Home › Engine / Hybrid System › 3UR-FE CHARGING › GENERATOR
RM27M0U _51 Engine / Hybrid System _049147 3UR-FE CHARGING _0234378 GENERATOR A

3UR-FE CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.
A156406

Install the generator with the 3 bolts and nut.

Torque:
43 N*m (439 kgf*cm, 32 ft.*lbf)


b.
A156405

Connect the generator connector.


c.

Connect the generator wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Install the terminal cap.


e.

Install the harness bracket to the generator with the bolt.

Torque:
31 N*m (316 kgf*cm, 23 ft.*lbf)


Hide 53736 3.INSTALL FRONT FENDER APRON SEAL RH

a.

Install the apron seal with the 5 clips.


Hide 51441 5.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

Hide 28800 9.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL