Home › Engine / Hybrid System › 1UR-FE (INTAKE / EXHAUST) › INTAKE MANIFOLD › 2014.08–2015.08
RM2660E _51 Engine / Hybrid System _052788 1UR-FE INTAKE / EXHAUST _0255162 INTAKE MANIFOLD A

1UR-FE INTAKE / EXHAUST  INTAKE MANIFOLD  INSTALLATION  


PROCEDURE

Hide 22030 1.INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

a.
A218983E04
2.438,0.156 2.354,0.156 2.354,0.156 2.146,0.469 false 2.792,1.135 3.01,1.01 3.01,1.01 3.073,1.01 false 2.49,0.063 2.646,0.208 0.156,0.146 10 false *1 3.115,0.927 3.281,1.073 0.167,0.146 10 false *2

Align the protrusion of a new gasket with the groove of the intake manifold and install the gasket.

Text in Illustration
*1 Groove
*2 Protrusion


b.

Install the throttle body with motor assembly with the 4 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 25860 3.INSTALL PURGE VSV

a.

Connect the purge line hose to the intake manifold.


b.

Install the purge VSV to the intake manifold with the bolt.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 17650 4.INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)

a.

Install the vacuum switching valve to the intake manifold with the bolt.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


b.

Connect the 2 vacuum hoses to the vacuum switching valve and attach the 3 clamps.


Hide 5.INSTALL STUD BOLT

NOTICE:

If a stud bolt is deformed or its threads are damaged, replace it.


a.

Using an E5 "TORX" socket wrench, install the 2 stud bolts to the intake manifold.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


Hide 17114A 6.INSTALL INTAKE FLANGE

a.

Install the intake flange with the 2 nuts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 7.INSTALL V-BANK COVER PIN

a.

Install the V-bank cover pin to the intake manifold.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 11254 8.INSTALL V-BANK COVER BRACKET

a.

Install the V-bank cover bracket with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 9.INSTALL BRACKET

a.

Install the 2 brackets with the 2 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 23901 10.INSTALL FUEL TUBE SUB-ASSEMBLY

a.

Install the fuel tube to the intake manifold with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 17111 11.INSTALL INTAKE MANIFOLD

a.
A215297

Place 2 new gaskets on the intake manifold.


b.

Place the intake manifold on the cylinder head.


c.

Install and uniformly tighten the 8 bolts and 2 nuts in several steps.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


d.

Connect the fuel tube to the No. 2 fuel delivery pipe (See page Engine / Hybrid System>1UR-FE (FUEL)>FUEL SYSTEM>PRECAUTION).


e.

Connect the fuel tube to the fuel delivery pipe (See page Engine / Hybrid System>1UR-FE (FUEL)>FUEL SYSTEM>PRECAUTION).


f.

Attach the 3 wire harness clamps to the 3 wire harness brackets.


g.

Install the bolt.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


h.

Connect the purge VSV connector.


i.

Connect the purge line hose to the purge VSV.


j.

Connect the vacuum switching valve connector (for ACIS).


k.

Connect the PCV valve hose.


l.

Connect the No. 4 water by-pass hose.


m.

Connect the throttle position sensor and throttle control motor connector.


n.

w/o Secondary Air Injection System:

i.

Install the bracket with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


ii.

Attach the clamp and connect the manifold absolute pressure sensor connector.



Hide 12.INSTALL AIR TUBE SUB-ASSEMBLY (w/ Secondary Air Injection System)

a.

Install the air tube.


b.

Install the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.

Install the bracket with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


d.

Attach the clamp and connect the manifold absolute pressure sensor connector.


e.
A272662E02
1.948,0.677 2.135,0.469 2.135,0.469 2.198,0.469 true 1.667,0.771 1.604,0.406 1.604,0.406 1.521,0.406 true 2.219,0.385 2.406,0.573 0.188,0.188 10 true *1 1.344,0.333 1.5,0.479 0.156,0.146 10 false *2

Align the paint mark with the projection and connect the No. 2 air injection system hose.

Text in Illustration
*1 Projection
*2 Paint Mark

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.



Hide 12263 13.INSTALL PCV HOSE ASSEMBLY

a.

Install the PCV hose with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the PCV hose to the PCV pipe of the cylinder head cover LH and RH.


Hide 25625C 14.INSTALL EGR VALVE BRACKET

a.

Install the EGR valve bracket with the 3 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

Attach the 2 wire harness clamps and PCV hose clamp.


Hide 16289 15.INSTALL NO. 5 WATER BY-PASS PIPE

a.

Install the No. 5 water by-pass pipe with the 2 bolts and connect the 2 water by-pass hoses.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 51405A 17.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

Hide 53806 18.INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

Hide 53805 19.INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

Hide 22.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).