Home › Engine / Hybrid System › A25A-FKS (ENGINE MECHANICAL) › ENGINE UNIT › 2018.10–2020.05
RM3620E _51 Engine / Hybrid System _076317 A25A-FKS ENGINE MECHANICAL _0371513 ENGINE UNIT A

A25A-FKS ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


CAUTION / NOTICE / HINT

NOTICE:

This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION


PROCEDURE

Hide 25861A 1.INSTALL NO. 2 VACUUM SWITCHING VALVE BRACKET

a.

Using an 8 mm socket wrench, install the No. 2 vacuum switching valve bracket to the cylinder head sub-assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 17169A 3.INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR

a.

Install the No. 3 exhaust manifold heat insulator to the cylinder block sub-assembly with the 2 bolts.

Torque:
16 N*m (163 kgf*cm, 12 ft.*lbf)


Hide 11452 4.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

a.

Apply a light coat of engine oil to a new O-ring.


b.

Install the O-ring to the engine oil level dipstick guide.


c.

Using an 8 mm socket wrench, install the engine oil level dipstick guide to the cylinder head sub-assembly with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


d.

Install the engine oil level dipstick.


Hide 23250E 7.INSTALL DIRECT FUEL INJECTOR ASSEMBLY

Hide 23291 11.INSTALL INJECTOR VIBRATION INSULATOR

Hide 23807 13.INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Hide 14.INSTALL WIRE HARNESS CLAMP BRACKET

a.

Using an 8 mm socket wrench, install the wire harness clamp bracket to the No. 1 ventilation case with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 82126A 15.INSTALL NO. 6 ENGINE WIRE

a.

Install the No. 6 engine wire to the wire harness clamp bracket with the 2 nuts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Attach the 2 clamps.


c.

Connect the 4 connectors.


Hide 82219A 16.INSTALL SENSOR WIRE

a.

Using an 8 mm socket wrench, install the sensor wire to the water inlet with thermostat sub-assembly with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Attach the 3 clamps.


c.

Connect the 4 connectors.


Hide 16295 17.INSTALL NO. 7 WATER BY-PASS HOSE

a.

Install the No. 7 water by-pass hose and slide the 2 clips to secure it.


Hide 23100X 18.TEMPORARILY INSTALL FUEL PUMP ASSEMBLY (for High Pressure)

Hide 23801P 19.TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY

Hide 23100X 20.INSTALL FUEL PUMP ASSEMBLY (for High Pressure)

Hide 23801P 21.INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY

a.
A407527C01
2.76,2.719 2.76,2.354 2.76,2.354 2.906,2.354 false 2.948,2.26 3.26,2.458 0.313,0.198 10 false *a 1.677,2.344 1.99,2.542 0.313,0.198 10 false *b
*a 17 mm Union Nut Wrench
*b Torque Wrench Fulcrum Length


Using a 17 mm union nut wrench, tighten the union nut on the fuel delivery pipe side of the No. 1 fuel pipe sub-assembly.

Torque:
Specified tightening torque : 35 N*m (357 kgf*cm, 26 ft.*lbf)

NOTICE:

Do not adjust the torque in the loosening direction.


HINT:
·

Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION

·

When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)




b.

Using a 17 mm union nut wrench, tighten the union nut on the fuel pump assembly side of the No. 1 fuel pipe sub-assembly.

Torque:
Specified tightening torque : 35 N*m (357 kgf*cm, 26 ft.*lbf)

NOTICE:

Do not adjust the torque in the loosening direction.


HINT:
·

Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION

·

When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)




Hide 17177 23.INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET

Hide 16278 25.INSTALL NO. 2 WATER BY-PASS PIPE

a.
A402710N01
0.313,1.083 0.677,1.281 0.365,0.198 10 true 2 (B) 0.854,1.958 1.177,2.156 0.323,0.198 10 true 1 (B) 2.073,1.917 2.292,2.135 0.219,0.219 10 true A

Install the bolt (A).

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

Using an 8 mm socket wrench, install the No. 2 water by-pass pipe with the 2 bolts (B) in the order shown in the illustration.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 16279 26.INSTALL NO. 3 WATER BY-PASS PIPE

a.

Connect the No. 3 water by-pass pipe to the water outlet and slide the clip to secure it.


b.

Using an 8 mm socket wrench, install the No. 3 water by-pass pipe to the intake manifold with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 25620 27.INSTALL EGR VALVE ASSEMBLY

a.

Using an 8 mm socket wrench, install the EGR valve bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.
A407182C01
2.313,0.802 2.552,0.448 2.552,0.448 2.677,0.448 true 2.333,0.938 2.552,0.938 true 2.604,0.844 2.917,1.042 0.313,0.198 10 true *a 2.74,0.313 3.052,0.51 0.313,0.198 10 true *b
*a Pin
*b Hole


Align and fit the hole of the EGR valve bracket to the pin of the camshaft housing sub-assembly.


c.

Using an 8 mm socket wrench, install the EGR valve assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


d.

Connect the No. 8 water by-pass hose to the EGR valve assembly and slide the clip to secure it.


e.

Connect the clamp.


Hide 28.INSTALL NO. 4 WATER BY-PASS HOSE

a.

Connect the No. 4 water by-pass hose to the EGR valve assembly and slide the clip to secure it.


Hide 25601 29.INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY

a.

Using an 8 mm socket wrench, install the No. 1 EGR pipe sub-assembly, a new EGR inlet gasket and a new EGR valve adapter gasket with the 4 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 25687 30.INSTALL NO. 1 EGR COOLER BRACKET

a.

Install the No. 1 EGR cooler bracket to the EGR valve bracket and water outlet with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 25680 31.INSTALL EGR COOLER ASSEMBLY

a.

Install the EGR cooler assembly, a new EGR cooler gasket and a new EGR valve gasket with the 5 bolts.

Torque:
24 N*m (245 kgf*cm, 18 ft.*lbf)


b.

Connect the No. 3 water by-pass hose to the EGR cooler assembly and slide the clip to secure it.


c.

Connect the water hose to the EGR cooler assembly and slide the clip to secure it.


Hide 22030 32.INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

Hide 17167 35.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

a.

Install the No. 1 exhaust manifold heat insulator to the exhaust manifold with the 5 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 16260 36.INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)

a.
A434875C01
1.719,2.406 2.031,2.563 0.313,0.156 10 false *a 3.01,2.969 3.229,3.177 0.219,0.208 10 false *b 2.771,3.375 3.083,3.531 0.313,0.156 10 false *d 2.167,2.823 2.438,3.01 0.271,0.188 10 false *c 0.969,2.604 1.24,2.792 0.271,0.188 10 false *e 1.958,1.229 2.104,1.417 0.146,0.188 10 true A
*a View A
*b 90°
*c Upper Side
*d RH Side
*e 2 to 7 mm (0.0787 to 0.276 in.)


Connect the flow shutting valve (water by-pass hose assembly) to the water by-pass outlet sub-assembly and slide the clip to secure it.

NOTICE:
·

Make sure to slide the flow shutting valve (water by-pass hose assembly) until it contacts the hose stopper of the water by-pass outlet sub-assembly.

·

Make sure that the claws of the clip are within the location shown in the illustration.




b.

Install the water hose clamp bracket with the 2 bolts.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


c.

Connect the flow shutting valve (water by-pass hose assembly) with the bolt.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


Hide 16207 37.INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Connect the No. 2 water by-pass pipe sub-assembly with the bolt.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


b.

Connect the No. 2 water by-pass pipe sub-assembly to the outlet water by-pass sub-assembly and slide the clip to secure it.


Hide 11323C 38.INSTALL NO. 3 TIMING CHAIN COVER

a.

Using an 8 mm socket wrench, install the No. 3 timing chain cover and plate washer to the No. 2 timing chain cover assembly with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 11336A 39.INSTALL TIMING GEAR COVER INSULATOR

a.

Using an 8 mm socket wrench, install the timing gear cover insulator and plate washer to the No. 2 timing chain cover assembly with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 11336A 40.INSTALL NO. 2 TIMING CHAIN COVER INSULATOR

a.

Install the No. 2 timing chain cover insulator to the V-ribbed belt tensioner assembly.


Hide 16620D 41.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

NOTICE:
A409240

·

Do not apply or add any oil or grease to the belt tensioner to prevent abnormal noises from the belt tensioner pulley, belt squealing, etc.

·

Do not allow oil or grease to adhere to the moving parts of the belt tensioner, as this may cause malfunctions.



a.

Install the V-ribbed belt tensioner assembly to the No. 2 timing chain cover assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 12602C 42.INSTALL NO. 2 ENGINE COVER

a.

Install the No. 2 engine cover to the No. 2 timing chain cover assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 88310 43.INSTALL COMPRESSOR ASSEMBLY WITH PULLEY

a.

for Type A:

i.

Using an E8 "TORX" socket wrench, temporarily install the compressor assembly with pulley with the 2 stud bolts.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


ii.
E365913C02
1,0.167 1.167,0.333 0.167,0.167 10 true 1 1.917,1.917 2.083,2.083 0.167,0.167 10 true 2 0.885,1.781 1.052,1.948 0.167,0.167 10 true 3 2.083,0.167 2.25,0.333 0.167,0.167 10 true 4
V100135

Bolt
V100136

Nut


Install the compressor assembly with pulley with the 2 bolts and 2 nuts.

Torque:
24.5 N*m (250 kgf*cm, 18 ft.*lbf)

HINT:

Tighten the bolts and nuts in the order shown in the illustration.




b.

for Type B:

i.
E371401N01
0.885,0.052 1.042,0.25 0.156,0.198 10 true 1 1.219,1.917 1.375,2.115 0.156,0.198 10 true 2 0.635,1.76 0.792,1.958 0.156,0.198 10 true 3 1.635,0.115 1.792,0.313 0.156,0.198 10 true 4

Install the compressor assembly with pulley with the 4 bolts.

Torque:
24.5 N*m (250 kgf*cm, 18 ft.*lbf)

HINT:

Tighten the bolts in the order shown in the illustration.




Hide 16361A 45.INSTALL V-RIBBED BELT

Hide 43457 46.INSTALL DRIVE SHAFT BEARING BRACKET

a.

Install the drive shaft bearing bracket with the 3 bolts.

Torque:
63.7 N*m (650 kgf*cm, 47 ft.*lbf)