Home › Engine / Hybrid System › 1NZ-FXE (ENGINE CONTROL) › ECM › 2011.12–2015.11
RM2170E _51 Engine / Hybrid System _057003 1NZ-FXE ENGINE CONTROL _0277910 ECM A

1NZ-FXE ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89661 1.INSTALL ECM (for LHD)

a.

Install the No. 1 ECM bracket and No. 2 ECM bracket with the 4 screws.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


b.

Install the nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


c.

Install the ECM with the bolt and nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


d.
A275536

Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
·

When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.

·

Make sure that the 2 levers are securely locked.




Hide 55701J 2.INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (for LHD)

Hide 55815E 3.INSTALL FRONT NO. 1 VENTILATOR SEAL (for LHD)

Hide 55735B 4.INSTALL FRONT AIR SHUTTER SEAL (for LHD)

Hide 55722C 5.INSTALL INNER COWL TOP TO COWL BRACE (for LHD)

Hide 6.INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY (for LHD)

Hide 89661 7.INSTALL ECM (for RHD)

a.

Install the No. 1 ECM bracket and No. 2 ECM bracket with the 4 screws.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


b.

Install the ECM with the bolt and nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


c.
A275537

Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
·

When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.

·

Make sure that the 2 levers are securely locked.




Hide 8.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


Hide 10.PERFORM INITIALIZATION

HINT:

Initialization cannot be completed by only disconnecting and reconnecting the cable of the negative (-) auxiliary battery terminal.


a.

Perform Initialization when replacing the ECM (See page Engine / Hybrid System>1NZ-FXE (ENGINE CONTROL)>THROTTLE BODY>INSTALLATION).