1.INSTALL STUD BOLT
If a stud bolt is deformed or its threads are damaged, replace it.
Using an E10 "TORX" socket wrench, install the 3 stud bolts at the positions shown in the illustration.
Using an E8 "TORX" socket wrench, install the 4 stud bolts at the positions shown in the illustration.
Using an E5 "TORX" socket wrench, install the 4 stud bolts at the positions shown in the illustration.
| *A | w/o Urea SCR System | *B | w/ Urea SCR System |
17275
2.INSTALL COMPRESSOR OUTLET ELBOW
except Cold Area Specification Vehicles:
Install the hose clamp with the bolt.
Install a new gasket.
Install the compressor outlet elbow with the 2 nuts.
17274
3.INSTALL COMPRESSOR INLET ELBOW
Install a new gasket.
Using an E8 "TORX" socket wrench, install the compressor inlet elbow with the stud bolt.
Install the compressor inlet elbow to the turbocharger sub-assembly with the 2 nuts.
Install the compressor elbow stay with the 2 bolts.
16027
4.INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY
Install a new gasket.
Temporarily install the turbo water pipe sub-assembly with the bolt and 2 nuts.
Tighten the bolt and 2 nuts.
Connect the No. 1 turbo water hose and No. 2 turbo water hose to the No. 1 turbo water pipe sub-assembly and slide the 2 hose clips to secure the hoses.
15407
5.TEMPORARILY INSTALL TURBO OIL INLET PIPE SUB-ASSEMBLY
| *a | NG |
| *b | OK |
Install a new gasket as shown in the illustration.
Do not install the gasket upside down.
Temporarily install the turbo oil inlet pipe subassembly with the 2 nuts.
17141
6.TEMPORARILY INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY
Using an E8 "TORX" socket wrench, install 2 new stud bolts to the exhaust manifold.
Install a new gasket (No. 1 EGR pipe sub-assembly side) to the exhaust manifold.
Install a new gasket to the turbocharger sub-assembly.
Temporarily install the turbocharger sub-assembly with 3 new nuts.
| *1 | Collar |
|
Engine Side |
Install a new gasket (cylinder head side), and then temporarily install the exhaust manifold with 8 new nuts, 8 new collars and 8 new washers.
Make sure that the side of the collar with the smaller diameter faces the exhaust manifold.
Install a new gasket on the union bolt side to turbo oil inlet pipe sub-assembly.
Temporarily install the union bolt.
15474
7.INSTALL TURBO OIL OUTLET PIPE
Install a new gasket to the turbo oil outlet pipe.
The claws of the gasket must face the turbo oil outlet pipe.
Install the turbo oil outlet pipe with the 2 bolts.
w/ Cover:
Install the cover to the turbo oil outlet hose.
Connect the turbo oil outlet hose to the turbo oil outlet pipe, turbo oil inlet pipe and slide the 2 hose clips to secure the hoses.
17293
8.TEMPORARILY INSTALL TURBOCHARGER STAY
Temporarily install the turbocharger stay to the turbocharger sub-assembly, with 3 bolts and nut.
17141
9.TIGHTEN EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY
Tighten the exhaust manifold with turbocharger sub-assembly, to the cylinder head sub-assembly with 8 nuts.
Tighten the nuts in the order shown in the illustration.
Tighten the turbocharger sub-assembly, to the exhaust manifold with the 3 nuts.
Tighten the 2 nuts and then union bolt of the turbo oil inlet pipe sub-assembly.
If the connecting part of the union bolt gasket is cracked, remove the connecting part.
17293
10.TIGHTEN TURBOCHARGER STAY
Tighten the 3 bolts and nut of the turbocharger stay in the order shown in the illustration.
87101
11.INSTALL VISCOUS HEATER NO.1 BRACKET SUB-ASSEMBLY (for Cold Area Specification Vehicles)
|
No. 1 Viscous Heater Bracket Bolt |
|
No. 4 Engine Harness Bolt |
Temporarily install the No. 1 viscous heater bracket sub-assembly with 4 bolts.
Tighten the 4 bolts and of the No. 1 viscous heater bracket sub-assembly in the order shown in the illustration.
Connect the No. 4 engine harness with the bolt.
Connect the wire harness.
12.INSTALL OIL COOLER TUBE BRACKET AND WIRE HARNESS CLAMP BRACKET
Connect the wire harness clamp bracket with the bolt.
for Automatic Transmission:
Connect the oil cooler tube bracket with the bolt.
25601
13.CONNECT NO. 1 EGR PIPE SUB-ASSEMBLY
Connect the No. 1 EGR pipe sub-assembly with 2 new nuts.
16284
14.CONNECT TURBO WATER HOSE
Connect the No. 1 turbo water hose and No. 2 turbo water hose to the water outlet sub-assembly, engine water pump assembly and slide the 2 hose clips to secure the hoses.
The turbocharger sub-assembly may be damaged if the No. 1 turbo water hose and No. 2 turbo water hose are connected to the wrong locations.
16268
15.CONNECT NO. 1 WATER BY-PASS PIPE
16.CONNECT WATER BY-PASS HOSE (w/ Urea SCR System)
Connect the No. 4 turbo water hose to the turbocharger sub-assembly and No. 1 turbo water pipe sub-assembly and slide the 2 hose clips to secure the hoses.
Connect the No. 21 water by-pass hose to the turbocharger sub-assembly and No. 1 water by-pass pipe and slide the 2 hose clips to secure the hoses.
12203
17.INSTALL PCV HOSE (except Cold Area Specification Vehicles)
Attach the clamp and install the PCV hose.
Slide the 2 hose clips to secure the hoses.
12203
18.INSTALL PCV PIPE (for Cold Area Specification Vehicles)
w/o Urea SCR System
Connect the PCV pipe to the compressor inlet elbow, cylinder head cover sub-assembly and slide the 2 hose clips to secure the hoses.
Install the PCV pipe with the bolt to the compressor outlet elbow.
Connect the No. 19 water by-pass hose to the compressor inlet elbow and slide the hose clip to secure the hoses.
Install the No. 20 water by-pass hose to the PCV pipe and No. 1 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
w/ Urea SCR System:
Connect the PCV pipe to the compressor inlet elbow, cylinder head cover sub-assembly and slide the 2 hose clips to secure the hoses.
Install the PCV pipe with the 2 bolts to the compressor outlet elbow.
Connect the No. 19 water by-pass hose to the compressor inlet elbow and slide the hose clip to secure the hoses.
Install the No. 20 water by-pass hose to the PCV pipe and No. 1 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
16279
19.INSTALL NO. 3 WATER BY-PASS PIPE
Connect the 2 water hoses to the oil cooler assembly and No. 2 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
Install the No. 3 water by-pass pipe with the bolt.
for Cold Area Specification Vehicles:
Install the water hose to the compressor inlet elbow and No. 3 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
87209D
20.INSTALL WATER HOSE SUB-ASSEMBLY (w/ Viscous Heater)
87120G
21.INSTALL VISCOUS HEATER WITH MAGNET CLUTCH ASSEMBLY (for Cold Area Specification Vehicles)
22.INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Install the air cleaner case sub-assembly with the 3 bolts.
for Cold Area Specification Vehicles:
Connect the wire harness clamps.
17801
23.INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Install the air cleaner filter element sub-assembly to the air cleaner case.
17705
24.CONNECT AIR CLEANER CAP SUB-ASSEMBLY WITH AIR CLEANER HOSE
Attach the 4 clips to install the air cleaner cap sub-assembly with air cleaner hose.
Tighten the hose clamp.
Connect the mass air flow meter connector and attach the 2 wire harness clamps.
16711
25.INSTALL FAN SHROUD
16470
26.INSTALL RADIATOR RESERVOIR ASSEMBLY
16640
27.INSTALL INTERCOOLER RESERVOIR ASSEMBLY (w/ Urea SCR System)
16554B
28.INSTALL NO. 4 SUB-RADIATOR HOSE (w/ Urea SCR System)
16553B
29.INSTALL NO. 3 SUB-RADIATOR HOSE (w/ Urea SCR System)
161B0
30.INSTALL ELECTRIC WATER PUMP ASSEMBLY (w/ Urea SCR System)
16551B
31.INSTALL NO. 1 SUB-RADIATOR HOSE (w/ Urea SCR System)
16552B
32.INSTALL NO. 2 SUB-RADIATOR HOSE (w/ Urea SCR System)
16571C
33.INSTALL NO. 1 RADIATOR HOSE
82123
34.INSTALL NO. 3 ENGINE WIRE (for Cold Area Specification Vehicles)
44306
35.CONNECT VANE PUMP OIL RESERVOIR SUB-ASSEMBLY
17342F
36.INSTALL NO. 2 INTERCOOLER AIR HOSE (w/o Urea SCR System)
17341K
37.INSTALL INTERCOOLER AIR HOSE (w/o Urea SCR System)
17940D
38.INSTALL INTERCOOLER ASSEMBLY (w/ Urea SCR System)
25051
39.INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY
40.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
41.ADD ENGINE OIL
42.ADD ENGINE COOLANT
43.ADD ENGINE COOLANT (w/ Urea SCR System)
44.INSPECT FOR OIL LEAK
45.INSPECT ENGINE OIL LEVEL
46.INSPECT FOR COOLANT LEAK
47.INSPECT FOR COOLANT LEAK (w/ Urea SCR System)
48.INSPECT FOR EXHAUST GAS LEAK