DESCRIPTION

The shift control actuator assembly consists of a parking lock motor, range sensor and rotation angle sensor. The shift control ECU receives shift lever position signals from the shift lever position sensor (shift lock control unit assembly) and P position switch signal from the P position switch (parking switch) to operate the parking lock motor through current control to engage and release the parking lock. When the shift control ECU detects a malfunction in the parking lock motor system, the DTC is stored in the EV control ECU.

DTC No. Detection Item DTC Detection Condition Trouble Area Warning Indicate DTC Output from Priority
P1C8F14 Park Pawl Motor Phase U Circuit Short to Ground or Open Even though the P CON MTR relay operation permission signal is ON, the parking lock motor U phase terminal voltage (ECU recognition AD value) is continuously below 0.2 V for 1 second or more when the auxiliary battery voltage and the shift control supply voltage are 10 V or higher with the ignition switch ON
(1 trip detection logic)
·

Auxiliary battery

·

Shift control supply

·

Shift control ECU

·

Shift control actuator assembly

·

P CON MTR relay

·

Wire harness or connector


·

Master Warning

-

Comes on


·

Multi-information Display Error Message

-

Displayed



EV A
P1C9414 Park Pawl Motor Phase V Circuit Short to Ground or Open Even though the P CON MTR relay operation permission signal is ON, the parking lock motor V phase terminal voltage (ECU recognition AD value) is continuously below 0.2 V for 1 second or more when the auxiliary battery voltage and the shift control supply voltage are 10 V or higher with the ignition switch ON
(1 trip detection logic)
·

Auxiliary battery

·

Shift control supply

·

Shift control ECU

·

Shift control actuator assembly

·

P CON MTR relay

·

Wire harness or connector


·

Master Warning

-

Comes on


·

Multi-information Display Error Message

-

Displayed



EV A
P1C9914 Park Pawl Motor Phase W Circuit Short to Ground or Open Even though the P CON MTR relay operation permission signal is ON, the parking lock motor W phase terminal voltage (ECU recognition AD value) is continuously below 0.2 V for 1 second or more when the auxiliary battery voltage and the shift control supply voltage are 10 V or higher with the ignition switch ON
(1 trip detection logic)
·

Auxiliary battery

·

Shift control supply

·

Shift control ECU

·

Shift control actuator assembly

·

P CON MTR relay

·

Wire harness or connector


·

Master Warning

-

Comes on


·

Multi-information Display Error Message

-

Displayed



EV A

CONFIRMATION DRIVING PATTERN

HINT:

After repair has been completed, clear the DTC and then check that the vehicle has returned to normal by performing the All Readiness check procedure.

Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>ELECTRONIC SHIFT LEVER SYSTEM>UTILITY


1.

Turn the ignition switch to ON.

2.

Depress the brake pedal and move the shift lever to select neutral (N).

3.

Push the P position switch (parking switch) to select park (P).


WIRING DIAGRAM

C450176E02
6.198,3.313 7,3.531 0.802,0.219 10 false DRIVER 5.281,3.198 5.99,3.417 0.708,0.219 10 false BMA2 0.531,4.979 1.24,5.198 0.708,0.219 10 false IG 5.292,5.167 6,5.385 0.708,0.219 10 false IG2 5.292,4.688 6,4.906 0.708,0.219 10 false BUBI 5.292,4.24 6,4.458 0.708,0.219 10 false BUBO 5.292,3.75 6,3.969 0.708,0.219 10 false BUB 5.458,8.281 6.792,8.521 1.333,0.24 10 false Shift Control ECU 2.167,4.583 2.917,4.802 0.75,0.219 10 false RO 2.167,4.115 2.917,4.333 0.75,0.219 10 false BR 0.625,5.531 1.167,5.729 0.542,0.198 10 false G12 2.021,2.813 2.656,3.063 0.635,0.25 10 false +BAT 1.979,1.479 2.688,1.698 0.708,0.219 10 false BMA2 5.396,1.729 6.521,2.031 1.125,0.302 10 false P CON MAIN 5.406,1.167 6.531,1.469 1.125,0.302 10 false P CON MTR 2.063,0.896 2.573,1.115 0.51,0.219 10 false MA2 0.531,0.885 1.24,1.104 0.708,0.219 10 false +B 5.396,0.302 6.729,0.521 1.333,0.219 10 false CAPACITOR 5.292,2.615 6,2.833 0.708,0.219 10 false BMA1 5.292,2.25 6,2.469 0.708,0.219 10 false BATT 0.625,5.708 2.458,5.99 1.833,0.281 10 false Shift Control Supply 0.542,4.01 1.292,4.229 0.75,0.219 10 false GND 0.333,3.896 0.573,4.115 0.24,0.219 10 false 2 0.354,0.885 0.594,1.104 0.24,0.219 10 false 7 2.458,0.896 2.698,1.115 0.24,0.219 10 false 19 2.479,1.479 2.719,1.698 0.24,0.219 10 false 4 2.469,2.813 2.708,3.031 0.24,0.219 10 false 1 2.448,4.115 2.688,4.333 0.24,0.219 10 false 14 2.479,4.583 2.719,4.802 0.24,0.219 10 false 3 0.302,4.875 0.542,5.094 0.24,0.219 10 false 16 3.521,1.229 3.76,1.448 0.24,0.219 10 false 1 4.333,1.229 4.573,1.448 0.24,0.219 10 false 2 4.344,0.875 4.583,1.094 0.24,0.219 10 false 3 3.531,0.896 3.771,1.115 0.24,0.219 10 false 5 4.927,2.031 5.167,2.25 0.24,0.219 10 false 1 4.906,3.083 5.146,3.302 0.24,0.219 10 false 24 4.917,3.563 5.156,3.781 0.24,0.219 10 false 10 4.927,4.031 5.167,4.25 0.24,0.219 10 false 29 4.917,4.49 5.156,4.708 0.24,0.219 10 false 22 4.917,4.948 5.156,5.167 0.24,0.219 10 false 27 4.917,2.531 5.156,2.75 0.24,0.219 10 false 12 4.885,2.271 5.302,2.521 0.417,0.25 10 false D93 4.885,7.438 5.302,7.688 0.417,0.25 10 false A44 4.885,3.323 5.302,3.573 0.417,0.25 10 false D92 4.885,4.25 5.302,4.5 0.417,0.25 10 false D92 4.885,4.719 5.302,4.969 0.417,0.25 10 false D92 4.875,5.177 5.292,5.427 0.417,0.25 10 false D92 4.885,6.813 5.302,7.063 0.417,0.25 10 false A44 4.885,6.167 5.302,6.417 0.417,0.25 10 false A44 2.906,8.01 5.188,8.219 2.281,0.208 10 false Shift Control Actuator Assembly 2.917,7.833 3.458,8.031 0.542,0.198 10 false G153 4.073,6.042 4.781,6.26 0.708,0.219 10 false MUA 4.083,6.677 4.792,6.896 0.708,0.219 10 false MVA 4.042,7.313 4.75,7.531 0.708,0.219 10 false MWA 4.49,7.313 4.656,7.531 0.167,0.219 10 false 1 4.948,7.219 5.115,7.438 0.167,0.219 10 false 1 4.948,6.594 5.188,6.813 0.24,0.219 10 false 2 4.5,6.677 4.74,6.896 0.24,0.219 10 false 6 4.51,6.042 4.75,6.26 0.24,0.219 10 false 2 4.969,5.938 5.208,6.156 0.24,0.219 10 false 5 2.823,6.677 3.063,6.896 0.24,0.219 10 false 7 3.021,6.677 3.729,6.896 0.708,0.219 10 false BMA 4.885,2.76 5.302,3.01 0.417,0.25 10 false A44 5.26,6.052 5.969,6.271 0.708,0.219 10 false MUA 5.229,7.323 5.938,7.542 0.708,0.219 10 false MWA 5.25,6.698 5.958,6.917 0.708,0.219 10 false MVA 3.604,1.656 4.469,1.854 0.865,0.198 10 false P CON MTR 0.76,7.375 1.573,7.573 0.813,0.198 10 false IG2 P NO.2 4.896,3.771 5.313,4.021 0.417,0.25 10 false D92 6.198,2.76 7,2.979 0.802,0.219 10 false DRIVER

CAUTION / NOTICE / HINT

NOTICE:
·

After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION

·

The vehicle is equipped with a shift control supply. Therefore, ensure there is no power being supplied to the vehicle when disconnecting or reconnecting the connector of the shift control ECU and when removing or installing the shift control ECU.

Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>ELECTRONIC SHIFT LEVER SYSTEM>PRECAUTION

·

The fail-safe function turns the shift control actuator power source relay off when P1C8F14, P1C9414 or P1C9914 is output.

·

Inspect the fuses for circuits related to this system before performing the following inspection procedure.



PROCEDURE

1.CHECK DTC OUTPUT (EV)

Pre-procedure1

a.

Turn the ignition switch to ON.


Procedure1

a.

Check if DTCs are output.

Powertrain > EV > Trouble Codes
50001 397
Result:
Result Proceed to
P1C8F14, P1C9414 and P1C9914 are output A
Only P1C8F14, P1C9414 or P1C9914 is output B
P1C8F14, P1C9414, P1C9914 and P176087 are output C


HINT:
·

If DTCs P1C8F14, P1C9414 and P1C9914 are stored at the same time, there may be a malfunction in the parking lock motor (BMA signal) power source circuit.

·

If only DTC P1C8F14, P1C9414 or P1C9914 is stored, there may be a malfunction in the parking lock motor (MUA, MVA or MWA signal) circuit.




Post-procedure1

a.

Turn the ignition switch off.



A

2.CHECK FREEZE FRAME DATA (PARKING LOCK MOTOR MAIN RELAY STATUS, PARKING LOCK MOTOR BACKUP RELAY STATUS)

B

7.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY))

C

22.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - SHIFT CONTROL SUPPLY)
2.CHECK FREEZE FRAME DATA (PARKING LOCK MOTOR MAIN RELAY STATUS, PARKING LOCK MOTOR BACKUP RELAY STATUS)

Pre-procedure1

a.

Turn the ignition switch to ON.


Procedure1

a.

Read the freeze frame data of DTC P1C8F14.

Powertrain > EV > Trouble Codes
50001 397
Powertrain > EV > DTC(P1C8F14) > Freeze Frame Data
Tester Display
Parking Lock Motor Main Relay Status
Parking Lock Motor Backup Relay Status
50040 397 489,488 P1C8F14

Result:
Result Proceed to
The value of Parking Lock Motor Main Relay Status is ON A
The value of Parking Lock Motor Backup Relay Status is ON B
The value of Parking Lock Motor Main Relay Status and Parking Lock Motor Backup Relay Status are OFF C


Post-procedure1

a.

Turn the ignition switch off.



A

3.CHECK HARNESS AND CONNECTOR (P CON MTR RELAY POWER SOURCE CIRCUIT)

B

10.CHECK FREEZE FRAME DATA (SUB BATTERY MODULE BACKUP STATUS (GEAR SHIFT CONTROL MODULE)

C

18.CHECK HARNESS AND CONNECTOR (P CON MTR RELAY POWER SOURCE CIRCUIT)
3.CHECK HARNESS AND CONNECTOR (P CON MTR RELAY POWER SOURCE CIRCUIT)

Pre-procedure1

a.
C453748C01
0.198,0.177 0.51,0.375 0.313,0.198 10 false *1 0.458,1.844 0.771,2.042 0.313,0.198 10 false *2
*1 Luggage Room Relay Block
*2 P CON MTR Relay


Remove the P CON MTR relay from the luggage room relay block.


b.

Turn the ignition switch to ON.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
P CON MTR relay terminal 3 or 2 - Body ground 11 seconds after turning the ignition switch to ON 8 to 15.4 V



Result:
Proceed to
OK
NG


Post-procedure1

a.

Turn the ignition switch off.


b.

Install the P CON MTR relay.



OK

4.INSPECT P CON MTR RELAY

NG

9.CHECK HARNESS AND CONNECTOR (PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY) - P CON MTR RELAY, SHIFT CONTROL SUPPLY)
4.INSPECT P CON MTR RELAY

Pre-procedure1

a.
C453749C01
1.323,2.521 1.99,2.927 true 0.219,0.177 0.531,0.375 0.313,0.198 10 false *1 2.104,2.958 2.406,3.188 0.302,0.229 10 false *2
*1 Luggage Room Relay Block
*2 P CON MTR Relay


Remove the P CON MTR relay from the luggage room relay block.


Procedure1

a.
C453750C01
0.094,0.094 0.406,0.292 0.313,0.198 10 false *1
*1 P CON MTR Relay


Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
3 - 5 Auxiliary battery voltage not applied between terminals 1 and 2 10 kΩ or higher
3 - 5 Auxiliary battery voltage applied between terminals 1 and 2 Below 1 Ω



Result:
Proceed to
OK
NG


Post-procedure1

a.

Install the P CON MTR relay.



OK

5.CHECK HARNESS AND CONNECTOR (PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY) - P CON MTR RELAY, SHIFT CONTROL SUPPLY)

NG

REPLACE P CON MTR RELAY

5.CHECK HARNESS AND CONNECTOR (PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY) - P CON MTR RELAY, SHIFT CONTROL SUPPLY)

Pre-procedure1

a.

Remove the P CON MTR relay from the luggage room relay block.


b.

Disconnect the G12 shift control supply connector.


c.

Disconnect the G153 parking lock motor (shift control actuator assembly) connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(G153,G12)Location & Routing

Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assembly

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

P CON MTR relay terminal 5 - G153-7 (BMA) Always Below 1 Ω
P CON MTR relay terminal 5 - G12-19 (MA2) Always Below 1 Ω
P CON MTR relay terminal 5 or G153-7 (BMA) - Body ground and other terminals Always 10 kΩ or higher
P CON MTR relay terminal 5 or G12-19 (MA2) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the G153 parking lock motor (shift control actuator assembly) connector.


b.

Reconnect the G12 shift control supply connector.


c.

Install the P CON MTR relay.



OK

6.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - P CON MTR RELAY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

6.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - P CON MTR RELAY)

Pre-procedure1

a.

Disconnect the A44 shift control ECU connector.


b.

Remove the P CON MTR relay from the luggage room relay block.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A44)Location & Routing

Click Connector(A44)Instrument Panel>Front Compartment Main Wire>Shift Control ECU

A44-12 (BMA1) - P CON MTR relay terminal 1 Always Below 1 Ω
A44-12 (BMA1) or P CON MTR relay terminal 1 - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Install the P CON MTR relay.


b.

Reconnect the A44 shift control ECU connector.



OK

7.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY))

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

7.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY))

Pre-procedure1

a.

Disconnect the A44 shift control ECU connector.


b.

Disconnect the G153 parking lock motor (shift control actuator assembly) connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A44,G153)Location & Routing

Click Connector(A44)Instrument Panel>Front Compartment Main Wire>Shift Control ECU

Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assembly

A44-5 (MUA) - G153-2 (MUA) Always Below 1 Ω
A44-2 (MVA) - G153-6 (MVA) Always Below 1 Ω
A44-1 (MWA) - G153-1 (MWA) Always Below 1 Ω
A44-5 (MUA) or G153-2 (MUA) - Body ground and other terminals Always 10 kΩ or higher
A44-2 (MVA) or G153-6 (MVA) - Body ground and other terminals Always 10 kΩ or higher
A44-1 (MWA) or G153-1 (MWA) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the G153 parking lock motor (shift control actuator assembly) connector.


b.

Reconnect the A44 shift control ECU connector.



OK

8.INSPECT SHIFT CONTROL ACTUATOR ASSEMBLY (SHIFT CONTROL ACTUATOR ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

8.INSPECT SHIFT CONTROL ACTUATOR ASSEMBLY (SHIFT CONTROL ACTUATOR ASSEMBLY)

Pre-procedure1

a.
C429133C06
2.333,0.917 2.865,0.5 true 2.083,0.917 2.198,0.469 true 2.333,1.25 2.823,1.677 true 2.167,1.75 2.063,1.281 true 0.094,0.094 0.406,0.292 0.313,0.198 10 false *1 2.875,0.333 3.333,0.531 0.458,0.198 10 false MWA 2.125,0.25 2.583,0.448 0.458,0.198 10 false MUA 2.875,1.719 3.333,1.917 0.458,0.198 10 false MVA 2.125,1.802 2.583,2 0.458,0.198 10 false BMA
*1 Parking Lock Motor (Shift Control Actuator Assembly)


Disconnect the parking lock motor (shift control actuator assembly) connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
2 (MUA) - 7 (BMA) Always 0.5 to 2 Ω
6 (MVA) - 7 (BMA) Always 0.5 to 2 Ω
1 (MWA) - 7 (BMA) Always 0.5 to 2 Ω
2 (MUA) - 6 (MVA) Always 1 to 4 Ω
6 (MVA) - 1 (MWA) Always 1 to 4 Ω
1 (MWA) - 2 (MUA) Always 1 to 4 Ω
2 (MUA) - Body ground Always 10 kΩ or higher
6 (MVA) - Body ground Always 10 kΩ or higher
1 (MWA) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the parking lock motor (shift control actuator assembly) connector.



OK

NG

9.CHECK HARNESS AND CONNECTOR (PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY) - P CON MTR RELAY, SHIFT CONTROL SUPPLY)

Pre-procedure1

a.

Remove the P CON MTR relay from the luggage room relay block.


b.

Disconnect the G12 shift control supply connector.


c.

Disconnect the G153 parking lock motor (shift control actuator assembly) connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(G153,G12)Location & Routing

Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assembly

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

P CON MTR relay terminal 5 - G153-7 (BMA) Always Below 1 Ω
P CON MTR relay terminal 5 - G12-19 (MA2) Always Below 1 Ω
P CON MTR relay terminal 5 or G153-7 (BMA) - Body ground and other terminals Always 10 kΩ or higher
P CON MTR relay terminal 5 or G12-19 (MA2) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the G153 parking lock motor (shift control actuator assembly) connector.


b.

Reconnect the G12 shift control supply connector.


c.

Install the P CON MTR relay.



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

10.CHECK FREEZE FRAME DATA (SUB BATTERY MODULE BACKUP STATUS (GEAR SHIFT CONTROL MODULE)

Pre-procedure1

a.

None


Procedure1

a.

Read the freeze frame data of DTC P1C8F14.

Powertrain > EV > Trouble Codes
50001 397
Powertrain > EV > DTC(P1C8F14) > Freeze Frame Data
Tester Display
Sub Battery Module Backup Status (Gear Shift Control Module)
50040 397 576 P1C8F14
Result:
Result Proceed to
The value of Sub Battery Module Backup Status (Gear Shift Control Module) is not Sub Battery Module Fail Safe A
The value of Sub Battery Module Backup Status (Gear Shift Control Module) is Sub Battery Module Fail Safe B



Post-procedure1

a.

Turn the ignition switch off.



A

11.CHECK HARNESS AND CONNECTOR (PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY) - P CON MTR RELAY, SHIFT CONTROL SUPPLY)

B

16.CHECK SHIFT CONTROL SUPPLY VOLTAGE
11.CHECK HARNESS AND CONNECTOR (PARKING LOCK MOTOR (SHIFT CONTROL ACTUATOR ASSEMBLY) - P CON MTR RELAY, SHIFT CONTROL SUPPLY)

Pre-procedure1

a.

Remove the P CON MTR relay from the luggage room relay block.


b.

Disconnect the G12 shift control supply connector.


c.

Disconnect the G153 parking lock motor (shift control actuator assembly) connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(G153,G12)Location & Routing

Click Connector(G153)Body>Floor Wire / No. 3 Floor Wire>Shift Control Actuator Assembly

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

P CON MTR relay terminal 5 - G153-7 (BMA) Always Below 1 Ω
P CON MTR relay terminal 5 - G12-19 (MA2) Always Below 1 Ω
P CON MTR relay terminal 5 or G153-7 (BMA) - Body ground and other terminals Always 10 kΩ or higher
P CON MTR relay terminal 5 or G12-19 (MA2) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the G153 parking lock motor (shift control actuator assembly) connector.


b.

Reconnect the G12 shift control supply connector.


c.

Install the P CON MTR relay.



OK

12.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - SHIFT CONTROL SUPPLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

12.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - SHIFT CONTROL SUPPLY)

Pre-procedure1

a.

Disconnect the G12 shift control supply connector.


b.

Disconnect the D92 shift control ECU connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(G12,D92)Location & Routing

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECU

G12-4 (BMA2) - D92-24 (BMA2) Always Below 1 Ω
G12-4 (BMA2) or D92-24 (BMA2) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the D92 shift control ECU connector.


b.

Reconnect the G12 shift control supply connector.



OK

13.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL SUPPLY - SHIFT CONTROL ECU, BODY GROUND)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

13.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL SUPPLY - SHIFT CONTROL ECU, BODY GROUND)

Pre-procedure1

a.

Disconnect the G12 shift control supply connector.


b.

Disconnect the D92 shift control ECU connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(D92,G12)Location & Routing

Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECU

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

D92-29 (BUBO) - G12-14 (BR) Always Below 1 Ω
D92-22 (BUBI) - G12-3 (RO) Always Below 1 Ω
G12-2 (GND) - Body ground Always Below 1 Ω
D92-29 (BUBO) or G12-14 (BR) - Body ground and other terminals Always 10 kΩ or higher
D92-22 (BUBI) or G12-3 (RO) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the D92 shift control ECU connector.


b.

Reconnect the G12 shift control supply connector.



OK

14.CHECK HARNESS AND CONNECTOR (IG2 P NO. 2 FUSE - SHIFT CONTROL SUPPLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

14.CHECK HARNESS AND CONNECTOR (IG2 P NO. 2 FUSE - SHIFT CONTROL SUPPLY)

Pre-procedure1

a.

Remove the IG2 P NO. 2 fuse from the luggage room relay block.


b.

Disconnect the G12 shift control supply connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(G12)Location & Routing

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

IG2 P NO. 2 fuse terminal 2 - G12-16 (IG) Always Below 1 Ω
IG2 P NO. 2 fuse terminal 2 or G12-16 (IG) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the G12 shift control supply connector.


b.

Install the IG2 P NO. 2 fuse.



OK

15.CHECK HARNESS AND CONNECTOR (CAPACITOR FUSE - SHIFT CONTROL SUPPLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

15.CHECK HARNESS AND CONNECTOR (CAPACITOR FUSE - SHIFT CONTROL SUPPLY)

Pre-procedure1

a.

Remove the CAPACITOR fuse from the luggage room relay block.


b.

Disconnect the D92 shift control ECU connector.


c.

Disconnect the G12 shift control supply connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(G12)Location & Routing

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

CAPACITOR fuse terminal 2 - G12-7 (+B) Always Below 1 Ω
CAPACITOR fuse terminal 2 or G12-7 (+B) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the G12 shift control supply connector.


b.

Reconnect the D92 shift control ECU connector.


c.

Install the CAPACITOR fuse.



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

16.CHECK SHIFT CONTROL SUPPLY VOLTAGE

Pre-procedure1

a.

Turn the ignition switch off.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(G12)Location & Routing

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

G12-1 (+BAT) - Body ground Ignition switch off Below 1.9 V



Result:
Proceed to
OK
NG


Post-procedure1

a.

None



OK

17.CHECK SHIFT CONTROL SUPPLY VOLTAGE

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

17.CHECK SHIFT CONTROL SUPPLY VOLTAGE

Pre-procedure1

a.

Disconnect the G12 shift control supply connector.


b.

Turn the ignition switch to ON.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(G12)Location & Routing

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

G12-1 (+BAT) - Body ground Ignition switch ON Below 1.9 V



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the G12 shift control supply connector.



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

18.CHECK HARNESS AND CONNECTOR (P CON MTR RELAY POWER SOURCE CIRCUIT)

Pre-procedure1

a.
C453748C01
0.198,0.177 0.51,0.375 0.313,0.198 10 false *1 0.458,1.844 0.771,2.042 0.313,0.198 10 false *2
*1 Luggage Room Relay Block
*2 P CON MTR Relay


Remove the P CON MTR relay from the luggage room relay block.


Procedure1

a.

Turn the ignition switch to ON.


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
P CON MTR relay terminal 3 or 2 - Body ground Ignition switch to ON 8 to 15.4 V



Result:
Proceed to
OK
NG


Post-procedure1

a.

Turn the ignition switch off.


b.

Install the P CON MTR relay.



OK

19.CHARGE AUXILIARY BATTERY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

19.CHARGE AUXILIARY BATTERY
a.

Charge the auxiliary battery.


Result:
Proceed to
NEXT



NEXT

20.CLEAR DTC
20.CLEAR DTC

Pre-procedure1

a.

Turn the ignition switch to ON.


Procedure1

a.

Clear the DTCs.

Powertrain > EV > Clear DTCs
50002 397

Result:
Proceed to
NEXT


Post-procedure1

a.

Turn the ignition switch off.


b.

Leave the vehicle as is for 60 seconds or more.

NOTICE:
·

Do not connect the GTS.

·

Do not depress the brake pedal.

·

Do not open/close any of the doors.





NEXT

21.CHECK DTC OUTPUT (SIMULATION TEST)
21.CHECK DTC OUTPUT (SIMULATION TEST)

Pre-procedure1

a.

Turn the ignition switch to ON.


b.

Depress the brake pedal and move the shift lever to select neutral (N).


c.

Check the shift state is Neutral (N), push the P position switch (parking switch) to select park (P).


d.

Turn the ignition switch to ON and wait for 10 seconds or more.


e.

Depress the brake pedal and move the shift lever to select neutral (N).


f.

Push the P position switch (parking switch) to select park (P).


Procedure1

a.

Check if DTCs are output.

Powertrain > EV > Trouble Codes
50001 397

Result:
Result Proceed to
DTCs are not output A
P1C8F14, P1C9414 and P1C9914 are output B


Post-procedure1

a.

Turn the ignition switch off.



A

END

B

22.CHECK HARNESS AND CONNECTOR (SHIFT CONTROL ECU - SHIFT CONTROL SUPPLY)

Pre-procedure1

a.

Disconnect the G12 shift control supply connector.


b.

Disconnect the D92 shift control ECU connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (Check for Open):
Tester Connection Condition Specified Condition

Click Location & Routing(G12,D92)Location & Routing

Click Connector(G12)Instrument Panel>Floor Wire>Shift Control Supply

Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECU

G12-16 (IG) - IG2 P NO. 2 fuse terminal 2 Always Below 1 Ω
G12-3 (RO) - D92-22 (BUBI) Always Below 1 Ω
CAPACITOR fuse terminal 2 - G12-7 (+B) Always Below 1 Ω
G12-2 (GND) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG


Post-procedure1

a.

Reconnect the D92 shift control ECU connector.


b.

Reconnect the G12 shift control supply connector.



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR