsation does not occur in the secondary air passage.


MONITOR DESCRIPTION

DTCs P2440 and P2442 indicate that the air switching valve is stuck open. The ECM performs diagnosis of the secondary air injection system based on the pressure pulsation when the system is not operating. If a malfunction is detected, the ECM illuminates the MIL and stores a DTC.

CONFIRMATION DRIVING PATTERN

NOTICE:
·

This Secondary Air Injection Check only allows technicians to operate the Secondary Air Injection system for a maximum of 5 seconds. Furthermore, the check can only be performed up to 4 times per trip. If the test is repeated, intervals of at least 30 seconds are required between checks. While Secondary Air Injection system operation using the GTS is prohibited, the GTS display indicates the prohibition (WAIT or ERROR). If ERROR is displayed on the GTS during the test, stop the engine for 10 minutes, and then try again.

·

Performing Secondary Air Injection Check repeatedly may cause damage to the secondary air injection system. If it is necessary to repeat the check, leave an interval of several minutes between System Check operations to prevent the system from overheating.

·

When performing the Secondary Air Injection Check operation after the battery cable has been reconnected, wait for 7 minutes with the engine switch turned on (IG) or the engine running.

·

Turn the engine switch off when the Secondary Air Injection Check operation finishes.



1.

Start the engine and warm it up.

2.

Turn the engine switch off.

3.

Connect the GTS to the DLC3.

4.

Turn the engine switch on (IG).

5.

Turn the GTS on.

6.

Clear DTCs (even if no DTCs are stored, perform the clear DTC operation) (See page Engine / Hybrid System>1UR-FE (ENGINE CONTROL)>SFI SYSTEM>DTC CHECK / CLEAR).

7.

Turn the engine switch off and wait for at least 30 seconds.

8.

Turn the engine switch on (IG) and turn the GTS on.

9.

Enter the following menus: Powertrain / Engine and ECT / Utility / Secondary Air Injection Check / Automatic Mode.

10.

Start the engine after the GTS initialization is finished.

11.

Perform the System Check operation by pressing ENTER (Next).

12.

Perform the following to confirm the Secondary Air Injection system pending codes: Press ENTER (Exit).

13.

Check for pending DTCs.

OK:

No pending DTC is output.


14.

After "Secondary Air Injection Check" is completed, check for All Readiness by entering the following menus: Powertrain / Engine and ECT / Utility / All Readiness.

15.

Input the DTC: P2440 or P2442.

16.

Check the DTC judgment result.

GTS Display Description
NORMAL
·

DTC judgment completed

·

System normal


ABNORMAL
·

DTC judgment completed

·

System abnormal


INCOMPLETE
·

DTC judgment not completed

·

Perform driving pattern after confirming DTC enabling conditions


N/A
·

Unable to perform DTC judgment

·

Number of DTCs which do not fulfill DTC preconditions has reached ECU memory limit



HINT:
·

If the judgment result shows NORMAL, the system is normal.

·

If the judgment result shows ABNORMAL, the system has a malfunction.



17.

Turn the engine switch off.


WIRING DIAGRAM

CAUTION / NOTICE / HINT

NOTICE:
·

This Secondary Air Injection Check only allows technicians to operate the secondary air injection system for a maximum of 5 seconds. Furthermore, the check can only be performed up to 4 times per trip. If the test is repeated, intervals of at least 30 seconds are required between checks. While secondary air injection system operation using the GTS is prohibited, the GTS display indicates the prohibition (WAIT or ERROR). If ERROR is displayed on the GTS during the test, stop the engine for 10 minutes, and then try again.

·

Performing Secondary Air Injection Check repeatedly may cause damage to the secondary air injection system. If it is necessary to repeat the check, leave an interval of several minutes between System Check operations to prevent the system from overheating.

·

When performing the Secondary Air Injection Check operation after the battery cable has been reconnected, wait for 7 minutes with the engine switch turned on (IG) or the engine running.

·

Turn the engine switch off when the Secondary Air Injection Check operation finishes.



HINT:
·

Bank 1 refers to the bank that includes the No. 1 cylinder*.

*: The No. 1 cylinder is the cylinder which is farthest from the transmission.

·

Bank 2 refers to the bank that does not include the No. 1 cylinder.



PROCEDURE

1.CHECK FOR ANY OTHER DTCS OUTPUT (IN ADDITION TO SECONDARY AIR INJECTION SYSTEM DTCS)
a.

Connect the GTS to the DLC3.


b.

Turn the engine switch on (IG).


c.

Turn the GTS on.


d.

Enter the following menus: Powertrain / Engine and ECT / Trouble Codes.


e.

Read DTCs and freeze frame data.

Result
Result Proceed to
P2440, P2441, P2442 and/or P2443 is output (w/ air pump heater) A
P2440, P2441, P2442 and/or P2443 is output (w/o air pump heater) B
P2440 and/or P2441 and P0412 are output C
P2442 and/or P2443 and P0416 and/or P0417 are output D
P2440, P2441, P2442 and/or P2443 and other DTCs (except P0412, P0416 and P0417) are output E


HINT:

If any DTCs other than P0412, P0416, P0417, P2440, P2441, P2442 and P2443 are output, troubleshoot those DTCs first.



A

2.CHECK FREEZE FRAME DATA (AIR PUMP FREEZE, AIR SWITCHING VALVE FREEZEAND AIR SWITCHING VALVE2 FREEZE)

B

9.PERFORM ACTIVE TEST USING GTS (SECONDARY AIR INJECTION SYSTEM OPERATION)

C

GO TO AIR SWITCHING VALVE INSPECTION PROCEDURE (P0412)

D

GO TO AIR SWITCHING VALVE INSPECTION PROCEDURE (P0416 AND P0417)

E

2.CHECK FREEZE FRAME DATA (AIR PUMP FREEZE, AIR SWITCHING VALVE FREEZEAND AIR SWITCHING VALVE2 FREEZE)
a.

Connect the GTS to the DLC3.


b.

Turn the engine switch on (IG) and turn the GTS on.


c.

Read the values of Air Pump Freeze, Air Switching Valve Freeze and Air Switching Valve2 Freeze from the freeze frame data recorded previously.


d.

Referring to the following table, proceed to the appropriate step according to the result of the data reading.

Result
Result Proceed to
Air Pump Freeze Air Switching Valve Freeze Air Switching Valve2 Freeze
OFF OFF OFF A
Except above B



A

3.PERFORM ACTIVE TEST USING GTS (ACTIVATE THE AIR PUMP HEATER)

B

8.INSPECT AIR PUMP ASSEMBLY
3.PERFORM ACTIVE TEST USING GTS (ACTIVATE THE AIR PUMP HEATER)
a.
U163342E02
0.156,0.083 0.333,0.281 0.177,0.198 10 false *a 1.552,0.156 1.917,0.323 0.365,0.167 10 false C139

Disconnect the air pump connector.


b.

Connect the GTS to the DLC3.


c.

Turn the engine switch on (IG) and turn the GTS on.


d.

Enter the following menus: Powertrain / Engine and ECT/ Active Test / Activate the Air Pump Heater.


e.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
C139-1 (APH+) - Body ground Activate the Air Pump Heater is ON 11 to 14 V


Text in Illustration
*a Front view of wire harness connector
(to Air Pump Assembly)


f.

Reconnect the air pump connector.



OK

4.INSPECT AIR PUMP (HEATER RESISTANCE)

NG

5.INSPECT AIR PUMP HEATER RELAY (AI-PMP HTR)
4.INSPECT AIR PUMP (HEATER RESISTANCE)
a.


OK

5.INSPECT AIR PUMP HEATER RELAY (AI-PMP HTR)

NG

5.INSPECT AIR PUMP HEATER RELAY (AI-PMP HTR)
a.

Inspect the No. 2 integration relay (AIR PMP HTR) (See page Engine / Hybrid System>1UR-FE (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).



OK

6.CHECK NO. 2 INTEGRATION RELAY (AIR PMP HTR) (POWER SOURCE)

NG

REPLACE AIR PUMP HEATER RELAY (AI-PMP HTR)

6.CHECK NO. 2 INTEGRATION RELAY (AIR PMP HTR) (POWER SOURCE)
a.

Remove the No. 2 integration relay (AIR PMP HTR).


b.
U163778E01
0.212,0.264 2.673,0.674 2.461,0.411 10 Front view of wire harness connector: (to No. 2 integration relay) 0.622,1.642 0.884,1.824 0.262,0.182 10 1X 0.954,1.619 1.216,1.801 0.262,0.182 10 *1 0.954,1.94 1.216,2.122 0.262,0.182 10 *2 0.622,1.98 0.884,2.162 0.262,0.182 10 1Y 0.37,2.747 1.155,2.930 0.786,0.182 10 *1: for RHD 1.475,2.747 2.261,2.930 0.786,0.182 10 *2: for LHD

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
for RHD
Tester Connection Condition Specified Condition
1X-1 - Body ground Always 11 to 14 V

for LHD
Tester Connection Condition Specified Condition
1Y-1 - Body ground Always 11 to 14 V



c.

Reinstall the No. 2 integration relay (AIR PMP HTR).



OK

7.CHECK (AIR PUMP - NO. 2 INTEGRATION RELAY (AIR PMP HTR), BODYGROUND)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

7.CHECK (AIR PUMP - NO. 2 INTEGRATION RELAY (AIR PMP HTR), BODYGROUND)
a.

Remove the No. 2 integration relay (AIR PMP HTR).


b.

Disconnect the air pump connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1P-9 - C139-1 (APH+) Always Below 1 Ω
C139-3 (APHG) - Body ground Always Below 1 Ω
1P-9 or C139-1 (APH+) - Body ground Always 10 kΩ or higher



d.

Reinstall the No. 2 integration relay (AIR PMP HTR).


e.

Reconnect the air pump connector.



OK

8.INSPECT AIR PUMP ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

8.INSPECT AIR PUMP ASSEMBLY
a.


OK

9.PERFORM ACTIVE TEST USING GTS (SECONDARY AIR INJECTION SYSTEM OPERATION)

NG

9.PERFORM ACTIVE TEST USING GTS (SECONDARY AIR INJECTION SYSTEM OPERATION)
a.
A277880E01
0.174,0.034 0.365,0.231 0.191,0.198 10 *A

A277881E01
0.141,0.081 0.378,0.282 0.237,0.201 10 *B

Perform a visual check:

i.

Start the engine and warm it up.


ii.

Turn the engine switch off.


iii.

Disconnect the No. 1 and No. 2 air injection system hoses.


iv.

Connect the GTS to the DLC3.


v.

Turn the engine switch on (IG).


vi.

Turn the GTS on.


vii.

Enter the following menus: Powertrain / Engine and ECT / Utility / Secondary Air Injection Check / Manual Mode / AIR PUMP: ON, ASV1: OPEN, ASV2: OPEN.

HINT:

When Manual Mode is selected, the GTS initialization (atmospheric pressure measurement) is performed automatically. The initialization takes 10 seconds. After the initialization, AIR PUMP and ASV operation can be selected.



viii.

Start the engine.


ix.

Perform the secondary air injection system forced operation while the engine is idling.


x.

Place your hand near the air switching valve port and check that the exhaust gas pressure pulsates when the air switching valve is turned on.

CAUTION:

To avoid the danger of being burned by the exhaust gas, bring your hand close to the valve port slowly.



xi.

Enter the following menus: Powertrain / Engine and ECT / Utility / Secondary Air Injection Check / Manual Mode / AIR PUMP: ON, ASV1: OPEN, ASV2: OPEN and AIR PUMP: ON, ASV1: CLOSE, ASV2: CLOSE.


xii.

Check that the exhaust gas does not pulsate when the ASV is turned off.


xiii.

Turn the engine switch off.

NOTICE:
·

This Secondary Air Injection Check only allows technicians to operate the secondary air injection system for a maximum of 5 seconds. Furthermore, the check can only be performed up to 4 times per trip. If the test is repeated, intervals of at least 30 seconds are required between checks. While secondary air injection system operation using the GTS is prohibited, the GTS display indicates the prohibition (WAIT or ERROR). If ERROR is displayed on the GTS during the test, stop the engine for 10 minutes, and then try again.

·

Performing Secondary Air Injection Check repeatedly may cause damage to the secondary air injection system. If it is necessary to repeat the check, leave an interval of several minutes between System Check operations to prevent the system from overheating.

·

When performing the Secondary Air Injection Check operation after the battery cable has been reconnected, wait for 7 minutes with the engine switch turned on (IG) or the engine running.

·

Turn the engine switch off when the Secondary Air Injection Check operation finishes.



OK:
Air Pump Operation Air Switching Valve Operation Exhaust Gas Pulsation
ON OFF Not detected
ON ON Detected


Text in Illustration
*A Bank 1
*B Bank 2




OK

10.INSPECT AIR SWITCHING VALVE ASSEMBLY (PRESSURE SENSOR)

NG

11.INSPECT AIR TUBE (BLOCKAGE AND LEAK)
10.INSPECT AIR SWITCHING VALVE ASSEMBLY (PRESSURE SENSOR)
a.

Connect the GTS to the DLC3.


b.

Turn the engine switch on (IG).


c.

Turn the GTS on.


d.

Enter the following menus: Powertrain / Engine and ECT / Data List / Air pump pressure (Absolute) and Air Pump2 Pressure (Absolute).


e.

Check the pressure displayed on the GTS.

Standard pressure:

45 to 135 kPa


HINT:

The GTS displays the air pump pressure as absolute pressure.



Result
Result Proceed to
OK A
NG (for Bank 1) B
NG (for Bank 2) C


A

END

B

C

11.INSPECT AIR TUBE (BLOCKAGE AND LEAK)
A277884

a.

Check that the air tubes are securely connected to both the exhaust manifold and the air switching valve.


b.

Inspect the air tube for blockages and damage.

OK:

No blockages in or damage to air tubes.




OK

12.INSPECT AIR SWITCHING VALVE ASSEMBLY

NG

REPLACE AIR TUBE

12.INSPECT AIR SWITCHING VALVE ASSEMBLY
a.

Inspect the air switching valve assembly for bank 1 (See page Engine / Hybrid System>1UR-FE (EMISSION CONTROL)>AIR SWITCHING VALVE(for Bank 1)>INSPECTION).


b.

Inspect the air switching valve assembly for bank 2 (See page Engine / Hybrid System>1UR-FE (EMISSION CONTROL)>AIR SWITCHING VALVE (for Bank 2)>INSPECTION).

Result
Result Proceed to
OK A
NG (for Bank 1) B
NG (for Bank 2) C



A

13.INSPECT AIR INJECTION VSV RELAY (AI VLV)

B

C

13.INSPECT AIR INJECTION VSV RELAY (AI VLV)
a.

Inspect the air injection VSV relay (AI VLV) (See page Engine / Hybrid System>1UR-FE (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).



OK

14.CHECK AIR INJECTION VSV RELAY (AI VLV) (POWER SOURCE)

NG

REPLACE AIR INJECTION VSV RELAY (AI VLV)

14.CHECK AIR INJECTION VSV RELAY (AI VLV) (POWER SOURCE)
A372426E01
0.12,0 0.422,0.205 0.302,0.205 10 *a 2.544,2.373 2.845,2.578 0.302,0.205 10 *1

a.

Remove the air injection VSV relay (AI VLV).


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
Air injection VSV relay (AI VLV) terminal 1 - Body ground Always 11 to 14 V


Text in Illustration
*a Engine Room Relay Block
*1 Air Injection VSV Relay (AI VLV)


c.

Reinstall the air injection VSV relay (AI VLV).



OK

15.CHECK HARNESS AND CONNECTOR (AIR INJECTION VSV RELAY (AI VLV) - ECM)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

15.CHECK HARNESS AND CONNECTOR (AIR INJECTION VSV RELAY (AI VLV) - ECM)
a.

Remove the air injection VSV relay (AI VLV).


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
for RHD
Tester Connection Condition Specified Condition
Air injection VSV relay (AI VLV) terminal 2 - C46-61 (AIR1) Always Below 1 Ω
Air injection VSV relay (AI VLV) terminal 2 or C46-61 (AIR1) - Body ground Always 10 kΩ or higher

for LHD
Tester Connection Condition Specified Condition
Air injection VSV relay (AI VLV) terminal 2 - C45-61 (AIR1) Always Below 1 Ω
Air injection VSV relay (AI VLV) terminal 2 or C45-61 (AIR1) - Body ground Always 10 kΩ or higher



d.

Reinstall the air injection VSV relay (AI VLV).


e.

Reconnect the ECM connector.



OK

16.CHECK HARNESS AND CONNECTOR (AIR SWITCHING VALVE ASSEMBLY FOR BANK 2 - AIRINJECTION VSV RELAY (AI VLV))

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

16.CHECK HARNESS AND CONNECTOR (AIR SWITCHING VALVE ASSEMBLY FOR BANK 2 - AIRINJECTION VSV RELAY (AI VLV))
a.

Disconnect the air switching valve assembly for bank 2 connector.


b.

Remove the air injection VSV relay (AI VLV).


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
C138-5 (+BL) - Air injection VSV relay (AI VLV) terminal 3 Always Below 1 Ω
C138-1 (GNDL) - Body ground Always Below 1 Ω
C138-5 (+BL) or Air injection VSV relay (AI VLV) terminal 3 - Body ground Always 10 kΩ or higher



d.

Reconnect the air switching valve assembly for bank 2 connector.


e.

Reinstall the air injection VSV relay (AI VLV).



OK

17.INSPECT AIR INJECTION CONTROL DRIVER (POWER SOURCE OF AIR INJECTION CONTROL DRIVER)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

17.INSPECT AIR INJECTION CONTROL DRIVER (POWER SOURCE OF AIR INJECTION CONTROL DRIVER)
U163344E01
1.554,0.284 1.842,0.447 0.288,0.163 10 C60 1.529,2.264 1.817,2.427 0.288,0.163 10 C61 0.617,1.918 1.162,2.095 0.545,0.177 10 BATT 1.408,1.349 0.875,1.869 false 0.94,3.861 1.068,4.038 0.128,0.177 10 E 2.373,3.861 2.616,4.038 0.242,0.177 10 +B 2.059,3.293 2.414,3.861 false 1.172,3.287 1.015,3.831 false 0.172,0.096 0.376,0.308 0.204,0.211 10 *a

a.

Disconnect the air injection control driver connectors.


b.

Turn the engine switch on (IG).


c.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
C60-1 (BATT) - Body ground Always 11 to 14 V (near battery voltage)
C61-5 (+B) - Body ground Engine switch on (IG) 11 to 14 V (near battery voltage)



d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
C61-1 (E) - Body ground Always Below 1 Ω


Text in Illustration
*a Front view of wire harness connector
(to Air Injection Control Driver)



OK

18.CHECK HARNESS AND CONNECTOR (ECM - AIR INJECTION CONTROL DRIVER)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

18.CHECK HARNESS AND CONNECTOR (ECM - AIR INJECTION CONTROL DRIVER)
a.

Disconnect the ECM connectors.


b.

Disconnect the air injection control driver connectors.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
for RHD
Tester Connection Condition Specified Condition
C46-28 (AIRV) - C61-3 (SIV) Always Below 1 Ω
C46-28 (AIRV) or C61-3 (SIV) - Body ground Always 10 kΩ or higher

for LHD
Tester Connection Condition Specified Condition
C45-28 (AIRV) - C61-3 (SIV) Always Below 1 Ω
C45-28 (AIRV) or C61-3 (SIV) - Body ground Always 10 kΩ or higher




OK

19.PERFORM ACTIVE TEST USING GTS

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

19.PERFORM ACTIVE TEST USING GTS
a.

Disconnect the air injection control driver connector.


U163355E02
1.385,2.615 1.188,3.104 false 1.521,2.615 1.479,3.094 false 1.677,2.625 1.875,3.115 false 1.813,2.625 2.281,3.115 false 0.677,2.469 1.01,2.646 0.333,0.177 10 false C61 0.979,1.875 1.219,2.052 0.24,0.177 10 false *a 1.094,3.146 1.281,3.323 0.188,0.177 10 false E 1.417,3.146 1.625,3.323 0.208,0.177 10 false DI 1.844,3.177 2.24,3.354 0.396,0.177 10 false SIV 2.26,3.177 2.667,3.354 0.406,0.177 10 false SIP 2.531,0.104 2.771,0.281 0.24,0.177 10 false *2 0.667,0.208 0.906,0.385 0.24,0.177 10 false *1 2.448,0.76 2.885,0.938 0.438,0.177 10 false AIDI 2.448,1.104 2.896,1.281 0.448,0.177 10 false AIRV 0.865,0.75 1.073,0.927 0.208,0.177 10 false DI 0.781,1.125 1.177,1.302 0.396,0.177 10 false SIV

b.

Connect terminals DI and SIV of the wire harness connector for the air injection control driver.

Text in Illustration
*1 Air Injection Control Driver
*2 ECM
*a Front view of wire harness connector
(to Air Injection Control Driver)


c.

Connect the GTS to the DLC3.


d.

Turn the engine switch on (IG) and turn the GTS on.


e.

Enter the following menus: Powertrain / Engine and ECT / Utility / Secondary Air Injection Check / Manual Mode / AIR PUMP: ON, ASV 1: OPEN, ASV 2: OPEN.

HINT:

When Manual Mode is selected, the GTS initialization (atmospheric pressure measurement) is performed automatically. The initialization takes 10 seconds. After the initialization, AIR PUMP and ASV operation can be selected.



f.

Start the engine.


g.

Perform the secondary air injection system forced operation while the engine is idling.


h.

Measure the voltage between the SIV and E terminals of the ECM connector when the secondary air injection system is ON and OFF.


i.

Turn the engine switch off.

NOTICE:
·

Performing Secondary Air Injection Check repeatedly may cause damage to the secondary air injection system. If it is necessary to repeat the check, leave an interval of several minutes between System Check operations to prevent the system from overheating.

·

When performing the Secondary Air Injection Check operation after the battery cable has been reconnected, wait for 7 minutes with the engine switch turned on (IG) or the engine running.

·

Turn the engine switch off when the Secondary Air Injection Check operation finishes.



Standard Voltage:
Tester Connection Condition Specified Condition
C61-3 (SIV) - C61-1 (E) AIR PUMP: ON, ASV: OPEN 0.5 to 2 V
C61-3 (SIV) - C61-1 (E) AIR PUMP: OFF, ASV: CLOSE 11 to 14 V



U163356E02
1.385,2.604 1.188,3.094 false 1.531,2.604 1.49,3.083 false 1.688,2.583 1.823,3.146 false 1.813,2.594 2.188,3.104 false 0.656,2.469 0.938,2.646 0.281,0.177 10 false C61 0.979,1.844 1.219,2.021 0.24,0.177 10 false *a 1.104,3.115 1.292,3.292 0.188,0.177 10 false E 1.417,3.135 1.625,3.313 0.208,0.177 10 false DI 1.771,3.177 2.167,3.354 0.396,0.177 10 false SIV 2.188,3.146 2.594,3.323 0.406,0.177 10 false SIP 2.531,0.063 2.771,0.24 0.24,0.177 10 false *2 0.667,0.208 0.906,0.385 0.24,0.177 10 false *1 2.448,0.74 2.885,0.917 0.438,0.177 10 false AIDI 2.448,1.083 2.896,1.26 0.448,0.177 10 false AIRP 0.865,0.729 1.073,0.906 0.208,0.177 10 false DI 0.781,1.083 1.177,1.26 0.396,0.177 10 false SIP

j.

Connect terminals DI and SIP of the wire harness connector for the air injection control driver.

Text in Illustration
*1 Air Injection Control Driver
*2 ECM
*a Front view of wire harness connector
(to Air Injection Control Driver)


k.

Connect the GTS to the DLC3.


l.

Turn the engine switch on (IG) and turn the GTS on.


m.

Enter the following menus: Powertrain / Engine and ECT / Utility / Secondary Air Injection Check / Manual Mode / AIR PUMP: ON, ASV 1: OPEN, ASV 2: OPEN.

HINT:

When Manual Mode is selected, the GTS initialization (atmospheric pressure measurement) is performed automatically. The initialization takes 10 seconds. After the initialization, AIR PUMP and ASV operation can be selected.



n.

Start the engine.


o.

Perform the secondary air injection system forced operation while the engine is idling.


p.

Measure the voltage between the SIP and E terminals of the ECM connector when the secondary air injection system is ON and OFF.


q.

Turn the engine switch off.

NOTICE:
·

Performing Secondary Air Injection Check repeatedly may cause damage to the secondary air injection system. If it is necessary to repeat the check, leave an interval of several minutes between System Check operations to prevent the system from overheating.

·

When performing the Secondary Air Injection Check operation after the battery cable has been reconnected, wait for 7 minutes with the engine switch turned on (IG) or the engine running.

·

Turn the engine switch off when the Secondary Air Injection Check operation finishes.



Standard Voltage:
Tester Connection Condition Specified Condition
C61-4 (SIP) - C61-1 (E) AIR PUMP: ON, ASV: OPEN 0.5 to 2 V
C61-4 (SIP) - C61-1 (E) AIR PUMP: OFF, ASV: CLOSE 11 to 14 V



r.

Reconnect the air injection control driver connector.



OK

20.REPLACE AIR INJECTION CONTROL DRIVER

NG

20.REPLACE AIR INJECTION CONTROL DRIVER
a.

Replace the air injection control driver (See page Engine / Hybrid System>1UR-FE (EMISSION CONTROL)>AIR INJECTION DRIVER>REMOVAL).



NEXT

21.CHECK WHETHER DTC OUTPUT RECURS (DTC P2440 AND/OR P2442)
21.CHECK WHETHER DTC OUTPUT RECURS (DTC P2440 AND/OR P2442)
a.

Start the engine and warm it up.


b.

Turn the engine switch off.


c.

Connect the GTS to the DLC3.


d.

Turn the engine switch on (IG).


e.

Turn the GTS on.



g.

Enter the following menus: Powertrain / Engine and ECT / Utility / Secondary Air Injection Check / Automatic Mode.


h.

Start the engine after the GTS initialization is finished.


i.

Perform the System Check operation by pressing ENTER (Next).


j.

Perform the following to confirm the secondary air injection system pending codes: Press the Exit button.


k.

Check pending DTCs.


l.

Turn the engine switch off.

OK:

No pending DTC output.


NOTICE:
·

When performing the Secondary Air Injection Check operation after the battery cable has been reconnected, wait for 7 minutes with the engine switch turned on (IG) or the engine running.

·

Turn the engine switch off when the Secondary Air Injection Check operation finishes.





OK

END

NG