Home › Engine / Hybrid System › 1NZ-FXE (ENGINE MECHANICAL) › ENGINE UNIT › 2014.12–2017.06
RM2170E _51 Engine / Hybrid System _057005 1NZ-FXE ENGINE MECHANICAL _0277949 ENGINE UNIT A

1NZ-FXE ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


PROCEDURE

Hide 15301 2.INSTALL ENGINE OIL LEVEL DIPSTICK

a.

Install the engine oil level dipstick.


Hide 3.INSTALL STUD BOLT

a.
A275767E01
2.094,3.351 2.253,3.510 0.160,0.160 10 *a 2.452,3.532 2.611,3.691 0.160,0.160 10 *c 2.094,3.738 2.253,3.897 0.160,0.160 10 *b

Using an E7 "TORX" socket wrench, install the stud bolt.

Text in Illustration
*a 18.0 mm (0.709 in.)
*b 13.0 mm (0.512 in.)
*c 33.0 mm (1.30 in.)

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


Hide 4.INSTALL WIRE HARNESS CLAMP BRACKET (for LHD)

a.

Install the wire harness clamp bracket with the bolt.

Torque:
8.4 N*m (85 kgf*cm, 74 in.*lbf)


Hide 16268 5.INSTALL NO. 1 WATER BY-PASS PIPE

a.

Install the No. 1 water by-pass pipe with the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the water hose.


Hide 16281 6.INSTALL NO. 4 WATER BY-PASS HOSE

a.

Install the No. 4 water by-pass hose with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 4 water by-pass hose.


Hide 17167 9.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

Hide 25680 12.INSTALL EGR VALVE WITH COOLER ASSEMBLY