Home › Engine / Hybrid System › 1VD-FTV (LUBRICATION) › SCAVENGING PUMP › 2014.08–2015.08
RM2660E _51 Engine / Hybrid System _052799 1VD-FTV LUBRICATION _0255225 SCAVENGING PUMP A

1VD-FTV LUBRICATION  SCAVENGING PUMP  INSTALLATION  


CAUTION / NOTICE / HINT

NOTICE:
·

When replacing an injector (including interchanging injectors between cylinders) or common rail, replace the corresponding injection pipes with new ones.

·

w/DPF

When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines (See page Engine / Hybrid System>1VD-FTV (EMISSION CONTROL)>EMISSION CONTROL SYSTEM>ON-VEHICLE INSPECTION).



PROCEDURE

Hide 151A0 1.INSTALL SCAVENGING PUMP ASSEMBLY

a.

Install the scavenging pump with the 4 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 11381 3.INSTALL REAR ENGINE OIL SEAL RETAINER

Hide 12101 4.INSTALL NO. 1 OIL PAN SUB-ASSEMBLY

Hide 15104 5.INSTALL OIL STRAINER SUB-ASSEMBLY

Hide 12102A 6.INSTALL NO. 2 OIL PAN SUB-ASSEMBLY

Hide 15609 8.INSTALL OIL FILTER BRACKET SUB-ASSEMBLY

Hide 11348 10.INSTALL TIMING GEAR COVER SPACER (w/ Intercooler)

Hide 16620D 12.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

Hide 12158 15.INSTALL STIFFENER INSULATOR RH (w/ Intercooler)

Hide 15408G 16.INSTALL NO. 2 INLET TURBO OIL PIPE SUB-ASSEMBLY

Hide 15492 17.CONNECT NO. 2 OUTLET TURBO OIL HOSE

Hide 11452 18.INSTALL NO. 1 ENGINE OIL LEVEL DIPSTICK GUIDE

Hide 15474A 19.CONNECT NO. 1 OUTLET TURBO OIL HOSE

Hide 22.INSTALL ENGINE ASSEMBLY

a.

Install the engine assembly to the vehicle (See page Engine / Hybrid System>1VD-FTV (ENGINE MECHANICAL)>ENGINE ASSEMBLY>INSTALLATION).


Hide 23.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


a.

Connect the cables to negative (-) main battery and sub-battery terminals.