OIL PUMP > INSTALLATION |
| 1. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL |
![]() |
Place the timing chain cover on wooden blocks.
Using SST, tap in a new oil seal until its surface is flush with the timing gear case edge.
| 2. INSTALL THERMOSTAT |
![]() |
Install a new gasket onto the thermostat.
Install the thermostat with the jiggle valve upward.
| 3. INSTALL WATER INLET |
![]() |
Install a new gasket and the water inlet with the bolt and 2 nuts.
| 4. INSTALL OIL PUMP |
![]() |
Apply adhesive to the head straight screw plug.
Using a 10 mm socket hexagon wrench, install the head straight screw plug.
![]() |
Install 4 new O-rings onto the oil pump as shown in the illustration.
Apply continuous beads of seal packing to the places shown in the illustration.
| Position | Specified Condition |
| A - A' | 2.5 to 3.0 mm (0.098 to 0.118 in.) |
| B - B', C - C' | 4.0 to 4.5 mm (0.157 to 0.177 in.) |
| D - D' | 2.5 to 3.0 mm (0.098 to 0.118 in.) |
| E | 2.5 to 3.5 mm (0.098 to 0.138 in.) |

![]() |
Align the oil pump's drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover onto the crankshaft.
Loosely install the oil pump with the 19 bolts and 2 nuts, but do not tighten the bolts and nuts yet.
![]() |
Provisionally install the oil pump with the 19 bolts and 2 nuts.
Fully tighten the bolts and nuts, except bolts A, in the following order: Area 1, Area 3 and then Area 2.
Fully tighten the bolts A in the following order: Area 2 and then Area 3.
Fully tighten the bolts E in Area 4.

![]() |
Install a new gasket, then install the water by-pass pipe No. 1 with the 2 nuts.
| 5. INSTALL OIL PAN SUB-ASSEMBLY |
![]() |
Apply adhesive to the head straight screw plug.
Using a 10 mm socket hexagon wrench, install the head straight screw plug.
![]() |
Install 4 new O-rings onto the oil pump as shown in the illustration.
Apply continuous beads of seal packing to the places shown in the illustration.
| Position | Specified Condition |
| A - A' | 2.5 to 3.0 mm (0.098 to 0.118 in.) |
| B - B', C - C' | 4.0 to 4.5 mm (0.157 to 0.177 in.) |
| D - D' | 2.5 to 3.0 mm (0.098 to 0.118 in.) |
| E | 2.5 to 3.5 mm (0.098 to 0.138 in.) |

![]() |
Align the oil pump's drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover onto the crankshaft.
Loosely install the oil pump with the 19 bolts and 2 nuts, but do not tighten the bolts and nuts yet.
![]() |
Provisionally install the oil pump with the 19 bolts and 2 nuts.
Fully tighten the bolts and nuts, except bolts A, in the following order: Area 1, Area 3 and then Area 2.
Fully tighten the bolts A in the following order: Area 2 and then Area 3.
Fully tighten the bolts E in Area 4.

![]() |
Install a new gasket, then install the water by-pass pipe No. 1 with the 2 nuts.
| 6. INSTALL OIL STRAINER SUB-ASSEMBLY |
![]() |
Install a new gasket and the oil strainer with the 2 bolts and 2 nuts.
| 7. INSTALL OIL PAN SUB-ASSEMBLY NO.2 |
![]() |
Apply continuous beads of seal packing to the places shown in the illustration.
![]() |
Provisionally install the oil pan with the 18 bolts and 2 nuts.
Uniformly tighten the 18 bolts and 2 nuts in the sequence shown in the illustration.
Install a new gasket and the drain plug.
| 8. INSTALL OIL LEVEL GAGE SUB-ASSEMBLY |
| 9. INSTALL CRANKSHAFT PULLEY |
![]() |
Align the set key of the crankshaft with the key groove of the pulley, and slide on the pulley.
Provisionally install a new crankshaft pulley bolt onto the crankshaft.
Using SST, hold the crankshaft pulley and tighten the crankshaft pulley bolt.
![]() |
Install the bracket with the bolt. (w/ AIR CONDITIONING)
| 10. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
![]() |
Apply seal packing to the 2 locations shown in the illustration.
![]() |
Provisionally install the cylinder head cover with the 19 bolts and 2 nuts.
Tighten bolts A shown in the illustration.
Tighten bolts B and nuts shown in the illustration.
Tighten bolts A again.
![]() |
Connect the ventilation hose.
![]() |
Install the ignition coils with the bolts.
![]() |
Install the engine wire harness clamps.
Connect the camshaft position sensor connector.
Connect the VSV connector.
Connect the throttle with motor body connector.
Connect the ignition coil connectors.
| 11. INSTALL INTAKE MANIFOLD TO HEAD GASKET NO. 1 |
![]() |
Install a new gasket onto the intake manifold.
Install the intake manifold with the 5 bolts and 2 nuts.
![]() |
Connect the engine wire harness to the relay block.
Install the nut shown in the illustration.
Connect the 3 connectors.
![]() |
Install the harness clamp bracket with the bolt.
Engage the wire harness clamp.
Connect the compressor magnetic clutch connector. (w/ AIR CONDITIONING)
Engage the engine wire harness clamp.
Connect the VSV connector.
![]() |
Connect the ventilation hose No. 3.
![]() |
Connect the water by-pass hose No. 2.
![]() |
Install the clamp bracket with the bolt.
![]() |
Connect the vacuum hose.
![]() |
Connect the fuel vapor feed hose to the VSV.
| 12. INSTALL CAMSHAFT POSITION SENSOR |
![]() |
Apply a light coat of engine oil to the O-ring of the camshaft position sensor.
![]() |
Install the camshaft position sensor with the bolt.
Connect the camshaft position sensor connector.
| 13. INSTALL CRANKSHAFT POSITION SENSOR |
![]() |
Apply a light coat of engine oil to the O-ring of the crankshaft position sensor.
![]() |
Install the camshaft position sensor with the bolt.
![]() |
Connect the crankshaft position sensor connector and the 2 wire harness clamps.
| 14. INSTALL IDLE PULLEY ASSEMBLY W/BRACKET (w/ Air Conditioning System) |
![]() |
Using several steps, uniformly install and tighten the 5 bolts in the sequence shown in the illustration.
| 15. INSTALL IDLER PULLEY SUB-ASSEMBLY NO.1 |
![]() |
Install the No. 1 idler pulley sub-assembly with the bolt.
| 16. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Provisionally install the V-ribbed belt tensioner with bolts A and B.
Tighten bolt B.
Tighten bolt A.
Check that the bolt holes of the V-ribbed belt tensioner and timing chain cover are aligned, and install bolt C.
![]() |
Tighten bolt C.
| 17. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator with the 2 bolts.
![]() |
Connect the generator connector.
Install the generator wire with the nut.
Install the terminal cap.
| 18. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY |
![]() |
Install a new gasket onto the intake manifold.
![]() |
Install the throttle with motor body with the 2 bolts and 2 nuts.
![]() |
Connect the water by-pass hose.
Connect the water by-pass hose No. 2.
Connect the throttle motor connector.
| 19. INSTALL INTAKE AIR CONNECTOR |
![]() |
Install the intake air connector with the 3 bolts.
Tighten the 2 hose clamp bolts.
![]() |
Connect the vacuum hose.
![]() |
Connect the ventilation hose No. 2.
![]() |
Connect the vacuum hose.
Engage the wire harness clamp.
Connect the pressure sensor connector.
| 20. INSTALL REAR END PLATE |
Install the rear end plate with the 2 bolts.
| 21. INSTALL DRIVE PLATE & RING GEAR SUB-ASSEMBLY (for Automatic Transmission) |
![]() |
Clean the 10 bolts and 10 bolt holes.
Apply adhesive to 2 or 3 threads of the 10 bolts.
Provisionally install the drive plate spacer front, drive plate and ring gear and drive plate rear with the 10 bolts.
Using SST, hold the crankshaft.
![]() |
Using several steps, uniformly install and tighten the 10 bolts in the sequence shown in the illustration.
| 22. INSTALL FLYWHEEL SUB-ASSEMBLY (for Manual Transmission) |
![]() |
Clean the 10 bolts and 10 bolt holes.
Apply adhesive to 2 or 3 threads of the 10 bolts.
Using SST, hold the crankshaft.
![]() |
Using several steps, uniformly install and tighten the 10 bolts in the sequence shown in the illustration.
![]() |
Mark the bolts with paint as shown in the illustration.
Retighten the bolts by 90° in the same sequence as in step (d).
Check that the paint mark of each bolt is at a 90° from the original position.
| 23. INSTALL CLUTCH DISC ASSEMBLY (for Manual Transmission) |
| Transmission | See page |
| R155 |
Click here
|
| R155F |
Click here
|
| 24. INSTALL CLUTCH COVER ASSEMBLY (for Manual Transmission) |
| Transmission | See page |
| R155 |
Click here
|
| R155F |
Click here
|
| 25. INSTALL ENGINE ASSEMBLY |
![]() |
Attach the engine sling device and chain block to the engine hangers.
Keep the engine level, and align the engine mounting bracket front No. 1 RH w/ engine mounting insulator front and LH with the body mountings.
Attach the engine mounting bracket front No. 1 RH w/ engine mounting insulator front and LH, and install the 4 bolts and nuts.
Remove the bolts, then remove the engine hangers.
| 26. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY (for Automatic Transmission) |
| Transmission | See page |
| A340E |
Click here
|
| A340F |
Click here
|
| 27. INSTALL MANUAL TRANSMISSION UNIT ASSEMBLY (for Manual Transmission) |
| Transmission | See page |
| R155 |
Click here
|
| R155F |
Click here
|
| 28. INSTALL EXHAUST PIPE ASSEMBLY FRONT |
![]() |
Check the free length.
Using vernier calipers, measure the free length of the compression spring.
![]() |
Using a wooden block and plastic-faced hammer, tap in a new gasket until it is flush with the exhaust manifold.
Install the exhaust pipe front into the exhaust pipe support.
Tighten the 2 bolts and 2 compression springs.
| 29. INSTALL EXHAUST PIPE ASSEMBLY TAIL |
Install a new gasket onto the exhaust pipe front.
Install the exhaust pipe tail onto the 4 exhaust pipe supports.
Tighten the 2 bolts and 2 nuts.
| 30. CONNECT ENGINE WIRE |
| 31. CONNECT AIR INJECTION SYSTEM NO.1 HOSE |
![]() |
Connect the fuel vapor feed hose.
| 32. CONNECT FUEL VAPOR FEED HOSE ASSEMBLY |
![]() |
Connect the fuel feed hose.
| 33. CONNECT FUEL HOSE NO.2 |
![]() |
Align the fuel hose connector with the pipe stem, and insert the fuel hose until the retainer makes a "click" sound.
Push down the checker of the fuel hose.
Push the fuel hose down until the checker of the fuel hose makes a "click" sound.
| 34. CONNECT FUEL HOSE |
![]() |
Align the fuel hose connector with the pipe stem, and insert the fuel hose until the retainer makes a "click" sound.
Push down the checker of the fuel hose.
Push the fuel hose down until the checker of the fuel hose makes a "click" sound.
| 35. INSTALL WATER HOSE SUB-ASSEMBLY |
![]() |
Install the water hose.
| 36. INSTALL RADIATOR HOSE INLET |
| 37. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) |
![]() |
Install the compressor and magnetic clutch with the 4 bolts.
Connect the compressor and magnetic clutch connector.
![]() |
Install the bolt shown in the illustration.
| 38. INSTALL RADIATOR HOSE NO.2 |
| 39. INSTALL VANE PUMP ASSEMBLY |
![]() |
Install the vane pump with the 2 bolts.
Connect the vane pump connector.
| 40. INSTALL AIR CLEANER CASE |
Install the air cleaner case with the 3 bolts.
| 41. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY |
| 42. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
![]() |
Install the air cleaner cap together with the air cleaner hose No. 1.
Connect the 2 air cleaner clamps.
Tighten the hose clamp bolt, then connect the air cleaner hose No. 1.
Connect the wire harness clamp.
Connect the mass air flow meter connector.
| 43. INSTALL FAN SHROUD |
![]() |
Install the fan pulley.
![]() |
Install the fan shroud and fan with fluid coupling together.
Provisionally install the fan with fluid coupling with the 4 nuts.
![]() |
Install the 2 bolts shown in the illustration.
![]() |
Connect the oil cooler inlet and outlet hoses to the fan shroud. (for Automatic Transmission)
![]() |
Connect the radiator reserve tank hose to the radiator.
Install the fan generator V belt.
![]() |
Tighten the 4 nuts shown in the illustration.
| 44. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH |
![]() |
Install the radiator support frame seal LH with the 9 clips.
| 45. INSTALL BATTERY TRAY |
| 46. INSTALL BATTERY |
| 47. ADD ENGINE OIL |
Fill with fresh engine oil.
| Oil grade | Oil viscosity (SAE) |
| ILSAC multigrade engine oil | 0W-20 |
| Item | Specified Condition |
| Drain and refill with oil filter change | 5.8 liters (6.1 US qts, 5.1 Imp. qts) |
| Drain and refill without oil filter change | 5.1 liters (5.4 US qts, 4.5 Imp. qts) |
| Dry fill | 6.1 liters (6.4 US qts, 5.4 Imp. qts) |
| 48. ADD ENGINE COOLANT |
Tighten the engine drain plug.
Tighten the radiator drain plug.
Disconnect the 2 vinyl hoses.
Slowly fill the system with engine coolant.
Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.
Install the radiator cap securely.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Warm up the engine until the cooling fan operates.
| Item | Condition |
| Fan speed | Any setting except OFF |
| Temperature | Toward warm |
| Air condition switch | OFF |
Squeeze the inlet and outlet radiator hoses several times by hand while warning up the engine.
Stop the engine and wait until the coolant cools down.
Remove the radiator cap and check the coolant level inside the radiator.
If the coolant level is below the full level, perform the steps from (d) through (k) and repeat the operation until the coolant level remains at the full level.
Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.
Install the engine under cover No. 1 with the 4 bolts. (PRE RUNNER AND 4WD TYPE)
| 49. CHECK ENGINE OIL LEVEL |
| 50. CHECK FUEL LEAK |
| 51. CHECK ENGINE COOLANT LEAKAGE |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Pump it up to 118 kPa (1.2 kgf/cm2, 17.1 psi) and check that the pressure does not drop.
| 52. CHECK OIL LEAKAGE |
| 53. CHECK EXHAUST GAS LEAKAGE |
| 54. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.1 (for Pre Runner and 4WD Type) |
Install the engine under cover No. 1 with the 4 bolts.
| 55. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.2 (for Pre Runner and 4WD Type, Regular Cab) |
Install the engine under cover No. 2 with the 4 bolts.
| 56. INSTALL HOOD SUB-ASSEMBLY |