The shift control actuator assembly consists of a parking lock motor, range sensor and rotation angle sensor. The shift control ECU receives shift lever position signals from the shift lever position sensor (shift lock control unit assembly) and P position switch signal from the P position switch (parking switch) to operate the parking lock motor through current control to engage and release the parking lock. When the shift control ECU detects a malfunction in the parking lock motor system, the DTC is stored in the EV control ECU.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | Warning Indicate | DTC Output from | Priority |
|---|---|---|---|---|---|---|
| P1C8F14 | Park Pawl Motor Phase U Circuit Short to Ground or Open | Even though the P CON MTR relay operation permission signal is ON, the parking lock motor U phase terminal voltage (ECU recognition AD value) is continuously below 0.2 V for 1 second or more when the auxiliary battery voltage and the shift control supply voltage are 10 V or higher with the ignition switch ON
(1 trip detection logic) |
·
Auxiliary battery ·
Shift control supply ·
Shift control ECU ·
Shift control actuator assembly ·
P CON MTR relay ·
Wire harness or connector |
·
Master Warning -
Comes on ·
Multi-information Display Error Message -
Displayed |
EV | A |
| P1C9414 | Park Pawl Motor Phase V Circuit Short to Ground or Open | Even though the P CON MTR relay operation permission signal is ON, the parking lock motor V phase terminal voltage (ECU recognition AD value) is continuously below 0.2 V for 1 second or more when the auxiliary battery voltage and the shift control supply voltage are 10 V or higher with the ignition switch ON
(1 trip detection logic) |
·
Auxiliary battery ·
Shift control supply ·
Shift control ECU ·
Shift control actuator assembly ·
P CON MTR relay ·
Wire harness or connector |
·
Master Warning -
Comes on ·
Multi-information Display Error Message -
Displayed |
EV | A |
| P1C9914 | Park Pawl Motor Phase W Circuit Short to Ground or Open | Even though the P CON MTR relay operation permission signal is ON, the parking lock motor W phase terminal voltage (ECU recognition AD value) is continuously below 0.2 V for 1 second or more when the auxiliary battery voltage and the shift control supply voltage are 10 V or higher with the ignition switch ON
(1 trip detection logic) |
·
Auxiliary battery ·
Shift control supply ·
Shift control ECU ·
Shift control actuator assembly ·
P CON MTR relay ·
Wire harness or connector |
·
Master Warning -
Comes on ·
Multi-information Display Error Message -
Displayed |
EV | A |
After repair has been completed, clear the DTC and then check that the vehicle has returned to normal by performing the All Readiness check procedure.
Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>ELECTRONIC SHIFT LEVER SYSTEM>UTILITY
Turn the ignition switch to ON.
Depress the brake pedal and move the shift lever to select neutral (N).
Push the P position switch (parking switch) to select park (P).
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
The vehicle is equipped with a shift control supply. Therefore, ensure there is no power being supplied to the vehicle when disconnecting or reconnecting the connector of the shift control ECU and when removing or installing the shift control ECU.
Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>ELECTRONIC SHIFT LEVER SYSTEM>PRECAUTION
The fail-safe function turns the shift control actuator power source relay off when P1C8F14, P1C9414 or P1C9914 is output.
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
Pre-procedure1
Turn the ignition switch to ON.
Procedure1
Check if DTCs are output.
| Result | Proceed to |
|---|---|
| P1C8F14, P1C9414 and P1C9914 are output | A |
| Only P1C8F14, P1C9414 or P1C9914 is output | B |
| P1C8F14, P1C9414, P1C9914 and P176087 are output | C |
If DTCs P1C8F14, P1C9414 and P1C9914 are stored at the same time, there may be a malfunction in the parking lock motor (BMA signal) power source circuit.
If only DTC P1C8F14, P1C9414 or P1C9914 is stored, there may be a malfunction in the parking lock motor (MUA, MVA or MWA signal) circuit.
Post-procedure1
Turn the ignition switch off.
A
B
C
Pre-procedure1
Turn the ignition switch to ON.
Procedure1
Read the freeze frame data of DTC P1C8F14.
| Tester Display |
|---|
| Parking Lock Motor Main Relay Status |
| Parking Lock Motor Backup Relay Status |
| Result | Proceed to |
|---|---|
| The value of Parking Lock Motor Main Relay Status is ON | A |
| The value of Parking Lock Motor Backup Relay Status is ON | B |
| The value of Parking Lock Motor Main Relay Status and Parking Lock Motor Backup Relay Status are OFF | C |
Post-procedure1
Turn the ignition switch off.
A
B
C
Pre-procedure1
| *1 | Luggage Room Relay Block |
| *2 | P CON MTR Relay |
Remove the P CON MTR relay from the luggage room relay block.
Turn the ignition switch to ON.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| P CON MTR relay terminal 3 or 2 - Body ground | 11 seconds after turning the ignition switch to ON | 8 to 15.4 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Turn the ignition switch off.
Install the P CON MTR relay.
OK
NG
Pre-procedure1
| *1 | Luggage Room Relay Block |
| *2 | P CON MTR Relay |
Remove the P CON MTR relay from the luggage room relay block.
Procedure1
| *1 | P CON MTR Relay |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 - 5 | Auxiliary battery voltage not applied between terminals 1 and 2 | 10 kΩ or higher |
| 3 - 5 | Auxiliary battery voltage applied between terminals 1 and 2 | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Install the P CON MTR relay.
OK
NG
Pre-procedure1
Remove the P CON MTR relay from the luggage room relay block.
Disconnect the G12 shift control supply connector.
Disconnect the G153 parking lock motor (shift control actuator assembly) connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G153,G12)Location & Routingewd_type=routing;type=c,c;code=G153,G12 Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assemblyewd_type=component;type=c;code=G153;pinno=7 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=19 |
||
| P CON MTR relay terminal 5 - G153-7 (BMA) | Always | Below 1 Ω |
| P CON MTR relay terminal 5 - G12-19 (MA2) | Always | Below 1 Ω |
| P CON MTR relay terminal 5 or G153-7 (BMA) - Body ground and other terminals | Always | 10 kΩ or higher |
| P CON MTR relay terminal 5 or G12-19 (MA2) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the G153 parking lock motor (shift control actuator assembly) connector.
Reconnect the G12 shift control supply connector.
Install the P CON MTR relay.
OK
NG
Pre-procedure1
Disconnect the A44 shift control ECU connector.
Remove the P CON MTR relay from the luggage room relay block.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A44)Location & Routingewd_type=routing;type=c;code=A44 Click Connector(A44)Instrument Panel>Front Compartment Main Wire>Shift Control ECUewd_type=component;type=c;code=A44;pinno=12 |
||
| A44-12 (BMA1) - P CON MTR relay terminal 1 | Always | Below 1 Ω |
| A44-12 (BMA1) or P CON MTR relay terminal 1 - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Install the P CON MTR relay.
Reconnect the A44 shift control ECU connector.
OK
NG
Pre-procedure1
Disconnect the A44 shift control ECU connector.
Disconnect the G153 parking lock motor (shift control actuator assembly) connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A44,G153)Location & Routingewd_type=routing;type=c,c;code=A44,G153 Click Connector(A44)Instrument Panel>Front Compartment Main Wire>Shift Control ECUewd_type=component;type=c;code=A44;pinno=5,2,1 Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assemblyewd_type=component;type=c;code=G153;pinno=2,6,1 |
||
| A44-5 (MUA) - G153-2 (MUA) | Always | Below 1 Ω |
| A44-2 (MVA) - G153-6 (MVA) | Always | Below 1 Ω |
| A44-1 (MWA) - G153-1 (MWA) | Always | Below 1 Ω |
| A44-5 (MUA) or G153-2 (MUA) - Body ground and other terminals | Always | 10 kΩ or higher |
| A44-2 (MVA) or G153-6 (MVA) - Body ground and other terminals | Always | 10 kΩ or higher |
| A44-1 (MWA) or G153-1 (MWA) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the G153 parking lock motor (shift control actuator assembly) connector.
Reconnect the A44 shift control ECU connector.
OK
NG
Pre-procedure1
| *1 | Parking Lock Motor (Shift Control Actuator Assembly) |
Disconnect the parking lock motor (shift control actuator assembly) connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 2 (MUA) - 7 (BMA) | Always | 0.5 to 2 Ω |
| 6 (MVA) - 7 (BMA) | Always | 0.5 to 2 Ω |
| 1 (MWA) - 7 (BMA) | Always | 0.5 to 2 Ω |
| 2 (MUA) - 6 (MVA) | Always | 1 to 4 Ω |
| 6 (MVA) - 1 (MWA) | Always | 1 to 4 Ω |
| 1 (MWA) - 2 (MUA) | Always | 1 to 4 Ω |
| 2 (MUA) - Body ground | Always | 10 kΩ or higher |
| 6 (MVA) - Body ground | Always | 10 kΩ or higher |
| 1 (MWA) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the parking lock motor (shift control actuator assembly) connector.
OK
NG
Pre-procedure1
Remove the P CON MTR relay from the luggage room relay block.
Disconnect the G12 shift control supply connector.
Disconnect the G153 parking lock motor (shift control actuator assembly) connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G153,G12)Location & Routingewd_type=routing;type=c,c;code=G153,G12 Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assemblyewd_type=component;type=c;code=G153;pinno=7 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=19 |
||
| P CON MTR relay terminal 5 - G153-7 (BMA) | Always | Below 1 Ω |
| P CON MTR relay terminal 5 - G12-19 (MA2) | Always | Below 1 Ω |
| P CON MTR relay terminal 5 or G153-7 (BMA) - Body ground and other terminals | Always | 10 kΩ or higher |
| P CON MTR relay terminal 5 or G12-19 (MA2) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the G153 parking lock motor (shift control actuator assembly) connector.
Reconnect the G12 shift control supply connector.
Install the P CON MTR relay.
OK
for LHD: Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>SHIFT CONTROL POWER SUPPLY (for LHD)>REMOVAL
for RHD: Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>SHIFT CONTROL POWER SUPPLY (for RHD)>REMOVAL
NG
Pre-procedure1
None
Procedure1
Read the freeze frame data of DTC P1C8F14.
| Tester Display |
|---|
| Sub Battery Module Backup Status (Gear Shift Control Module) |
| Result | Proceed to |
|---|---|
| The value of Sub Battery Module Backup Status (Gear Shift Control Module) is not Sub Battery Module Fail Safe | A |
| The value of Sub Battery Module Backup Status (Gear Shift Control Module) is Sub Battery Module Fail Safe | B |
Post-procedure1
Turn the ignition switch off.
A
B
Pre-procedure1
Remove the P CON MTR relay from the luggage room relay block.
Disconnect the G12 shift control supply connector.
Disconnect the G153 parking lock motor (shift control actuator assembly) connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G153,G12)Location & Routingewd_type=routing;type=c,c;code=G153,G12 Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assemblyewd_type=component;type=c;code=G153;pinno=7 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=19 |
||
| P CON MTR relay terminal 5 - G153-7 (BMA) | Always | Below 1 Ω |
| P CON MTR relay terminal 5 - G12-19 (MA2) | Always | Below 1 Ω |
| P CON MTR relay terminal 5 or G153-7 (BMA) - Body ground and other terminals | Always | 10 kΩ or higher |
| P CON MTR relay terminal 5 or G12-19 (MA2) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the G153 parking lock motor (shift control actuator assembly) connector.
Reconnect the G12 shift control supply connector.
Install the P CON MTR relay.
OK
NG
Pre-procedure1
Disconnect the G12 shift control supply connector.
Disconnect the D92 shift control ECU connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G12,D92)Location & Routingewd_type=routing;type=c,c;code=G12,D92 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=4 Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECUewd_type=component;type=c;code=D92;pinno=24 |
||
| G12-4 (BMA2) - D92-24 (BMA2) | Always | Below 1 Ω |
| G12-4 (BMA2) or D92-24 (BMA2) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the D92 shift control ECU connector.
Reconnect the G12 shift control supply connector.
OK
NG
Pre-procedure1
Disconnect the G12 shift control supply connector.
Disconnect the D92 shift control ECU connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(D92,G12)Location & Routingewd_type=routing;type=c,c;code=D92,G12 Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECUewd_type=component;type=c;code=D92;pinno=29,22 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=14,3,2 |
||
| D92-29 (BUBO) - G12-14 (BR) | Always | Below 1 Ω |
| D92-22 (BUBI) - G12-3 (RO) | Always | Below 1 Ω |
| G12-2 (GND) - Body ground | Always | Below 1 Ω |
| D92-29 (BUBO) or G12-14 (BR) - Body ground and other terminals | Always | 10 kΩ or higher |
| D92-22 (BUBI) or G12-3 (RO) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the D92 shift control ECU connector.
Reconnect the G12 shift control supply connector.
OK
NG
Pre-procedure1
Remove the IG2 P NO. 2 fuse from the luggage room relay block.
Disconnect the G12 shift control supply connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G12)Location & Routingewd_type=routing;type=c;code=G12 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=16 |
||
| IG2 P NO. 2 fuse terminal 2 - G12-16 (IG) | Always | Below 1 Ω |
| IG2 P NO. 2 fuse terminal 2 or G12-16 (IG) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the G12 shift control supply connector.
Install the IG2 P NO. 2 fuse.
OK
NG
Pre-procedure1
Remove the CAPACITOR fuse from the luggage room relay block.
Disconnect the D92 shift control ECU connector.
Disconnect the G12 shift control supply connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G12)Location & Routingewd_type=routing;type=c;code=G12 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=7 |
||
| CAPACITOR fuse terminal 2 - G12-7 (+B) | Always | Below 1 Ω |
| CAPACITOR fuse terminal 2 or G12-7 (+B) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the G12 shift control supply connector.
Reconnect the D92 shift control ECU connector.
Install the CAPACITOR fuse.
OK
for LHD: Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>SHIFT CONTROL POWER SUPPLY (for LHD)>REMOVAL
for RHD: Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>SHIFT CONTROL POWER SUPPLY (for RHD)>REMOVAL
NG
Pre-procedure1
Turn the ignition switch off.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G12)Location & Routingewd_type=routing;type=c;code=G12 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=1 |
||
| G12-1 (+BAT) - Body ground | Ignition switch off | Below 1.9 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Pre-procedure1
Disconnect the G12 shift control supply connector.
Turn the ignition switch to ON.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G12)Location & Routingewd_type=routing;type=c;code=G12 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=1 |
||
| G12-1 (+BAT) - Body ground | Ignition switch ON | Below 1.9 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the G12 shift control supply connector.
OK
NG
Pre-procedure1
| *1 | Luggage Room Relay Block |
| *2 | P CON MTR Relay |
Remove the P CON MTR relay from the luggage room relay block.
Procedure1
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| P CON MTR relay terminal 3 or 2 - Body ground | Ignition switch to ON | 8 to 15.4 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Turn the ignition switch off.
Install the P CON MTR relay.
OK
NG
Charge the auxiliary battery.
| Proceed to |
|---|
| NEXT |
NEXT
Pre-procedure1
Turn the ignition switch to ON.
Procedure1
Clear the DTCs.
| Proceed to |
|---|
| NEXT |
Post-procedure1
Turn the ignition switch off.
Leave the vehicle as is for 60 seconds or more.
Do not connect the GTS.
Do not depress the brake pedal.
Do not open/close any of the doors.
NEXT
Pre-procedure1
Turn the ignition switch to ON.
Depress the brake pedal and move the shift lever to select neutral (N).
Check the shift state is Neutral (N), push the P position switch (parking switch) to select park (P).
Turn the ignition switch to ON and wait for 10 seconds or more.
Depress the brake pedal and move the shift lever to select neutral (N).
Push the P position switch (parking switch) to select park (P).
Procedure1
Check if DTCs are output.
| Result | Proceed to |
|---|---|
| DTCs are not output | A |
| P1C8F14, P1C9414 and P1C9914 are output | B |
Post-procedure1
Turn the ignition switch off.
A
B
Pre-procedure1
Disconnect the G12 shift control supply connector.
Disconnect the D92 shift control ECU connector.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(G12,D92)Location & Routingewd_type=routing;type=c,c;code=G12,D92 Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supplyewd_type=component;type=c;code=G12;pinno=16,3,7,2 Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECUewd_type=component;type=c;code=D92;pinno=22 |
||
| G12-16 (IG) - IG2 P NO. 2 fuse terminal 2 | Always | Below 1 Ω |
| G12-3 (RO) - D92-22 (BUBI) | Always | Below 1 Ω |
| CAPACITOR fuse terminal 2 - G12-7 (+B) | Always | Below 1 Ω |
| G12-2 (GND) - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the D92 shift control ECU connector.
Reconnect the G12 shift control supply connector.
OK
for LHD: Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>SHIFT CONTROL POWER SUPPLY (for LHD)>REMOVAL
for RHD: Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>SHIFT CONTROL POWER SUPPLY (for RHD)>REMOVAL
NG