The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the hydrogen inlet receptacle O-ring replacement are shown below.
When the cable is disconnected/reconnected to the auxiliary battery terminal, systems temporarily stop operating. However, each system has a function that completes learning the first time the system is used.
Learning completes when vehicle is driven
Learning completes when vehicle is operated normally
| Effect/Inoperative Function When Necessary Procedures are not Performed | Necessary Procedures | Link |
|---|---|---|
| Air conditioning system | After the ignition switch is turned to ON, the servo motor and expansion valve standard position is recognized. | - |
Work procedures must be performed in an area with good ventilation (airflow) where hydrogen gas will not accumulate, and flames or other things that could act as ignition sources must not be present.
Accumulated hydrogen gas could ignite, resulting in a serious accident.
| *a | When inside of piping is pressurized |
Do not install or remove any hydrogen system components without first performing depressurization procedures.
The highly pressurized hydrogen gas inside the hydrogen tank assembly could blow out, resulting in a serious accident.
| *a | Manual Valve Open |
Do not perform depressurization procedures when the manual valve of the hydrogen tank assembly is open.
The highly pressurized hydrogen gas inside the hydrogen tank assembly could blow out, resulting in a serious accident.
When performing depressurization, do not perform procedures by hand without wearing protective glasses and gloves.
The highly pressurized hydrogen gas inside the hydrogen tank assembly could blow out, resulting in a serious accident.
| *a | After depressurization procedures, the high pressure piping union nut that is loosened first. |
After performing depressurization procedures, when first loosening the union nut of the high pressure hydrogen piping, do not loosen the union nut by hand without wearing protective glasses and gloves.
Even when depressurization procedures are performed, the pressurized hydrogen gas inside the high pressure hydrogen piping cannot be completely depressurized, so the highly pressurized hydrogen gas remaining in the high pressure hydrogen piping could blow out, resulting in a serious accident.
When performing the primary leak inspection, do not perform procedures without wearing protective glasses and gloves.
High pressure nitrogen gas could cause a serious accident.
1. PRECAUTION
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal.
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>BEFORE DISCONNECTING BATTERY
Place signs [HIGH PRESSURE GAS WORK IN PROGRESS - DO NOT TOUCH!], etc. to warn other technicians to be cautious. (An example sign is included, so make a copy and use it.)
When performing depressurization, do not open or close any parts of the hydrogen gas piping except for the following:
- Adjustment bolt of the hydrogen tank assembly manual valve
- Tank shut valve of the hydrogen tank assembly
- No. 1 hydrogen supply regulator plug
Even when not removing or installing the high pressure hydrogen piping, be careful not to pull or otherwise apply strain to the high pressure hydrogen piping.
When reusable parts such as the hydrogen tank assembly valve portion, hydrogen inlet receptacle, hydrogen tube joint and hydrogen supply regulator have been removed, to protect the seal portions and threaded portions from damage as well as to prevent foreign matter such as dust and metal fragments from entering through openings, cover these areas with protective tape.
Do not use packing tape, or any other tape that will leave residue on parts, as protective tape.
| *a | Protective Tape |
| *b | Seal Portion |
| *c | Threaded Portion |
Protect seal portions and threaded portions as shown in the illustration.
To protect the seal portions and threaded portions from damage or contamination by foreign matter, remove the protective tape immediately before installation.
When reassembling components that have been removed, make sure that there is no foreign matter adhering to the openings.
When the vehicle is parked with the ignition switch off, if the FC control ECU judges that the FC stack temperature will go below 0°C (32°F), it activates the FC air compressor, hydrogen pump and FC cooling water pump for a maximum of 180 seconds and drains water from the FC stack assembly. When performing inspection or repairs with the ignition switch off (not on (IG) or on (READY)), disconnect the cable from the negative (-) auxiliary battery terminal before performing work.
When frost has formed on the hydrogen tank assembly or piping, water droplets may be formed when the frost begins to melt. If water droplets enter the tank or piping, it could result in blockage of the hydrogen piping, so do not allow water droplets to enter the tank or piping.
58404B
2.REMOVE REAR NO. 4 FLOOR BOARD SUB-ASSEMBLY
58403L
3.REMOVE REAR NO. 3 FLOOR BOARD SUB-ASSEMBLY
58402K
4.REMOVE NO. 2 FLOOR BOARD SUB-ASSEMBLY
57628E
5.REMOVE REAR FLOOR SIDE MEMBER COVER LH
58398F
6.REMOVE NO. 1 FLOOR UNDER COVER
17DB3
7.REMOVE NO. 3 FC EXHAUST PIPE
8. PRESSURE RELEASE OPERATION
9.DISCONNECT CABLE FROM NEGATIVE AUXILIARY BATTERY TERMINAL
77AE2
10.DISCONNECT HYDROGEN INLET RECEPTACLE CAP
11.REMOVE HYDROGEN INLET RECEPTACLE ASSEMBLY O RING
| *a | 35 MPa (357 kgf/cm2) O-ring |
| *b | 70 MPa (714 kgf/cm2) O-ring |
Be careful not to damage the 70 MPa (714 kgf/cm2) O-ring.
Perform this procedure when the O-ring has been damaged or remains inside the receptacle assembly.
Clean the area around the fuel lid.
Do not use solvents to clean.
To prevent entry of foreign matter, make sure to clean with the receptacle cap installed.
Using tools made from plastic resin, remove the O-ring from the hydrogen inlet receptacle.
When cleaning, use a clean, dry cloth.
Do not use compressed air or solvents to clean.
If an O-ring has been dropped, check it for scratches or other damage, then clean away any dust or other foreign matter before using it.
If foreign matter cannot be removed, use a new O-ring.
To avoid scratching or damaging the hydrogen inlet receptacle, use tools made from plastic resin.
12.INSTALL HYDROGEN INLET RECEPTACLE ASSEMBLY O RING
| *a | 35 MPa (357 kgf/cm2) O-ring |
| *b | 70 MPa (714 kgf/cm2) O-ring |
Be careful not to damage the 70 MPa (714 kgf/cm2) O-ring.
If an O-ring has been dropped, check it for scratches or other damage, then clean away any dust or other foreign matter before using it.
If foreign matter cannot be removed, use a new O-ring.
Clean the area around the fuel lid.
Do not use solvents to clean.
To prevent entry of foreign matter, make sure to clean with the receptacle cap installed.
If the groove of the O-ring installation portion is dirty, clean it out with a piece of cloth wrapped around a tool made from plastic resin.
When cleaning, use a piece of cloth which does not easily shed fibers.
Do not use compressed air or solvents to clean.
To avoid scratching or damaging the hydrogen inlet receptacle assembly, use tools made from plastic resin.
Apply TOYOTA Genuine FC Grease to the O-ring.
Install the O-ring to the hydrogen inlet receptacle assembly.
| *a | Correct |
| *b | Incorrect |
Check that the O-ring is correctly seated.
13.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
14. FIRST LEAK CHECK
The primary leak inspection is performed when hydrogen inlet receptacle O-ring is replaced.
The primary leak inspection is performed using nitrogen gas.
When performing the primary leak inspection, remove the floor covers and rear wheel house liner so that the high pressure and medium pressure hydrogen system components and high pressure and medium pressure hydrogen system pipes are visible during inspection.
When performing the primary leak inspection, do not perform procedures without wearing protective glasses and gloves.
High pressure nitrogen gas could cause a serious accident.
After performing the primary leak inspection and confirming that there are no leaks, perform secondary leak inspection.
| *a | Manual Valve Closed |
| *b | Adjustment Bolt |
Using an 8 mm socket hexagon wrench, apply the specified tightening torque to the adjustment bolt to make sure the manual valve of the No. 1 hydrogen tank assembly is closed.
The manual valve shuts off the pressure from the hydrogen tank assembly, so be careful not to damage the hexagonal portion.
If the hexagonal portion has been damaged, the No. 1 hydrogen tank assembly must be replaced.
To prevent nitrogen gas from flowing into the hydrogen tank assembly, do not open the manual valve until after the primary leak inspection is completed.
| *a | Manual Valve Closed |
| *b | Adjustment Bolt |
Using an 8 mm socket hexagon wrench, apply the specified tightening torque to the adjustment bolt to make sure the manual valve of the No. 2 hydrogen tank assembly is closed.
The manual valve shuts off the pressure from the hydrogen tank assembly, so be careful not to damage the hexagonal portion.
If the hexagonal portion has been damaged, the No. 2 hydrogen tank assembly must be replaced.
To prevent nitrogen gas from flowing into the hydrogen tank assembly, do not open the manual valve until after the primary leak inspection is completed.
| *a | Manual Valve Closed |
| *b | Adjustment Bolt |
Using an 8 mm socket hexagon wrench, apply the specified tightening torque to the adjustment bolt to make sure the manual valve of the No. 3 hydrogen tank assembly is closed.
The manual valve shuts off the pressure from the hydrogen tank assembly, so be careful not to damage the hexagonal portion.
If the hexagonal portion has been damaged, the No. 2 hydrogen tank assembly must be replaced.
To prevent nitrogen gas from flowing into the hydrogen tank assembly, do not open the manual valve until after the primary leak inspection is completed.
Prepare SST (10 MPa leak inspection tool).
| *a | SST (Port Assembly) |
| *b | Vehicle-side Hose |
Remove the vehicle-side hose from the cock valve portion of SST (port assembly).
| *a | SST (Port Assembly) |
Completely wipe away any and all adhesive remaining in the receptacle on the valve side and adhering to the connecting fittings of the hose, then blow with compressed air.
When performing this step, make sure that the cock valve is closed to prevent entry of foreign matter.
If foreign matter is allowed to enter, it could result in damage to the vehicle or device.
| *a | Seal Tape |
Wrap 2-3 turns of thread seal tape around the threads of SST (10 MPa leak inspection tool), but do not cover the last 2-3 rows of threads.
| *a | SST (Port Assembly) |
| *b | SST (10 MPa Leak Inspection Tool |
Install SST (10 MPa leak inspection tool) to SST (port assembly).
| *a | SST (Port Assembly) |
| *b | Discharge Valve Closed Condition |
| *c | Injection Valve Closed Condition |
Check that the injection valve and discharge valve of SST (port assembly) are closed.
| *a | SST (Regulator Assembly) |
Connect SST (regulator assembly) to a nitrogen cylinder.
Wrap the threaded portion with seal tape.
Securely tighten so that nitrogen gas will not leak out.
Connect the nitrogen cylinder and SST (10 MPa (102 kgf/cm2, 1450 psi) leak inspection tool) to the hydrogen inlet receptacle.
Leave the nitrogen regulator valve closed.
The internal volume from the cylinder to the nozzle should be 130 cc or less.
The smallest marking of the pressure system should be 0.2 MPa (2.0 kgf/cm2, 29 psi) or less.
| *a | SST (Port Assembly) | *b | SST (Regulator Assembly) |
| *c | Nitrogen Cylinder | *d | SST (10 MPa (102 kgf/cm2, 1450 psi) Leak Inspection Tool) |
| *a | Open the Nitrogen Cylinder Valve |
Slowly open the nitrogen cylinder valve.
| *a | SST (Port Assembly) |
| *b | Slowly Open |
Slowly open the injection valve of SST (port assembly).
| *a | SST (Regulator Assembly) |
| *b | Open the Nitrogen Cylinder Valve |
Slowly rotate the handle of SST (regulator assembly) in the clockwise direction to open the valve, and let the pressure rise to 10 MPa (102.0 kgf/cm2, 1450 psi).
Raise the pressure to 10 MPa (102.0 kgf/cm2, 1450 psi) over a period of 5 to 20 seconds.
If there is a hissing sound of nitrogen gas leaking out when the SST (regulator assembly) valve is opened, close the SST (regulator assembly) valve, and after determining the location of the leak, replace the leaking component with a new one.
Even when it seems like the leaking sound is only coming from one location, it may be drowning out leaking sounds from other locations, so make sure to perform leakage point identification for all connecting portions.
| *1 | Auxiliary Battery |
| *a | Battery Charger |
Connect a battery charger to the auxiliary battery, and put the auxiliary battery into a charging state.
This is done to prevent the auxiliary battery from becoming discharged, as the tank shut valve of the hydrogen tank assembly will be forced to operate for 30 minutes.
Using the GTS, enter the following menus: Body Electrical / Power Source Control / Utility / Auto Power OFF Cancel
| Tester Display |
|---|
| Auto Power OFF Cancel |
Open the tank shut valves of the No. 1 hydrogen tank assembly, No. 2 hydrogen tank assembly and No. 3 hydrogen tank assembly.
If the Data List item "Medium-range Hydrogen Pressure (gauge)" decreases to below 0.7 kPa (7.1 kgf/cm2, 102 psi) the tank shut valves of the No. 1 hydrogen tank assembly, No. 2 hydrogen tank assembly and No. 3 hydrogen tank assembly will forcibly close.
If there is a hissing sound of nitrogen gas leaking out when the tank shut valves are opened, close both tank shut valves, and after determining the location of the leak, replace the leaking component with a new one.
Even when it seems like the leaking sound is only coming from one location, it may be drowning out leaking sounds from other locations, so make sure to perform leakage point identification for all connecting portions.
If the tank shut valves of the No. 1 hydrogen tank assembly, No. 2 hydrogen tank assembly and No. 3 hydrogen tank assembly do not open, open the tank shut valves again.
When the tank shut valve has been opened, if the pressure has gone below 10 MPa (102.0 kgf/cm2, 1450 psi), increase the pressure to 10 MPa (102.0 kgf/cm2, 1450 psi).
| *a | Close the Nitrogen Cylinder Valve |
Close the nitrogen cylinder valve.
| *a | SST (Regulator Assembly) |
| *b | Close the SST (Regulator Assembly) Valve |
Rotate the handle of SST (regulator assembly) in the counterclockwise direction to close the valve.
After closing the nitrogen cylinder valve and the SST (regulator assembly) valve, wait for 10 minutes to allow the pressure in the piping to stabilize.
When nitrogen has just been filled, the temperature inside the piping is increased, causing pressure to increase. Afterwards, when the temperature in the piping decreases, the pressure decreases. For this reason, pressure is not stable immediately after nitrogen filling.
After checking that the pressure gauge has stabilized, wait an additional 30 minutes, and then check the pressure gauge.
Pressure decrease is 0.2 MPa (2.0 kgf/cm2, 29 psi) or less
When the pressure decrease is 0.2 MPa (2.0 kgf/cm2, 29 psi) or less:
Go to "When pressure decrease is 0.2 MPa (2.0 kgf/cm2, 29 psi) or less"
When the pressure decrease is more than 0.2 MPa (2.0 kgf/cm2, 29 psi):
Go to "When pressure decrease is more than 0.2 MPa (2.0 kgf/cm2, 29 psi)
When pressure decrease is 0.2 MPa (2.0 kgf/cm2, 29 psi) or less:
| *a | SST (Port Assembly) |
| *b | Open the Discharge Valve of SST (Port Assembly) |
Slowly open the discharge valve of SST (port assembly) to depressurize the nitrogen gas.
Keep your hands and face away from the discharge port.
| *a | SST (Regulator Assembly) |
| *b | Open the SST (Regulator Assembly) Valve |
Slowly rotate the handle of SST (regulator assembly) a small amount in the clockwise direction to open the valve.
This is done to reduce the pressure of the nitrogen gas between the nitrogen cylinder and SST (regulator assembly).
| *a | SST (Port Assembly) |
| *b | Close the Injection Valve of SST (Port Assembly) |
Close the injection valve of SST (port assembly).
| *a | SST (Port Assembly) |
| *b | Close the Discharge Valve of SST (Port Assembly) |
Close the discharge valve of SST (port assembly).
Slowly loosen the No. 1 hydrogen supply regulator plug until the hissing sound of gas escaping can be heard, then stop loosening the No. 1 hydrogen supply regulator plug and wait for the sound to stop. Repeat this procedure multiple times until the sound stops occurring, in order to depressurize the nitrogen gas from the medium pressure leak check port of the hydrogen supply regulator.
When depressurizing the nitrogen gas, only loosen the No. 1 hydrogen supply regulator plug. Do not remove it.
Remove the No. 1 hydrogen supply regulator plug from the hydrogen supply regulator.
When frost has formed on the hydrogen tank assembly or piping, water droplets may be formed when the frost begins to melt. If water droplets enter the tank or piping, it could result in blockage of the hydrogen piping, so do not allow water droplets to enter the tank or piping.
Remove the O-ring from the hydrogen supply regulator.
| *a | Protective Tape |
To prevent damage to the seal portions and threaded portions, and to prevent foreign matter such as dust or metal fragments from entering the openings, cover the seal portions, threaded portions, and openings of the hydrogen supply regulator with protective tape.
To prevent damage to the seal portions and threaded portions, and to prevent foreign matter such as dust or metal fragments from entering the openings, do not remove the protective tape covering the seal portions, threaded portions, and openings of the hydrogen supply regulator until immediately before performing work.
When frost has formed on the hydrogen tank assembly or piping, water droplets may be formed when the frost begins to melt. If water droplets enter the tank or piping, it could result in blockage of the hydrogen piping, so do not allow water droplets to enter the tank or piping.
Apply TOYOTA Genuine FC Grease to a new O-ring and to the threaded portion of the hydrogen supply regulator.
Install the O-ring to the hydrogen supply regulator.
During installation, make sure not to damage the O-ring.
| *a | Torque Wrench Fulcrum Length |
Using SST install the No. 1 hydrogen supply regulator plug to the hydrogen supply regulator.
9.0 N*m (92 kgf*cm, 80 in.*lbf)
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using SST (fulcrum length of 40 mm (1.57 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)): 7.2 N*m (73 kgf*cm, 64 in.*lbf)
Close the tank shut valve of the No. 1 hydrogen tank assembly, No. 2 hydrogen tank assembly and No. 3 hydrogen tank assembly.
Disconnect the nitrogen cylinder and SST (10 MPa (102 kgf/cm2, 1450 psi) leak inspection tool) from the hydrogen inlet receptacle.
| *a | SST (Port Assembly) | *b | SST (Regulator Assembly) |
| *c | Nitrogen Cylinder | *d | SST (10 MPa (102 kgf/cm2, 1450 psi) Leak Inspection Tool) |
| *a | Manual Valve Closed |
| *b | Manual Valve Open |
| *c | Adjustment Bolt |
| *d | Counterclockwise |
Using an 8 mm socket hexagon wrench, rotate the adjustment bolt counterclockwise, and open the No. 1 hydrogen tank assembly manual valve.
The manual valve shuts off the pressure from the hydrogen tank assembly, so be careful not to damage the hexagonal portion.
If the hexagonal portion is damaged, it will be impossible to operate the adjustment bolt.
Do not rotate the adjustment bolt more than 4 rotations.
Rotating the adjustment bolt more than 4 rotations could damage the manual valve.
If the manual valve is damaged, it will be necessary to replace the No. 1 hydrogen tank assembly.
Before opening the manual valve, check that the nitrogen gas contained in the hydrogen piping has been depressurized.
| *a | Adjustment Bolt |
| *b | Protrusion |
When the manual valve is opened, the protrusion of the adjustment bolt is 3.5 mm (0.138 in.) or less.
| *a | Manual Valve Closed |
| *b | Manual Valve Open |
| *c | Adjustment Bolt |
| *d | Counterclockwise |
Using an 8 mm socket hexagon wrench, rotate the adjustment bolt counterclockwise, and open the No. 2 hydrogen tank assembly manual valve.
The manual valve shuts off the pressure from the hydrogen tank assembly, so be careful not to damage the hexagonal portion.
If the hexagonal portion is damaged, it will be impossible to operate the adjustment bolt.
Do not rotate the adjustment bolt more than 4 rotations.
Rotating the adjustment bolt more than 4 rotations could damage the manual valve.
If the manual valve is damaged, it will be necessary to replace the No. 2 hydrogen tank assembly.
| *a | Adjustment Bolt |
| *b | Protrusion |
When the manual valve is opened, the protrusion of the adjustment bolt is 3.5 mm (0.138 in.) or less.
| *a | Manual Valve Closed |
| *b | Manual Valve Open |
| *c | Adjustment Bolt |
| *d | Counterclockwise |
Using an 8 mm socket hexagon wrench, rotate the adjustment bolt counterclockwise, and open the No. 3 hydrogen tank assembly manual valve.
The manual valve shuts off the pressure from the hydrogen tank assembly, so be careful not to damage the hexagonal portion.
If the hexagonal portion is damaged, it will be impossible to operate the adjustment bolt.
Do not rotate the adjustment bolt more than 4 rotations.
Rotating the adjustment bolt more than 4 rotations could damage the manual valve.
If the manual valve is damaged, it will be necessary to replace the No. 3 hydrogen tank assembly.
| *a | Adjustment Bolt |
| *b | Protrusion |
When the manual valve is opened, the protrusion of the adjustment bolt is 3.5 mm (0.138 in.) or less.
After performing primary leak inspection and confirming that there are no leaks, check that compressed hydrogen gas can be filled without any problem at a hydrogen station.
When pressure decrease is more than 0.2 MPa (2.0 kgf/cm2, 29 psi):
Using soapy water, check the connection points to determine the locations of the leaks.
If the soapy water on the part connection points is difficult to see, use a mirror and a light.
| *a | FC Stack-side Leak Check Locations | - | - |
| *a | Hydrogen Tank-side Leak Check Locations | - | - |
| *a | Nitrogen Regulator-side Leak Check Locations | - | - |
| *a | SST (Port Assembly) |
| *b | Open the Discharge Valve of SST (Port Assembly) |
Slowly open the discharge valve of SST (port assembly) to depressurize the nitrogen gas.
Keep your hands and face away from the discharge port.
| *a | SST (Regulator Assembly) |
| *b | Open the SST (Regulator Assembly) Valve |
Slowly rotate the handle of SST (regulator assembly) a small amount in the clockwise direction to open the valve.
This is done to reduce the pressure of the nitrogen gas between the nitrogen cylinder and SST (regulator assembly).
| *a | SST (Port Assembly) |
| *b | Close the Injection Valve of SST (Port Assembly) |
Close the injection valve of SST (port assembly).
| *a | SST (Port Assembly) |
| *b | Close the Discharge Valve of SST (Port Assembly) |
Close the discharge valve of SST (port assembly).
Slowly loosen the No. 1 hydrogen supply regulator plug until the hissing sound of gas escaping can be heard, then stop loosening the No. 1 hydrogen supply regulator plug and wait for the sound to stop. Repeat this procedure multiple times until the sound stops occurring, in order to depressurize the nitrogen gas from the medium pressure leak check port of the hydrogen supply regulator.
When depressurizing the nitrogen gas, only loosen the No. 1 hydrogen supply regulator plug. Do not remove it.
Remove the No. 1 hydrogen supply regulator plug from the hydrogen supply regulator.
When frost has formed on the hydrogen tank assembly or piping, water droplets may be formed when the frost begins to melt. If water droplets enter the tank or piping, it could result in blockage of the hydrogen piping, so do not allow water droplets to enter the tank or piping.
Remove the O-ring from the hydrogen supply regulator.
| *a | Protective Tape |
To prevent damage to the seal portions and threaded portions, and to prevent foreign matter such as dust or metal fragments from entering the openings, cover the seal portions, threaded portions, and openings of the hydrogen supply regulator with protective tape.
To prevent damage to the seal portions and threaded portions, and to prevent foreign matter such as dust or metal fragments from entering the openings, do not remove the protective tape covering the seal portions, threaded portions, and openings of the hydrogen supply regulator until immediately before performing work.
When frost has formed on the hydrogen tank assembly or piping, water droplets may be formed when the frost begins to melt. If water droplets enter the tank or piping, it could result in blockage of the hydrogen piping, so do not allow water droplets to enter the tank or piping.
Apply TOYOTA Genuine FC Grease to a new O-ring and to the threaded portion of the hydrogen supply regulator.
Install the O-ring to the hydrogen supply regulator.
During installation, make sure not to damage the O-ring.
| *a | Torque Wrench Fulcrum Length |
Using SST install the No. 1 hydrogen supply regulator plug to the hydrogen supply regulator.
9.0 N*m (92 kgf*cm, 80 in.*lbf)
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using SST (fulcrum length of 40 mm (1.57 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)): 7.2 N*m (73 kgf*cm, 64 in.*lbf)
Close the tank shut valve of the No. 1 hydrogen tank assembly, No. 2 hydrogen tank assembly and No. 3 hydrogen tank assembly.
Disconnect the nitrogen cylinder and SST (10 MPa (102 kgf/cm2, 1450 psi) leak inspection tool) from the hydrogen inlet receptacle.
| *a | SST (Port Assembly) | *b | SST (Regulator Assembly) |
| *c | Nitrogen Cylinder | *d | SST (10 MPa (102 kgf/cm2, 1450 psi) Leak Inspection Tool) |
After replacing the leaking component with a new one, perform primary leak inspection again.
If there is a leak, check the O-ring for scratches or other damage.
If the O-ring is scratched or damaged, replace it with a new one and perform leak inspection again.
If there is still a leak after replacing the O-ring, replace the hydrogen inlet receptacle assembly with a new one and perform leak inspection again.
17DB3
15.INSTALL NO. 3 FC EXHAUST PIPE
16. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART
17. SECOND LEAK CHECK
58398F
18.INSTALL NO. 1 FLOOR UNDER COVER
57628E
19.INSTALL REAR FLOOR SIDE MEMBER COVER LH
58402K
20.INSTALL NO. 2 FLOOR BOARD SUB-ASSEMBLY
58403L
21.INSTALL REAR NO. 3 FLOOR BOARD SUB-ASSEMBLY
58404B
22.INSTALL REAR NO. 4 FLOOR BOARD SUB-ASSEMBLY
77AE2
23.CONNECT HYDROGEN INLET RECEPTACLE CAP