When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.
| Replaced Parts (A) | Pipes Requiring New Replacement |
|---|---|
| Injector assembly (including shuffling the injector assemblies between the cylinders) | ·
No. 1 injection pipe sub-assembly ·
No. 2 injection pipe sub-assembly |
| Supply pump assembly | Fuel inlet pipe sub-assembly |
·
Common rail assembly ·
Cylinder block sub-assembly ·
Cylinder head sub-assembly ·
Timing chain case assembly |
·
No. 1 injection pipe sub-assembly ·
No. 2 injection pipe sub-assembly ·
Fuel inlet pipe sub-assembly |
After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
The injector assembly is a precision instrument. Do not use the injector assembly if it is struck or dropped.
Make sure foreign matter does not enter the fuel path.
23682
1.INSTALL NOZZLE HOLDER GASKET
Install 4 new nozzle holder gaskets to the cylinder head cover sub-assembly.
23670
2.TEMPORARILY INSTALL INJECTOR ASSEMBLY
Before installing the injector assembly, check for carbon, foreign matter, etc. on the seal surfaces of the cylinder head sub-assembly and injector assembly. If there is foreign matter, remove it before installing the injector assembly.
Install 4 new injection nozzle seats to the cylinder head sub-assembly.
Apply a light coat of engine oil to the O-ring on each injector assembly.
| *1 | O-Ring |
Install a new O-ring to each injector assembly.
Install the 4 injector assemblies to the cylinder head sub-assembly.
Fit the injector assembly to the injection nozzle seats.
| *1 | Washer |
Install the nozzle holder clamps and washers as shown in the illustration.
Pay attention to the mounting orientation (beveled edge) of the washer.
Temporarily install the nozzle holder clamp bolts.
When temporarily installing the nozzle holder clamp bolt to the No. 1 nozzle holder clamp, make sure that the bolt and clamp are not at an angle.
3.TEMPORARILY INSTALL NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
Temporarily install the 2 No. 2 injection pipe sub-assemblies with the 4 union nuts.
Temporarily install the 2 No. 1 injection pipe sub-assemblies with the 4 union nuts.
23670
4.TIGHTEN INJECTOR ASSEMBLY
Tighten the 4 nozzle holder clamp bolts.
5.TIGHTEN NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
With Common Rail Side Number Mark (24N):
| *a | Number Mark (24N) |
Make sure that the "24N" mark faces the common rail side of the injection pipe at the position shown in the illustration.
Check for the number mark and tighten the parts to the specified tightening torque.
| *a | Torque Wrench Fulcrum Length |
Using SST, tighten the No. 1 and No. 2 injection pipe sub-assemblies 8 union nuts.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
When using SST (fulcrum length of 50 mm (1.97 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 18.8 N*m (192 kgf*cm, 14 ft.*lbf)
| *a | Torque Wrench Fulcrum Length |
Without Common Rail Side Number Mark (24N):
Using SST, tighten the No. 1 and No. 2 injection pipe sub-assemblies 8 union nuts.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
When using SST (fulcrum length of 50 mm (1.97 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 31 N*m (316 kgf*cm, 23 ft.*lbf)
23760
6.INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY
Temporarily install the nozzle leakage pipe assembly and 4 new gaskets with the 4 union bolts and bolt.
Tighten the 4 union bolts and bolt in the order shown in the illustration.
Connect the No. 5 fuel hose to the nozzle leakage pipe assembly.
7.INSTALL HARNESS BRACKET
Install the harness bracket with the bolt.
8.INSTALL WIRING HARNESS CLAMP BRACKET
Install the wiring harness clamp bracket with bolt to the cylinder head cover sub-assembly.
Connect the pressure discharge valve connector to the common rail assembly.
23811H
9.INSTALL NO. 1 FUEL PIPE (w/ DPF)
25624
10.INSTALL EGR VALVE ADAPTER (w/o EGR Cooler)
25800
11.INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/o EGR Cooler)
25800
12.INSTALL EGR COOLER SUB-ASSEMBLY AND NO. 2 EGR VALVE ASSEMBLY WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR Cooler)
13.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
14. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART
15.PERFORM REGISTRATION
Perform registration of injector compensation codes.
w/ Urea SCR System:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ Urea SCR System)>REGISTRATION
w/ EGR Cooler:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ EGR Cooler)>REGISTRATION
w/o EGR Cooler:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/o EGR Cooler)>REGISTRATION
Perform registration of pilot quantity learning.
w/ Urea SCR System:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ Urea SCR System)>REGISTRATION
w/ EGR Cooler:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ EGR Cooler)>REGISTRATION
w/o EGR Cooler:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/o EGR Cooler)>REGISTRATION
16.BLEED AIR FROM FUEL SYSTEM
17.INSPECT FOR FUEL LEAK