Home › Engine / Hybrid System › 6AR-FSE (EMISSION CONTROL) › EGR COOLER › 2018.04–2021.02
RM33A0E _51 Engine / Hybrid System _072205 6AR-FSE EMISSION CONTROL _0353747 EGR COOLER A

6AR-FSE EMISSION CONTROL  EGR COOLER  INSTALLATION  


PROCEDURE

Hide 25680 1.INSTALL EGR COOLER ASSEMBLY

HINT:

Perform "Inspection After Repair" after replacing the EGR valve assembly.

Click hereEngine / Hybrid System>6AR-FSE (ENGINE CONTROL)>SFI SYSTEM>INITIALIZATION


a.

Install a new EGR valve gasket to the EGR valve assembly.


b.

Install the EGR cooler assembly to the EGR valve assembly with the 2 nuts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


c.
A338984C01
0.729,1.146 0.854,0.698 0.854,0.698 1.01,0.698 false 0.635,0.344 0.917,0.542 0.281,0.198 10 false *a 1.083,0.583 1.375,0.833 0.292,0.25 10 false *b
*a Up
*b Paint Mark


Connect the No. 1 water by-pass hose to the EGR cooler assembly and slide the clip to secure it.

HINT:

Make sure the direction of the clip is as shown in the illustration.



Hide 2.INSTALL EGR VALVE WITH COOLER ASSEMBLY

Hide 17705 6.INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE

Hide 7.ADD ENGINE COOLANT

Hide 12601B 10.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

Hide 11.PERFORM INITIALIZATION

a.

Perform "Inspection After Repair" after replacing the EGR valve assembly.

Click hereEngine / Hybrid System>6AR-FSE (ENGINE CONTROL)>SFI SYSTEM>INITIALIZATION