Home › Power Source / Network › NETWORKING › NETWORK GATEWAY ECU (for LHD) › from 2015.08
RM2660E _57 Power Source / Network _052837 NETWORKING _0255532 NETWORK GATEWAY ECU(for LHD) A

NETWORKING  NETWORK GATEWAY ECU(for LHD)  INSTALLATION  


CAUTION / NOTICE / HINT

HINT:

A bolt without a torque specification is shown in the standard bolt chart (See page General>SPECIFICATIONS>STANDARD BOLT>SPECIFIED TORQUE FOR STANDARD BOLTS).


PROCEDURE

Hide 89111 1.INSTALL NETWORK GATEWAY ECU

a.

Install the network gateway ECU with the bolt.


Hide 82731A 2.INSTALL COWL SIDE JUNCTION BLOCK RH

a.

Connect the back side of the 2 connectors and attach the wire harness clamp.


b.

Install the cowl side junction block RH with the 2 nuts and screw.

Torque:
for Nut : 7.6 N*m (77 kgf*cm, 67 in.*lbf)


c.

Connect the 5 connectors.


Hide 85940 3.INSTALL WINDSHIELD WIPER RELAY ASSEMBLY

Hide 55433B 4.INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL

Hide 55476A 6.INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH

Hide 55607 9.INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

Hide 55402C 12.INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH

Hide 55448A 13.INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION

Hide 14.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).