Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
82285B
1.INSTALL ILLUMINATION WIRE
Connect the connector and install the illumination wire.
81080J
2.INSTALL NO. 1 INTERIOR ILLUMINATION LIGHT ASSEMBLY
Attach the claw to install the No. 1 interior illumination light assembly.
Attach the clamp.
3.INSTALL INSTRUMENT PANEL SAFETY PAD ASSEMBLY
4.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
for A25A-FKS:
for M20A-FKS:
for A25A-FXS:
Click hereGeneral>MAINTENANCE>A25A-FXS AUXILIARY BATTERY>INSTALLATION
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
65351A
5.INSTALL BATTERY HOLE COVER (for HV Model)
58416K
6.INSTALL REAR NO. 2 FLOOR BOARD (for HV Model)
58410B
7.INSTALL DECK BOARD ASSEMBLY (for HV Model)
8. PERFORM DIAGNOSTIC SYSTEM CHECK
w/o Occupant Classification System:
for Gasoline Model with Occupant Classification System:
for HV Model with Occupant Classification System:
9.CHECK SRS WARNING LIGHT
w/o Occupant Classification System:
for Gasoline Model with Occupant Classification System:
for HV Model with Occupant Classification System:
10.PERFORM SYSTEM INITIALIZATION AND CALIBRATION