16322
1.INSTALL WATER INLET PIPE
Apply soapy water to 2 new O-rings and install them to the water inlet pipe.
Install the water inlet pipe to the No. 1 heat exchanger cover.
11302
2.INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
Apply a light coat of engine oil to a new oil pump gasket.
Install the oil pump gasket to the cylinder block.
Apply a light coat of engine oil to a new O-ring.
Install the O-ring to the oil pan sub-assembly.
Apply seal packing in a continuous line to the timing chain cover sub-assembly as shown in the following illustration.
| *a | Continuous Line Area | *b | Dashed Line Area |
| *c | Diagonal Line Area | - | - |
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
| Area | Seal Packing Diameter | Application Position from Inside Edge of Cover |
|---|---|---|
| Continuous Line Area | 3.0 to 4.0 mm (0.118 to 0.157 in.) | 2.5 mm (0.0984 in.) |
| Dashed Line Area | 6.4 mm (0.252 in.) or more, or within OK area shown in illustration | 7.0 mm (0.276 in.) |
| Diagonal Line Area | 3.0 to 4.0 mm (0.118 to 0.157 in.) | 5.5 mm (0.217 in.) |
| *a | Seal Packing Thickness |
| *b | Seal Packing Width |
| *c | OK Area |
When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
Install the timing chain cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
Do not start the engine for at least 2 hours after installing.
Align the oil pump drive rotor spline and crankshaft as shown in the illustration. Install the spline and timing chain cover sub-assembly to the crankshaft.
Temporarily install the timing chain cover sub-assembly with the 28 bolts and nut.
| Item | Length | Thread Diameter |
|---|---|---|
| Bolt A | 25 mm (0.984 in.) | 8 mm (0.315 in.) |
| Bolt B | 55 mm (2.17 in.) | 8 mm (0.315 in.) |
| Bolt C | 70 mm (2.76 in.) | 8 mm (0.315 in.) |
| Bolt D | 35 mm (1.38 in.) | 10 mm (0.394 in.) |
| Bolt E | 55 mm (2.17 in.) | 10 mm (0.394 in.) |
| Bolt F | 80 mm (3.15 in.) | 10 mm (0.394 in.) |
| *1 | Nut |
Make sure that there is no oil on the bolt threads.
Tighten the 3 bolts in several steps in the sequence shown in the illustration.
Temporarily install the fan bracket assembly with the 4 bolts.
| Item | Length | Thread Diameter |
|---|---|---|
| Bolt A | 70 mm (2.76 in.) | 8 mm (0.315 in.) |
| Bolt B | 80 mm (3.15 in.) | 10 mm (0.394 in.) |
Temporarily install the V-ribbed belt tensioner assembly with the standard bolt and 6 mm hexagon wrench bolt.
Tighten the 8 bolts labeled 4 to 11 in several steps in the sequence shown in the illustration.
Tighten the 23 bolts and nut labeled 12 to 35 in several steps in the sequence shown in the illustration.
After the installation, if the seal packing has seeped out at the areas labeled A shown in the illustration, wipe it off.
11202
3.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
Install 5 new gaskets to the No. 2 camshaft bearing cap and No. 3 camshaft bearing cap.
Install the gasket to the cylinder head cover sub-assembly LH.
Remove any oil from the contact surface.
Apply seal packing as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
|
Seal Packing |
Remove any oil from the contact surface.
Install the cylinder head cover sub-assembly LH within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
Install the cylinder head cover sub-assembly LH washer with a new seal and the 14 bolts.
Do not start the engine for at least 2 hours after the installation.
11201
4.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH
Install 5 new gaskets to the No. 1 camshaft bearing cap and No. 3 camshaft bearing cap.
Install the gasket to the cylinder head cover sub-assembly RH.
Remove any oil from the contact surface.
Apply seal packing as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
|
Seal Packing |
Remove any oil from the contact surface.
Install the cylinder head cover sub-assembly RH within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
Install the cylinder head cover sub-assembly RH washer with a new seal and the 14 bolts.
Do not start the engine for at least 2 hours after the installation.
19500
5.INSTALL IGNITION COIL ASSEMBLY
Install the 8 ignition coils with the 8 bolts.
13471
6.INSTALL CRANKSHAFT PULLEY
Align the crankshaft pulley set key with the key groove of the crankshaft pulley, and slide on the crankshaft pulley.
| *a | Hold |
| *b | Turn |
| *c | SST |
Using SST, install the crankshaft pulley set bolt.
7.CONNECT WIRE HARNESS CLAMP BRACKET
Connect the wire harness clamp bracket to the timing chain cover sub-assembly with the bolt.
16603
8.INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Install the No. 1 idler pulley sub-assembly with the bolt.
16173
9.INSTALL WATER PUMP PULLEY
Temporarily install the water pump pulley with the 4 bolts.
Using SST, hold the water pump pulley and tighten the 4 bolts.
16323
10.INSTALL WATER INLET HOUSING
Install a new gasket to the timing chain cover sub-assembly.
| *1 | Gasket |
Install the water inlet housing with the 3 bolts.
17303
11.INSTALL AIR TUBE SUB-ASSEMBLY
Connect the 2 hoses.
Install the air tube sub-assembly with the bolt.
12611
12.INSTALL NO. 1 ENGINE COVER
11212
13.INSTALL NO. 2 ENGINE COVER
16355
14.INSTALL FRONT WATER BY-PASS JOINT
Install 2 new gaskets and the front water by-pass joint with the 4 nuts to the cylinder head.
Connect the No. 2 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
16293
15.CONNECT NO. 10 WATER BY-PASS HOSE
Connect the No. 10 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
| *1 | No. 9 Water By-pass Hose |
| *2 | No. 10 Water By-pass Hose |
| *a | Paint Mark (Orange) |
| *b | Paint Mark (Yellow) |
16297
16.CONNECT NO. 9 WATER BY-PASS HOSE
Connect the No. 9 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
16206
17.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Connect the No. 2 water by-pass hose and No. 3 water by-pass hose to the water by-pass pipe sub-assembly, and slide the 2 clamps to secure the hoses.
Install the water by-pass pipe sub-assembly with the 2 bolts.
Connect the air tube sub-assembly with the bolt.
16261G
18.INSTALL NO. 1 WATER BY-PASS HOSE
Connect the No. 1 water by-pass hose to the inlet water housing and front water by-pass joint, and slide the 2 clamps to secure the hoses.
27020
19.INSTALL GENERATOR ASSEMBLY
Install the 2 stud bolts.
Install the generator assembly with the 2 bolts and 2 nuts.
Connect the generator connector.
Connect the generator assembly wire with the nut.
Install the terminal cap.
Connect the wire harness bracket to the generator assembly with the bolt.
44320
20.CONNECT VANE PUMP ASSEMBLY
Before performing the following procedures, move the spacer until the vane pump assembly can be installed.
| *a | Spacer |
Connect the vane pump assembly to the timing chain cover sub-assembly with the 2 bolts.
11452
21.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
22.INSTALL OIL FILTER BRACKET (w/o Oil Cooler)
Apply a light coat of engine oil to 2 new O-rings.
Install the 2 O-rings to the timing chain cover sub-assembly.
Install the oil filter bracket with the 2 bolts and 2 nuts.
15671
23.INSTALL OIL FILTER BRACKET (w/ Oil Cooler)
15781
24.INSTALL NO. 1 OIL COOLER BRACKET (w/ Oil Cooler)
16268A
25.INSTALL NO. 2 WATER BY-PASS PIPE (w/ Oil Cooler)
Connect the 4 hoses to the No. 2 water by-pass pipe, and slide the 4 clamps to secure the hoses.
Install the No. 2 water by-pass pipe with the 3 bolts.
83520
26.INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY
27.INSTALL OIL FILTER ELEMENT
23902
28.CONNECT NO. 2 FUEL TUBE SUB-ASSEMBLY
Connect the No. 2 fuel tube sub-assembly with the 2 bolts.
88320
29.CONNECT COOLER COMPRESSOR ASSEMBLY
Install the cooler compressor assembly with the 2 stud bolts.
Install the 2 bolts and 2 nuts.
Tighten the bolts and nuts in the order shown in the illustration to install the cooler compressor assembly.
30.CONNECT HEATER HOSE AND PIPE
Connect the 3 hoses, and slide the 3 clamps to secure the hoses.
Install the 2 bolts.
31.CONNECT AIR PUMP HOSE AND WIRE HARNESS
Connect the No. 2 air hose and No. 3 air hose to the air tube sub-assembly, and slide the 2 clamps to secure the hoses.
Connect the 2 clamps and air pump wire harness.
17111
32.INSTALL INTAKE MANIFOLD
33.CONNECT ENGINE WIRE
Engine Room RH Side:
Connect the 7 clamps.
Connect the throttle position sensor and throttle control motor connector.
Connect the 2 air pump connectors.
Install the ground wire RH with the 2 bolts.
Connect the 2 VVT sensor connectors.
Connect the injector connector.
Connect the 4 ignition coil connectors.
Connect the 2 camshaft timing oil control valve connectors.
Connect the 2 clamps and power steering oil pressure switch connector.
for 4WD:
Connect the clamp and junction connector.
Engine Room LH Side:
Connect the cooler compressor connector.
Connect the 3 clamps.
Connect the camshaft position sensor connector.
Connect the 2 camshaft timing oil control valve connectors.
Connect the engine coolant temperature sensor connector.
Connect the 5 clamps.
Install the ground wire LH with the 2 bolts.
Connect the 2 VVT sensor connectors.
Connect the 4 ignition coil connectors.
Connect the injector connector.
Connect the 2 wire harness clamps.
Connect the 4 air injection control driver connectors.
Connect the 2 connectors and attach the 2 clamps to the engine room junction block.
Install the engine room relay block cover.
34.INSTALL AIR CLEANER ASSEMBLY
17880
35.INSTALL AIR CLEANER HOSE ASSEMBLY
16400
36.INSTALL RADIATOR ASSEMBLY
37.ADD ENGINE OIL
38.ADD ENGINE COOLANT
39.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
40.INSPECT FOR OIL LEAK
41.INSPECT FOR COOLANT LEAK
42.CHECK ENGINE OIL LEVEL