15710
1.INSTALL OIL COOLER ASSEMBLY
Install 2 new gaskets to the oil cooler.
Install the oil cooler to the oil cooler cover with the 4 nuts.
15701C
2.INSTALL OIL COOLER COVER SUB-ASSEMBLY
Install a new gasket and the oil cooler cover with the 13 bolts.
Connect the No. 2 vacuum transmitting pipe with the 2 nuts.
Connect the vinyl tube.
Connect the oil pressure switch connector.
15601
3.INSTALL OIL FILTER SUB-ASSEMBLY
16267
4.CONNECT NO. 3 WATER BY-PASS HOSE (w/ EGR Cooler)
Connect the No. 3 water by-pass hose.
25804
5.INSTALL VACUUM CONTROL VALVE SET
22100
6.INSTALL SUPPLY PUMP ASSEMBLY
Install the supply pump (See page Engine / Hybrid System>1KD-FTV (FUEL)>FUEL SUPPLY PUMP>INSTALLATION).
23810A
7.INSTALL COMMON RAIL ASSEMBLY
Install the common rail (See page Engine / Hybrid System>1KD-FTV (FUEL)>COMMON RAIL>INSTALLATION).
28100
8.INSTALL STARTER ASSEMBLY
for 2.2 kW Type:
Install the starter (See page Engine / Hybrid System>1KD-FTV (STARTING)>STARTER (for 2.2 kW Type)>INSTALLATION).
for 2.7 kW Type:
Install the starter (See page Engine / Hybrid System>1KD-FTV (STARTING)>STARTER (for 2.7 kW Type)>INSTALLATION).
for 3.0 kW Type:
Install the starter (See page Engine / Hybrid System>1KD-FTV (STARTING)>STARTER (for 3.0 kW Type)>INSTALLATION).
10.BLEED AIR FROM FUEL SYSTEM
11.ADD ENGINE COOLANT
12.INSPECT FOR COOLANT LEAK
13.INSPECT FOR FUEL LEAK
14.INSPECT FOR OIL LEAK
51405A
15.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
52129B
16.INSTALL FRONT BUMPER LOWER COVER