The cranking holding control system provides current to the starter when the ECM detects the ignition switch start signal (STSW). When the ECM performs a firing judgment, the system cuts current to the starter. When an ECM receives the STSW signal, it turns on the ST CUT relay, which prevents flickering of the combination meter, clock, audio system, etc. Also, the ECM sends a signal to the ECM STAR terminal of the ECMl. Then the STAR output signal travels through the park/neutral position (PNP) switch to the ST relay, causing the starter to activate.
When the engine is cranking, the starter operation signal is sent to the ECM STA terminal of the ECM.
Refer to DTC P0617 (See page Engine / Hybrid System>1VD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/o DPF)>P0617).
Check the cranking of the engine.
| Test Result | Proceed to |
|---|---|
| Cranking possible and holding control operates | A |
| Does not crank | B |
| Cranking possible but holding control does not operate | C |
A
(See pageEngine / Hybrid System>1VD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/o DPF)>PROBLEM SYMPTOMS TABLE)
B
C
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the intelligent tester on.
Enter the following menus: Powertrain / Engine / Data List / Starter Signal.
Read the values.
Check the result when the ignition switch is turned to ON and when the engine is started.
| Ignition Switch Condition | Display (Starter Signal) |
|---|---|
| ON | OFF |
| Engine started | ON |
OK
NG
Inspect the starter relay (ST) (See page Engine / Hybrid System>1VD-FTV (STARTING)>RELAY>ON-VEHICLE INSPECTION).
OK
NG
Disconnect the Park/Neutral Position (PNP) switch.
Remove the ST relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST relay (2) - C24-5 | Always | Below 1 Ω |
| ST relay (2) or D24-5 - Body ground | Always | 10 kΩ or higher |
OK
NG
Remove the ST relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST relay (1) - ST relay (5) | Always | 11 to 14 V |
OK
NG
Inspect the starter (See page Engine / Hybrid System>1VD-FTV (STARTING)>STARTER>INSPECTION).
| Test Result | Proceed to |
|---|---|
| OK | A |
| NG | B |
A
B
Inspect the starter cut relay (ST CUT) (See page Engine / Hybrid System>1VD-FTV (STARTING)>RELAY>ON-VEHICLE INSPECTION).
OK
NG
Remove the starter cut relay (ST CUT) from the engine room relay block.
Disconnect the PNP switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST CUT relay (5) - C45-51 (STAR) | Always | Below 1 Ω |
| ST CUT relay (3) - C24-4 (B) | Always | Below 1 Ω |
| ST CUT relay (5) or C45-51 (STAR) - Body ground | Always | 10 kΩ or higher |
| ST CUT relay (3) or C24-4 (B) - Body ground | Always | 10 kΩ or higher |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST CUT relay (5) - C46-51 (STAR) | Always | Below 1 Ω |
| ST CUT relay (3) - C24-4 (B) | Always | Below 1 Ω |
| ST CUT relay (5) or C46-51 (STAR) - Body ground | Always | 10 kΩ or higher |
| ST CUT relay (3) or C24-4 (B) - Body ground | Always | 10 kΩ or higher |
OK
NG
Inspect the Park/Neutral Position (PNP) switch.
Disconnect the PNP switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 4 (B) - 5 (L) | Shift lever in P | Below 1 Ω |
| Shift lever in N | Below 1 Ω |
OK
NG
(See pageDrivetrain>AB60F (AUTOMATIC TRANSMISSION / TRANSAXLE)>PARK / NEUTRAL POSITION SWITCH>REMOVAL)
Disconnect the PNP switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C24-5 (L) - A38-48 (STA) | Always | Below 1 Ω |
| C24-5 (L) or A38-48 (STA) - Body ground | Always | 10 kΩ or higher |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C24-5 (L) - A52-48 (STA) | Always | Below 1 Ω |
| C24-5 (L) or A52-48 (STA) - Body ground | Always | 10 kΩ or higher |
| Result | Proceed to |
|---|---|
| NG | A |
| OK | B |
A
B
Disconnect the main body ECU connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| E4-4 (STSW) - A38-14 (STSW) | Always | Below 1 Ω |
| E4-4 (STSW) or A38-14 (STSW) - Body ground | Always | 10 kΩ or higher |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| E4-4 (STSW) - A52-14 (STSW) | Always | Below 1 Ω |
| E4-4 (STSW) or A52-14 (STSW) - Body ground | Always | 10 kΩ or higher |
OK
NG
Remove the starter cut relay (ST CUT) from the engine room relay block.
Disconnect the PNP switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST CUT relay (5) - C45-51 (STAR) | Always | Below 1 Ω |
| ST CUT relay (3) - C24-4 (B) | Always | Below 1 Ω |
| ST CUT relay (5) or C45-51 (STAR) - Body ground | Always | 10 kΩ or higher |
| ST CUT relay (3) or C24-4 (B) - Body ground | Always | 10 kΩ or higher |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST CUT relay (5) - C46-51 (STAR) | Always | Below 1 Ω |
| ST CUT relay (3) - C24-4 (B) | Always | Below 1 Ω |
| ST CUT relay (5) or C46-51 (STAR) - Body ground | Always | 10 kΩ or higher |
| ST CUT relay (3) or C24-4 (B) - Body ground | Always | 10 kΩ or higher |
OK
NG
Replace the ECM (See page Engine / Hybrid System>1VD-FTV (ENGINE CONTROL)>ECM>REMOVAL).
NEXT
Check the starter operation.
Malfunction has been repaired successfully.
OK
NG