1.INSTALL TRANSFER ASSEMBLY
2.INSTALL WIRING HARNESS CLAMP BRACKET
Install the 4 wiring harness clamp brackets to the manual transmission assembly with the 5 bolts.
33019C
3.INSTALL TRANSMISSION BREATHER SUB-ASSEMBLY
Install the 2 bolts and 2 brackets to the manual transmission assembly.
Install the transmission breather sub-assembly to the control shift lever retainer sub-assembly.
Attach the 4 breather hose clamps.
4.INSTALL MANUAL TRANSMISSION ASSEMBLY
Install the manual transmission assembly with the 5 bolts.
5.CONNECT WIRE HARNESS
Attach the 5 wire harness clamps.
Install the bolt.
Connect the 2 connectors and wire harness.
12371A
6.INSTALL REAR ENGINE MOUNTING INSULATOR
Install the rear engine mounting insulator to the manual transmission assembly with the 4 bolts.
51204
7.INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
Install the No. 3 frame crossmember sub-assembly with the 4 nuts and 4 bolts.
Install the 4 bolts to the No. 3 frame crossmember sub-assembly.
8.CONNECT GROUND CABLE
Connect the ground cable with the bolt.
41110F
9.INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
37100
10.INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
33119
11.INSTALL STIFFENER PLATE LH
Install the stiffener plate LH with the 4 bolts.
33118
12.INSTALL STIFFENER PLATE RH
Install the stiffener plate RH with the 4 bolts.
12584
13.INSTALL NO. 4 CYLINDER BLOCK INSULATOR
Install the No. 4 cylinder block insulator.
28100
14.INSTALL STARTER ASSEMBLY (for 2KD-FTV)
for 2.0 kW Type:
Click hereEngine / Hybrid System>2KD-FTV STARTING>STARTER(for 2.0 kW Type)>INSTALLATION
for 2.2 kW Type:
Click hereEngine / Hybrid System>2KD-FTV STARTING>STARTER(for 2.2 kW Type)>INSTALLATION
28100
15.INSTALL STARTER ASSEMBLY (for 1KD-FTV)
for 2.0 kW Type:
Click hereEngine / Hybrid System>1KD-FTV STARTING>STARTER(for 2.0 kW Type)>INSTALLATION
for 2.2 kW Type:
Click hereEngine / Hybrid System>1KD-FTV STARTING>STARTER(for 2.2 kW Type)>INSTALLATION
28100
16.INSTALL STARTER ASSEMBLY (for 2GD-FTV)
for 2.0 kW Type:
Click hereEngine / Hybrid System>2GD-FTV STARTING>STARTER(for 2.0 kW Type)>INSTALLATION
for 2.2 kW Type:
Click hereEngine / Hybrid System>2GD-FTV STARTING>STARTER(for 2.2 kW Type)>INSTALLATION
28100
17.INSTALL STARTER ASSEMBLY (for 1GD-FTV)
for 2.0 kW Type:
Click hereEngine / Hybrid System>1GD-FTV STARTING>STARTER(for 2.0 kW Type)>INSTALLATION
for 2.2 kW Type:
Click hereEngine / Hybrid System>1GD-FTV STARTING>STARTER(for 2.2 kW Type)>INSTALLATION
17410
18.INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2KD-FTV)
17410
19.INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 1KD-FTV)
17410
20.INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2GD-FTV)
17410
21.INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 1GD-FTV)
51561D
22.INSTALL PROPELLER SHAFT GUARD
Install the front propeller shaft guard with the 2 bolts.
23.ADD MANUAL TRANSMISSION OIL
51442
24.INSTALL NO. 2 ENGINE UNDER COVER
51410
25.INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
33548F
26.INSTALL NO. 1 FLOOR SHIFT BUSH
Install the No. 1 floor shift bush to the floor shift shift lever assembly.
33530F
27.INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY
|
MP grease |
Apply MP grease to the tip of the floor shift shift lever assembly.
| *1 | Shift Lever Cap |
| *a | Press Down |
| *b | Clockwise |
| *c | Lock |
Cover the shift lever cap with a cloth.
While pressing down on the shift lever cap, turn it clockwise to install the shift lever assembly.
58280A
28.INSTALL SHIFT LEVER BOOT ASSEMBLY
Install the shift lever boot assembly with the 6 screws and 4 clips.
58810J
29.INSTALL CONSOLE BOX ASSEMBLY (w/ Console Box Lid)
58811A
30.INSTALL FRONT CONSOLE BOX (w/o Console Box Lid)
33504F
31.INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
Install the shift lever knob sub-assembly to the shift lever.
28800
32.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION