Home › Engine / Hybrid System › STOP AND START › STOP AND START SYSTEM(for 2WW) › from 2015.10
RM3090E _51 Engine / Hybrid System _009049 STOP AND START _0208733 STOP AND START SYSTEM(for 2WW) C

STOP AND START  STOP AND START SYSTEM(for 2WW)  P1545  Starter Maintenance  


DESCRIPTION

When the number of starter operations reaches the maximum number, the engine stop and start ECU stores DTC P1545 and blinks the stop and start cancel indicator light. When the STA signal detected by the ECM and by the engine stop and start ECU do not match, the engine stop and start ECU stores DTC P1545 and blinks the stop and start cancel indicator light.

DTC No. Detection Item DTC Detection Condition Trouble Area Warning Indicate Memory
P1545 Starter Maintenance Both of the following conditions are met (1 trip detection logic):
·

Ignition switch ON

·

The number of starter operations reaches the specified limit.


Both of the following conditions are met for 2 seconds or more (1 trip detection logic):
·

Normal communication with the ECM.

·

STA signals detected by the ECM and the engine stop and start ECU do not


·

Wire harness or connector

·

ST relay

·

Engine stop and start ECU

·

Starter assembly

·

ECM


Blinks DTC stored

CONFIRMATION DRIVING PATTERN

HINT:

DTCs for the stop and start system are not cleared even if the malfunction has been repaired. After repairing the malfunction, be sure to clear the DTCs.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>DTC CHECK / CLEAR


CONFIRMATION AFTER TROUBLESHOOTING


HINT:
·

If the cable is disconnected from the negative (-) battery terminal, stop and start control is prohibited until refresh charge is completed. In this case, drive the vehicle approximately 5 to 60 minutes until refresh charge is completed and stop and start control operation is permitted.

·

Allow the engine to idle for 3 minutes after it is warmed up and check that the engine idle speed is within 50 rpm of the target idle speed.



a.

Connect the GTS to the DLC3.


b.

Turn the ignition switch to ON and turn the GTS on.


c.

Clear the DTCs.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>DTC CHECK / CLEAR

Powertrain > Stop and Start > Clear DTCs
50002 227

d.

Start the engine and warm it up.


e.

Drive the vehicle at 7 km/h (4.3 mph) or more.

CAUTION:

When performing Confirmation Driving Pattern, obey all speed limits and traffic laws.



f.

Stop the vehicle, move the shift lever to neutral and release the clutch pedal.


g.

Depress the clutch pedal and start the engine.

HINT:

If the engine cranks slowly when the engine is restarted, it can be determined that the battery voltage is low.



h.

Check that no DTCs are output.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>DTC CHECK / CLEAR

Powertrain > Stop and Start > Trouble Codes
50001 227


STOP AND START SYSTEM OPERATION CHECK


HINT:

If the cable is disconnected from the negative (-) battery terminal, stop and start control is prohibited until refresh charge is completed. In this case, drive the vehicle approximately 5 to 60 minutes until refresh charge is completed and stop and start control operation is permitted.


a.

Start the engine and warm it up.


b.

Turn the air conditioning system off.


c.

Drive the vehicle at 7 km/h (4.3 mph) or more.

CAUTION:

When performing Confirmation Driving Pattern, obey all speed limits and traffic laws.



d.

Stop the vehicle, move the shift lever to neutral and release the clutch pedal.


e.

Allow the engine to stop by stop and start control.


f.

Depress the clutch pedal and start the engine.



CAUTION / NOTICE / HINT

NOTICE:
·

Before replacing the engine stop and start ECU, read the number of starter operations and write it into a new engine stop and start ECU.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>REGISTRATION

·

After replacing the starter assembly, perform initialization of the number of starter operations stored in the engine stop and start ECU.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>REGISTRATION

·

When the starter assembly is replaced, "ST relay" must be also replaced.

·

After replacing the engine stop and start ECU or air conditioning amplifier assembly, reset and perform learning of the air conditioning information in the engine stop and start ECU.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>REGISTRATION

·

After replacing the engine stop and start ECU or airbag sensor assembly, clear and calibrate the deceleration sensor zero point in the engine stop and start ECU.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>REGISTRATION

·

When the ECM is replaced on a vehicle with a non-specified battery, it is necessary to perform battery type switching.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>REGISTRATION

·

Inspect the fuses for circuits related to this system before performing the following procedure.



HINT:

Using the GTS, read the freeze frame data before troubleshooting. System condition information is recorded as freeze frame data the moment a DTC is stored. This information can be useful when troubleshooting.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>FREEZE FRAME DATA


PROCEDURE

1.READ VALUE USING GTS (STARTER OPERATION #)
a.

Connect the GTS to the DLC3.


b.

Turn the ignition switch to ON.


c.

Turn the GTS on.


d.

Enter the following menus: Powertrain / Stop and Start / Data List / Starter Operation #.


e.

According to the display on the GTS, read the Data List.

Powertrain > Stop and Start > Data List
Tester Display
Starter Operation #
50003 227 56
Result:
Result Proceed to
254000 or more
(Displays 1000000 or more)*
A
Below 254000 B


HINT:

*: If "Starter Operation #" displays 1000000 or more, it is necessary to replace the engine stop and start ECU as there is an internal malfunction in the ECU.




A

2.REPLACE STARTER ASSEMBLY

B

3.READ VALUE USING GTS (ENGINE STARTER SIGNAL)
2.REPLACE STARTER ASSEMBLY
a.

Replace the starter assembly

Click hereEngine / Hybrid System>2WW STARTING>STARTER>REMOVAL

HINT:
·

When the starter assembly is replaced, "ST relay" must be also replaced.

·

If "Starter Operation #" displays 1000000 or more, the engine stop and start ECU must also be replaced.

Click hereEngine / Hybrid System>STOP AND START>ENGINE STOP AND START ECU>REMOVAL

·

Clear the number of starter operations by performing "Starter Exchange" using the GTS.

Click hereEngine / Hybrid System>STOP AND START>STOP AND START SYSTEM(for 2WW)>REGISTRATION




Result:
Proceed to
NEXT



NEXT

END

3.READ VALUE USING GTS (ENGINE STARTER SIGNAL)
a.

Enter the following menus: Powertrain / Stop and Start / Data List / Engine Starter Signal.


b.

Read the values displayed on the GTS when the ignition switch is ON and the engine starts.

Powertrain > Stop and Start > Data List
Tester Display
Engine Starter Signal
50003 227 244
OK:
Tester Display Condition Normal Condition
Engine Starter Signal Ignition switch ON OFF
Engine start ON



Result:
Proceed to
OK
NG



OK

4.READ VALUE USING GTS (STARTER SIGNAL)

NG

6.CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - ECM - ST RELAY)
4.READ VALUE USING GTS (STARTER SIGNAL)
a.

Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.


b.

Read the values displayed on the GTS when the ignition switch is ON and the engine starts.

Powertrain > Engine and ECT > Data List
Tester Display
Starter Signal
50003 371 149
OK:
Tester Display Condition Normal Condition
Starter Signal Ignition switch ON OFF
Engine start ON



Result:
Proceed to
OK
NG



OK

NG

5.CHECK HARNESS AND CONNECTOR (ECM - ST RELAY)
5.CHECK HARNESS AND CONNECTOR (ECM - ST RELAY)
a.

Disconnect the A66 engine stop and start ECU connector.


b.

Disconnect the A62 ECM connector.


c.

Remove the ST relay from the No. 2 engine room relay block and junction block assembly.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
A62-29 (STA) - ST relay terminal 2 Always Below 1 Ω
A62-29 (STA) - Body ground Always 10 kΩ or higher
ST relay terminal 2 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

6.CHECK HARNESS AND CONNECTOR (ENGINE STOP AND START ECU - ECM - ST RELAY)
a.

Disconnect the A66 engine stop and start ECU connector.


b.

Disconnect the A62 ECM connector.


c.

Remove the ST relay from the No. 2 engine room relay block and junction block assembly.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
A66-21 (STA) - ST relay terminal 2 Always Below 1 Ω
A62-29 (STA) - ST relay terminal 2 Always Below 1 Ω
A66-21 (STA) - A62-29 (STA) Always Below 1 Ω
A66-21 (STA) - Body ground Always 10 kΩ or higher
A62-29 (STA) - Body ground Always 10 kΩ or higher
ST relay terminal 2 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

7.INSPECT RELAY (ST RELAY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

7.INSPECT RELAY (ST RELAY)

Result:
Proceed to
OK
NG



OK

8.CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)

NG

REPLACE RELAY (ST RELAY)

8.CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)
a.

Remove the ST relay from the No. 2 engine room relay block and junction block assembly.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
ST relay terminal 1 - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR