Home › Engine / Hybrid System › 1VD-FTV (FUEL) › FUEL INJECTOR (w/ DPF) › from 2015.08
RM2660E _51 Engine / Hybrid System _052783 1VD-FTV FUEL _0255121 FUEL INJECTOR(w/ DPF) A

1VD-FTV FUEL  FUEL INJECTOR(w/ DPF)  INSTALLATION  


CAUTION / NOTICE / HINT

NOTICE:
·

When replacing an injector (including interchanging injectors between cylinders) or common rail, replace the corresponding injection pipes with new ones.

·

When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines (See page Engine / Hybrid System>1VD-FTV (EMISSION CONTROL)>EMISSION CONTROL SYSTEM>ON-VEHICLE INSPECTION).



PROCEDURE

Hide 1.INSTALL FUEL INJECTOR LH

NOTICE:
·

Be sure to install the fuel injector, holder clamp and bolt to their original positions.

·

Before installing the fuel injector, check for carbon, foreign matter, etc. on the seal surfaces of the cylinder head sub-assembly and fuel injector. If there is foreign matter, remove it before installing the fuel injector.



a.
A271223

Install 4 new injection nozzle seats to the cylinder head sub-assembly.


b.
A369258E01
0.64,0.915 0.871,1.098 0.231,0.183 10 *1 0.845,1.045 1.073,1.045 1.073,1.045 1.596,0.801 false

Install 4 new fuel injector seals to each fuel injector as shown in the illustration.

Text in Illustration
*1 Fuel Injector Seal


c.

Apply a light coat of clean engine oil to 4 new O-rings.


d.
A369259E01
0.604,1.275 0.852,1.452 0.248,0.177 10 *1 0.817,1.401 1.062,1.401 1.062,1.401 1.628,1.062 false

Install the O-rings to each fuel injector as shown in the illustration.

Text in Illustration
*1 O-Ring


e.

Insert the 4 injectors into the cylinder head sub-assembly.

NOTICE:
·

Insert the fuel injector until it touches the nozzle seat surface.

·

After installing the fuel injector to the cylinder head sub-assembly, the O-ring may prevent the fuel injector from fully seating. If so, pull out the fuel injector and reinstall it.

·

Always return an fuel injector to the same place it was removed from.




f.

For an fuel injector that has been replaced with a new fuel injector, register the injector compensation code (See page Engine / Hybrid System>1VD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ DPF)>REGISTRATION).


g.
A354209E01
2.971,1.049 3.155,1.204 0.185,0.155 10 *1 3.169,1.723 3.354,1.878 0.185,0.155 10 *2 2.968,2.174 3.153,2.329 0.185,0.155 10 *3 2.239,2.261 2.94,2.261 false 2.442,1.811 3.142,1.811 false 2.239,1.134 2.94,1.134 false

Temporarily install 4 new washers, 4 nozzle holder clamps and 4 new nozzle holder seals with the 4 clamp bolts.

Text in Illustration
*1 Washer
*2 Nozzle Holder Clamp
*3 Nozzle Holder Seal

NOTICE:
·
A278347E01
2.06,1.175 1.708,1.539 1.708,1.539 1.335,1.167 false 1.708,1.539 1.708,1.648 false 1.615,1.657 1.778,1.816 0.163,0.159 10 *1

The fork portion of the nozzle holder clamp must be set on the fuel injector.

·

Before tightening the bolts, check that the nozzle holder clamp is set properly.

·

To tighten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in a later step.

·

When tightening the bolts, be careful not to tilt the bolt and clamp.

·

Do not reuse the washer.



Text in Illustration
*1 Nozzle Holder Clamp


h.
A267323

Temporarily install the common rail LH with the 2 bolts.


i.
A271637

Temporarily install 4 new injection pipes to the common rail and fuel injector.


j.

Check the nozzle leakage pipe. Check there are no scratches or dents on the union seal surfaces. If scratches or dents are present, replace the nozzle leakage pipe.


k.
A271219

Temporarily install the No. 2 leakage pipe and 4 new gaskets with the 4 injector hollow screws and 2 bolts.

HINT:

To position the fuel injectors, loosely tighten the 4 hollow screws and 2 bolts.


Text in Illustration
V100135

Injector Hollow Screw
V100136

Bolt


l.

Tighten the 4 holder clamp bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


m.

Remove the 4 injection pipes.


n.

Remove the 2 bolts and common rail LH.


Hide 23762B 2.INSTALL NO. 2 NOZZLE LEAKAGE PIPE

a.

Tighten the 4 injector hollow screws and 2 bolts.

Torque:
for injector hollow screw : 18 N*m (184 kgf*cm, 13 ft.*lbf)
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 3.INSTALL FUEL INJECTOR RH

NOTICE:
·

Be sure to install the fuel injector, holder clamp and bolt to their original positions.

·

Before installing the fuel injector, check for carbon, foreign matter, etc. on the seal surfaces of the cylinder head sub-assembly and fuel injector. If there is foreign matter, remove it before installing the fuel injector.



a.
A271223

Install 4 new injection nozzle seats to the cylinder head sub-assembly.


b.
A369258E01
0.64,0.915 0.871,1.098 0.231,0.183 10 *1 0.845,1.045 1.073,1.045 1.073,1.045 1.596,0.801 false

Install 4 new fuel injector seals to each fuel injector as shown in the illustration.

Text in Illustration
*1 Fuel Injector Seal


c.

Apply a light coat of clean engine oil to 4 new O-rings.


d.
A369259E01
0.604,1.275 0.852,1.452 0.248,0.177 10 *1 0.817,1.401 1.062,1.401 1.062,1.401 1.628,1.062 false

Install the O-rings to each fuel injector as shown in the illustration.

Text in Illustration
*1 O-Ring


e.

Insert the 4 fuel injectors into the cylinder head sub-assembly.

NOTICE:
·

Insert the fuel injector until it touches the nozzle seat surface.

·

After installing the fuel injector to the cylinder head sub-assembly, the O-ring may prevent the fuel injector from fully seating. If so, pull out the fuel injector and reinstall it.

·

Always return an fuel injector to the same place it was removed from.




f.

For an fuel injector that has been replaced with a new injector, register the injector compensation code (See page Engine / Hybrid System>1VD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ DPF)>REGISTRATION).


g.
A354209E01
2.971,1.049 3.155,1.204 0.185,0.155 10 *1 3.169,1.723 3.354,1.878 0.185,0.155 10 *2 2.968,2.174 3.153,2.329 0.185,0.155 10 *3 2.239,2.261 2.94,2.261 false 2.442,1.811 3.142,1.811 false 2.239,1.134 2.94,1.134 false

Temporarily install 4 new washers, 4 nozzle holder clamps and 4 new nozzle holder seals with the 4 clamp bolts.

Text in Illustration
*1 Washer
*2 Nozzle Holder Clamp
*3 Nozzle Holder Seal

NOTICE:
·
A278347E01
2.06,1.175 1.708,1.539 1.708,1.539 1.335,1.167 false 1.708,1.539 1.708,1.648 false 1.615,1.657 1.778,1.816 0.163,0.159 10 *1

The fork portion of the nozzle holder clamp must be set on the fuel injector.

·

Before tightening the bolts, check that the nozzle holder clamp is set properly.

·

To tighten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in a later step.

·

When tightening the bolts, be careful not to tilt the bolt and clamp.

·

Do not reuse the washer.



Text in Illustration
*1 Nozzle Holder Clamp


h.
A271636

Temporarily install 4 new injection pipes to the common rail and fuel injector.


i.

Check the nozzle leakage pipe. Check that there are no scratches or dents on the union seal surfaces. If scratches or dents are present, replace the nozzle leakage pipe.


j.
A271215

Temporarily install the No. 1 leakage pipe and 4 new gaskets with the 4 injector hollow screws and union bolt.

HINT:

To position the injectors, loosely tighten the 4 hollow screws and union bolt.


Text in Illustration
V100135

Injector Hollow Screw
V100136

Union Bolt


k.

Tighten the 4 holder clamp bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


l.

Remove the 4 injection pipes.


Hide 23761A 4.INSTALL NO. 1 NOZZLE LEAKAGE PIPE

a.

Tighten the union bolt and 4 injector hollow screws.

Torque:
for union bolt : 21 N*m (214 kgf*cm, 15 ft.*lbf)
for injector hollow screw : 18 N*m (184 kgf*cm, 13 ft.*lbf)


b.

Install the fuel tube and No. 1 nozzle leakage pipe with the check valve and new gasket.

Torque:
32 N*m (321 kgf*cm, 23 ft.*lbf)


Hide 11227 7.INSTALL CYLINDER HEAD COVER INSULATOR RH

Hide 23711 10.INSTALL NO. 1 FUEL INJECTOR PROTECTOR

a.
A271211

Install the No. 1 fuel injector protector with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

HINT:

Press the ventilation hose clip against the No. 1 fuel injector protector as shown in the illustration.



Hide 11224 11.INSTALL CYLINDER HEAD COVER SILENCER RH

a.

Install the cylinder head cover silencer with the 4 bolts.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


Hide 23801L 12.INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE SUB-ASSEMBLY

Hide 23820A 13.INSTALL COMMON RAIL ASSEMBLY LH

Hide 11228A 14.INSTALL CYLINDER HEAD COVER INSULATOR LH

Hide 23712 16.INSTALL NO. 2 FUEL INJECTOR PROTECTOR

a.
A271212

Install the No. 2 fuel injector protector with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

HINT:

Press the ventilation hose clip against the No. 2 fuel injector protector as shown in the illustration.



b.

Attach the hose clamp.


Hide 11225 18.INSTALL CYLINDER HEAD COVER SILENCER LH

a.

Install the cylinder head cover silencer with the 4 bolts.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


Hide 25706 19.INSTALL NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the vacuum transmitting pipe with the 3 bolts.

Torque:
6.0 N*m (61 kgf*cm, 53 in.*lbf)


b.

Connect the 2 vacuum hoses.


Hide 25860 20.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for Engine Mounting)

a.

Install the vacuum switching valve with the bolt.

Torque:
6.0 N*m (61 kgf*cm, 53 in.*lbf)


b.

Connect the 2 vacuum hoses.


Hide 23706 21.INSTALL NO. 6 INJECTION PIPE SUB-ASSEMBLY

Hide 16268M 24.INSTALL NO. 3 WATER BY-PASS PIPE (w/o Viscous Heater)

Hide 23274D 25.CONNECT FUEL HOSE

Hide 17885 26.INSTALL NO. 1 AIR CLEANER PIPE SUB-ASSEMBLY

Hide 87208 27.INSTALL HEATER WATER PIPE SUB-ASSEMBLY (w/ Viscous Heater)

Hide 17806 28.INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY

Hide 17881 34.TEMPORARILY INSTALL NO. 1 AIR CLEANER HOSE

Hide 17947B 37.INSTALL NO. 3 INTERCOOLER SUPPORT BRACKET

Hide 87209 43.CONNECT WATER HOSE SUB-ASSEMBLY

Hide 17940D 44.INSTALL INTERCOOLER ASSEMBLY

Hide 45.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


a.

Connect the cables to the negative (-) main battery and sub-battery terminals.


Hide 53292A 51.INSTALL UPPER RADIATOR SUPPORT SEAL

Hide 51405A 52.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

Hide 53805 53.INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

Hide 53806 54.INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH