16331A
1.INSTALL THERMOSTAT
Apply a continuous bead of seal packing (diameter 1.5 to 2.5 mm (0.06 to 0.10 in.)) as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent.
Remove any oil from the contact surface.
Install the water outlet within 3 minutes of applying the seal packing.
Do not start the engine for at least 2 hours after the installation.
Install a new gasket onto the thermostat.
Align the jiggle valve to the position shown in the illustration and install the thermostat.
| *a | Jiggle Valve |
Install the water outlet with the 3 bolts.
29 N*m (291 kgf*cm, 21 ft.*lbf)
16571
2.CONNECT INLET RADIATOR HOSE
17341K
3.CONNECT NO. 1 INTERCOOLER AIR HOSE
17113
4.INSTALL INTAKE PIPE
5.ADD ENGINE COOLANT
58701A
6.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY
33504F
7.INSTALL SHIFT LEVER SUB-ASSEMBLY
33820B
8.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
33531B
9.INSTALL SHIFT AND SELECT LEVER SHAFT DUST BOOT
58534A
10.INSTALL TRANSMISSION COVER MAT
58420
11.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY (for Automatic Transmission)
58420
12.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY
13.BLEED AIR FROM FUEL SYSTEM
14.REGISTRATION INJECTOR COMPENSATION CODE
Register the injector compensation code.
Click hereEngine / Hybrid System>N04C-UH (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION
15.CHECK FOR INJECTOR COMPENSATION CODE
16.INSPECT FOR FUEL LEAK
17.INSPECT FOR COOLANT LEAK
18.INSPECT FOR OIL LEAK
58521D
19.INSTALL ENGINE SERVICE HOLE COVER MAT
58734B
20.INSTALL ENGINE SERVICE COVER REAR WEATHERSTRIP
58410
21.INSTALL ENGINE SERVICE HOLE COVER