2005-2008 RAV4 · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jan 2007 – Jul 2007

Versions by build date: Nov 2005 – Dec 2006 Jan 2007 – Jul 2007 from Aug 2007


1. INSTALL ENGINE OIL LEVEL SENSOR

  1. A123531
    Install the level sensor with the 4 bolts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }


2. INSTALL EXHAUST MANIFOLD

  1. A111245E02
    Loosely install the 2 collars of the exhaust manifold with the nuts labeled A. Tighten the nuts until the contact surface of the exhaust manifold contacts with the cylinder head.

  1. Loosely install the 6 collars with the 6 nuts.

    HINT:
    1. When installing the collars, pay attention to the mounting orientation. Ring groove of the collar should be outside. Refer to the illustration.
    2. Tighten the nuts so that the position of the exhaust manifold can be adjusted in a later step.

  1. A123597
    Install a new gasket and the turbocharger with the 3 nuts.

    Torque:
    60 N*m{ 612 kgf*cm , 44 ft.*lbf }

  1. A116281
    Install the turbocharger stay with the 2 nuts and 2 spacers.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

    HINT:
    Do not reuse the turbocharger stay.

  1. Tighten the 8 nuts.

    Torque:
    47 N*m{ 479 kgf*cm , 35 ft.*lbf }


3. INSTALL NO. 2 TURBO OIL PIPE

A113484
  1. Tighten the turbo oil pipe with the 2 bolts.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. A113485
    Connect the 2 vacuum hoses.


4. INSTALL EGR COOLER ASSEMBLY

  1. A114901
    Temporarily assemble 2 new gaskets, the No. 2 EGR valve, No. 1 EGR pipe and EGR cooler with the 2 bolts and 2 nuts.

  1. Install a new O-ring to the EGR cooler.

  1. Install a new gasket to the No. 1 EGR pipe.

  1. Install a new gasket to the EGR cooler.

  1. A114995
    Temporarily install the EGR cooler with the 2 bolts and 2 nuts.

  1. Temporarily install the 4 bolts.

  1. A110788
    Tighten the 2 bolts and 2 nuts holding the EGR cooler to the cylinder block.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. A114900
    Tighten the 2 bolts holding the EGR cooler to the exhaust manifold.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. A114954
    Tighten the 2 bolts holding the EGR cooler to the cylinder head.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. A114904
    Tighten the 2 bolts and 2 nuts holding the EGR pipe to the EGR valve.

    Torque:
    21 N*m{ 241 kgf*cm , 15 ft.*lbf }

  1. A110787
    Connect the vacuum hose.


5. INSTALL TURBO OIL OUTLET PIPE

A113483
  1. Install 2 new gaskets and the oil pipe with the 4 bolts.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }


6. INSTALL NO. 5 WATER BY-PASS PIPE

7. INSTALL NO. 1 TURBO INSULATOR

A113478
  1. Install the insulator with the 2 bolts.

    Torque:
    20.5 N*m{ 209 kgf*cm , 15 ft.*lbf }


8. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

  1. A110789
    Temporarily install a new turbine outlet elbow gasket and exhaust manifold converter with the 3 nuts.

  1. A110768
    Temporarily install the No. 2 exhaust manifold stay with the 2 bolts and nut.

  1. A110790
    Temporarily install the No. 2 manifold stay with the 3 bolts.

  1. A110767
    Temporarily install the No. 1 manifold stay with the bolt and nut.

  1. A116310
    Tighten the 2 bolts of the No. 2 exhaust manifold stay to the cylinder block (Upper bolt → Lower bolt).

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. A110789
    Tighten the 3 nuts of the exhaust manifold converter to the turbocharger sub-assembly (While pushing manifold converter towards turbocharger sub-assembly).

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. A116309
    Tighten the nut of the No. 2 exhaust manifold stay to the exhaust manifold converter.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. A116307
    Tighten the bolt of the No. 2 manifold stay to the exhaust manifold converter.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

    HINT:
    Ensure stay pushed flush to cylinder block and manifold converter while tightening.

  1. A116308
    Tighten the 2 bolts of the No. 2 manifold stay to the cylinder block.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

  1. A114989
    Tighten the bolt of the No. 1 manifold stay to the cylinder head.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    HINT:
    Ensure stay pushed flush to cylinder head and manifold converter while tightening.

  1. A114988
    Tighten the nut of the No. 1 manifold stay to the exhaust manifold converter.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


9. INSTALL NO. 1 MANIFOLD CONVERTER INSULATOR

  1. A114857
    Install the No. 1 manifold converter insulator with the 5 bolts.

    Torque:
    29 N*m{ 291 kgf*cm , 21 ft.*lbf }


10. INSTALL DRIVE SHAFT BEARING BRACKET

  1. A129523
    Install the bearing bracket with the 3 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }


11. INSTALL GLOW PLUG ASSEMBLY

  1. A124901
    Install the 4 glow plugs.

    Torque:
    12.3 N*m{ 125 kgf*cm , 9 ft.*lbf }

  1. Install the glow plug connector with the 5 nuts.

    Torque:
    2.2 N*m{ 22 kgf*cm , 19 in.*lbf } for glow plug connector
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf } for wire harness

  1. Install the 5 grommets.


12. INSTALL WATER INLET HOUSING

  1. A111253
    Install a new gasket and the inlet housing with the 3 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the hose.

  1. Install a new O-ring and the by-pass pipe with the 2 bolts.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }


13. INSTALL NO. 1 OIL COOLER BRACKET

A123533E01
  1. Apply engine oil to 2 new O-rings.

    NOTICE:
    Do not apply engine oil to the O-ring labeled A.

  1. Install the 3 O-rings to the oil cooler bracket.

  1. A116610E01
    Install the oil cooler bracket with the 6 bolts and nut.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }

    HINT:
    Each bolt length is indicated below.

    Bolt length:
    36 mm (1.42 in.) for bolt A
    49 mm (1.93 in.) for except bolt A


14. INSTALL NO. 1 TURBO OIL PIPE

  1. A111251E01
    Install the oil pipe and 2 new gaskets with the 2 union bolts.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    HINT:
    Be sure to install the union bolt A so that the gasket is positioned as shown in the illustration.


15. INSTALL NO. 3 WATER BY-PASS PIPE

  1. A111249
    Install a new O-ring and the by-pass pipe with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


16. INSTALL DIESEL ENGINE COOLANT TEMPERATURE SENSOR

  1. A111258
    Install a new gasket and the sensor.

    Torque:
    19.6 N*m{ 200 kgf*cm , 14 ft.*lbf }


17. INSTALL OIL COOLER

  1. A111248
    Install 3 new O-rings and the oil cooler with the 5 bolts.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }

  1. Install the by-pass hose and position the 2 clips.

  1. Connect the oil pressure switch connector.


18. INSTALL INTAKE MANIFOLD

  1. A111247
    Install a new gasket and the intake manifold with the 7 bolts and 2 nuts.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }


19. INSTALL DIESEL THROTTLE BODY

  1. A124890
    Install a new gasket and the diesel throttle body with the 2 nuts and 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the throttle position sensor connector.

  1. Connect the throttle motor connector.


20. INSTALL INJECTOR ASSEMBLY
  1. Install the injector (Click here).


21. INSTALL COMMON RAIL ASSEMBLY
  1. Install the common rail (Click here).


22. INSTALL ENGINE COVER BRACKET

  1. A123585
    Install the cover bracket with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Install the pressure sensor with the bolt.

    Torque:
    8.8 N*m{ 90 kgf*cm , 78 in.*lbf }


23. INSTALL EGR VALVE ASSEMBLY

  1. A126857
    Install a new gasket and the EGR valve with the 2 bolts.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. Connect the EGR valve connector.


24. INSTALL NO. 2 EGR PIPE SUB-ASSEMBLY

  1. A126858
    Temporarily install 2 new gaskets and the EGR pipe with the nut and bolt.

  1. A126859
    Temporarily install the bolt and nut.

  1. A114873
    Tighten the 2 bolts holding the EGR pipe to the cylinder head.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. A110765
    Tighten the 2 nuts holding the EGR pipe to the EGR valve.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }


25. INSTALL OIL DIPSTICK GUIDE
  1. Install a new O-ring to the dipstick guide.

  1. A123608
    Install the dipstick guide with the 2 bolts.

    Torque:
    33 N*m{ 337 kgf*cm , 24 ft.*lbf }


26. INSTALL INJECTION OR SUPPLY PUMP ASSEMBLY
  1. Install the supply pump (Click here).


27. INSTALL VACUUM PUMP ASSEMBLY

  1. C128548E01
    Apply engine oil to the oil pipe at the tip of the vacuum pump.

  1. Coat 2 new O-rings with engine oil, and install them to the vacuum pump.

  1. C128549E01
    Install the vacuum pump so that the coupling teeth of the vacuum pump (labeled A) and the groove of the camshaft (labeled B) can engage.

  1. C128547
    Install 3 new flange bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 vacuum hoses.


28. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  1. A123607
    Install the tensioner with the 3 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


29. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET
  1. Set the mounting bracket.

  1. A123586E01
    Temporarily tighten the 2 bolts (B) and 2 nuts.

  1. Tighten the 2 bolts (A).

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf } for bolt A

  1. Tighten the 2 bolts (B) and 2 nuts.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf } for bolt B, nut


30. INSTALL NO. 1 IDLER PULLEY ASSEMBLY

  1. A123584
    Install the idler pulley with the bolt.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

  1. Install the idler pulley cover plate.


31. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

  1. A126838
    Install the idler pulley with the bolt.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }


32. INSTALL GENERATOR ASSEMBLY

  1. A127719
    Install the generator with the 3 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Be careful that the wire harness of the crankshaft position sensor does not get caught between the cylinder block and generator when installing the generator.

  1. Connect the generator wire with the nut and bolt.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf } for nut
    7.7 N*m{ 79 kgf*cm , 68 in.*lbf } for bolt

  1. Install the terminal cap.

  1. Connect the generator connector.


33. INSTALL COMPRESSOR WITH PULLEY ASSEMBLY

  1. E126953E02
    w/o Stud Bolt:
    Install the cooler compressor with the 4 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Tighten the bolts in the order shown in the illustration to install the cooler compressor.

  1. w/ Stud Bolt:
    Install the cooler compressor with the 3 bolts and nut.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Tighten the bolts in the order shown in the illustration to install the cooler compressor.

  1. Connect the connector.


34. INSTALL FAN AND GENERATOR V BELT

  1. A123517E02
    Using SST and 22 mm wrench, rotate the tensioner pulley counterclockwise, and then install the V-ribbed belt.
    SST
    09216-42010  

    NOTICE:
    1. Make sure that the V-ribbed belt is set properly at each pulley.
    2. Make sure SST is installed as shown in the illustration. If not, SST and/or the V-ribbed belt may not be able to be removed.


35. REMOVE ENGINE STAND
  1. Install a sling device and chain block.

  1. Remove the engine stand.


36. INSTALL FLYWHEEL SUB-ASSEMBLY

  1. A111238E01
    Hold the crankshaft with SST.
    SST
    09213-58013  
    09330-00021  

  1. A111255E01
    Using several steps, install and tighten 8 new bolts with a T55 "torx" socket wrench uniformly in the sequence shown in the illustration.

    HINT:
    1. Do not reuse the flywheel installation bolts.
    2. Be sure to check the tightening torque within 5 minutes after tightening.
    3. Do not impact or damage the flywheel installation bolts. Be sure to handle them carefully.
    4. Make sure that the seating surface of the flywheel installation bolts and the installation surfaces of the crankshaft and flywheel are free from oil or foreign matter.

    Torque:
    70.5 N*m{ 719 kgf*cm , 52 ft.*lbf }


37. INSTALL CLUTCH DISC ASSEMBLY

  1. C116730E01
    Insert SST into the clutch disc, and then insert them into the flywheel.
    SST
    09301-00310  

    NOTICE:
    Do not insert the clutch disc in the wrong direction.


38. INSTALL CLUTCH COVER ASSEMBLY

  1. C116732E02
    Align the matchmarks on the clutch cover with the one on the flywheel.

  1. Tighten the 6 bolts uniformly in the order shown in the illustration, starting with the bolt located near the knock pin on the top.

    Torque:
    19 N*m{ 195 kgf*cm , 14 ft.*lbf }

    NOTICE:
    1. Following the order in the illustration, make sure to uniformly tighten the bolts 180°.
    2. After checking that the disc is in the center, gently move SST up and down, and right and left to tighten the bolts.


39. INSTALL MANUAL TRANSAXLE ASSEMBLY

C116719E02
  1. Align the input shaft with the clutch disc and install the transaxle to the engine.

  1. Install the 10 bolts.

    Torque:
    46 N*m{ 469 kgf*cm , 34 ft.*lbf } for bolt A
    64 N*m{ 653 kgf*cm , 47 ft.*lbf } for bolt B


40. INSTALL STIFFENER PLATE LH

C127240
  1. Install the stiffener plate with the 4 bolts.

    Torque:
    46 N*m{ 469 kgf*cm , 34 ft.*lbf }


41. INSTALL STIFFENER PLATE RH

C127241
  1. Install the stiffener plate with the 4 bolts.

    Torque:
    46 N*m{ 469 kgf*cm , 34 ft.*lbf }


42. INSTALL OIL PAN INSULATOR

43. INSTALL STARTER ASSEMBLY

  1. A163979
    Install the starter with the 2 bolts.

    Torque:
    64 N*m{ 652 kgf*cm , 47 ft.*lbf }

  1. A163980
    Install the starter wire and nut with the terminal cap.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the starter connector.


44. INSTALL ENGINE WIRE
  1. Install the engine wire to the engine.


45. INSTALL NO. 1 AIR TUBE

  1. A124905
    Install the No.1 air tube with the 2 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

  1. Tighten the 2 clamps.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

  1. A124904
    Install the wire harness with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


46. INSTALL FRONT SUSPENSION CROSSMEMBER SUB-ASSEMBLY
  1. Attach the engine together with the transaxle to the suspension crossmember and mounting.

  1. A123582
    Install the bolt which secures the engine mounting bracket to the mounting insulator.

    Torque:
    95 N*m{ 969 kgf*cm , 70 ft.*lbf }


47. INSTALL FRONT CROSS MEMBER SUB-ASSEMBLY

  1. A123581
    Install the bolt and nut which secures the engine mounting bracket to the mounting insulator.

    Torque:
    145 N*m{ 1,479 kgf*cm , 107 ft.*lbf }


48. INSTALL ENGINE WITH TRANSAXLE
  1. Place the engine on an engine lifter.

    HINT:
    Place the engine on wooden blocks or equivalent so that the engine is level.

  1. Using the chain block, slowly install the engine to the vehicle and the intermediate shaft to the pinion.

    CAUTION:
    Do not raise the engine more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.

    NOTICE:
    1. Make sure that the engine is clear of all wiring and hoses.
    2. While raising the engine into the vehicle, do not allow it to contact the vehicle.
    3. Align the matchmarks on the intermediate shaft and pinion.

  1. A123580
    Temporarily install the suspension member, crossmember with the 10 bolts.

  1. Temporarily install the member brace rear RH and LH with the 6 bolts.

  1. A123579
    Install the engine mounting insulator LH with the bolt and nut.

    Torque:
    56 N*m{ 571 kgf*cm , 41 ft.*lbf }

    NOTICE:
    While holding the bolt in place, tighten the nut.

  1. A123578
    Install the engine mounting insulator RH with the 2 bolts and 2 nuts.

    Torque:
    95 N*m{ 969 kgf*cm , 70 ft.*lbf } for bolt, nut A
    52 N*m{ 530 kgf*cm , 38 ft.*lbf } for nut

  1. A123580E01
    Tighten the suspension member and crossmember's bolts.

    Torque:
    96 N*m{ 979 kgf*cm , 71 ft.*lbf } for bolt A
    145 N*m{ 1,478 kgf*cm , 107 ft.*lbf } for bolt B

  1. Tighten the member brace rear's bolts.

    Torque:
    145 N*m{ 1,478 kgf*cm , 107 ft.*lbf } for bolt C
    93 N*m{ 948 kgf*cm , 69 ft.*lbf } for bolt D

  1. Remove the sling device and chain block.

  1. Remove the 2 bolts and No. 1 and No. 2 engine hangers.


49. INSTALL FRONT DRIVE SHAFT LH
  1. Install the drive shaft (Click here).


50. INSTALL FRONT DRIVE SHAFT RH
  1. Install the drive shaft (Click here).


51. CONNECT TIE ROD END SUB-ASSEMBLY LH

  1. F040050E20
    Screw the lock nut and tie rod end sub-assembly LH on the rack end until the matchmarks are aligned and temporarily tighten the lock nut.

    HINT:
    Fully tighten the lock nut after adjusting toe-in.


52. CONNECT TIE ROD END SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the tie rod end sub-assembly LH.


53. CONNECT STEERING INTERMEDIATE SHAFT

C132129E02
  1. Align the matchmarks and install the intermediate shaft onto the steering gear.

    Torque:
    35 N*m{ 360 kgf*cm , 26 ft.*lbf }


54. CONNECT FRONT STABILIZER LINK ASSEMBLY LH
  1. Install the link with the 2 nuts.

    Torque:
    74 N*m{ 755 kgf*cm , 55 ft.*lbf }


55. CONNECT FRONT STABILIZER LINK ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.


56. INSTALL FRONT AXLE HUB NUT LH
  1. Install a new hub nut.

    Torque:
    216 N*m{ 2,203 kgf*cm , 159 ft.*lbf } for φ 26
    292 N*m{ 2,978 kgf*cm , 215 ft.*lbf } for φ 30

  1. C129484
    Using a chisel and hammer, stake the hub nut.


57. INSTALL FRONT AXLE HUB NUT RH

58. INSTALL FRONT WHEELS

59. INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY

  1. C127526E01
    Align the matchmarks of the transfer and propeller shaft.

  1. Temporarily install the propeller shaft with center bearing with the 4 nuts and 4 washers.

  1. C127525E01
    Align the matchmarks of the differential carrier and propeller shaft.

  1. Temporarily install the propeller shaft with center bearing with the 4 bolts and 4 washers.

  1. C127524
    Temporarily install the center support bearing and center support bearing washer with the 2 bolts.


60. INSTALL FRONT EXHAUST PIPE ASSEMBLY

  1. A077857E03
    Using a vernier caliper, measure the free length of the compression spring.

    Minimum length:
    41.5 mm (1.634 in.)

    If the length is less than the minimum, replace the compression spring.

  1. A133205E01
    Install a new gasket by hand so that its surface is flush with the center exhaust manifold.

    NOTICE:
    1. Make sure the gasket is facing the correct direction.
    2. Do not reuse the removed gasket.
    3. Do not push in the gasket while installing the exhaust pipe.

  1. Connect the 3 exhaust pipe supports, and install the front exhaust pipe.

  1. Install the 2 compression springs and 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }


    A126833


61. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY

  1. A123605
    Connect the release cylinder and flexible hose bracket with the 5 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


62. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

C127242
  1. Install the control cable with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. C127238E02
    Connect the control cable to the control cable bracket, and install 2 new clips.

  1. Connect the control cable to the transaxle, and install the 2 washers and 2 clips.


63. CONNECT SUCTION HOSE SUB-ASSEMBLY

  1. H102041
    Remove the attached vinyl tape from the hose.

  1. Sufficiently apply compressor oil to a new O-ring and the fitting surface of the cooler compressor.

    Compressor oil:
    ND-OIL 8 or equivalent

  1. Install the O-ring on the cooler refrigerant suction hose.

  1. Install the cooler refrigerant suction hose on the cooler compressor with the bolt.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }


64. INSTALL DISCHARGE HOSE SUB-ASSEMBLY

  1. A129522
    Install the discharge hose for compressor with the bolt.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }


65. INSTALL RADIATOR AND INTERCOOLER

NOTICE:
When reusing the air hose or air tube, check that there is no damage and foreign objects. If necessary, clean it.

  1. A123563E01
    Align the intercooler with the radiator, and then install the intercooler to the radiator with the 4 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Install the No. 2 air tube to the intercooler and No. 3 air hose.

  1. Install the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A123567E01
    Tighten the 2 clamps as shown in the illustration.

  1. A123568E01
    Install the No. 2 air hose to the intercooler. Tighten the clamp as shown in the illustration.

  1. Install the radiator (with intercooler) to the vehicle.

  1. Connect the No. 2 and No. 3 air hoses to the engine.

  1. A123564E01
    Tighten the 2 clamps as shown in the illustration.


66. CONNECT OUTLET RADIATOR HOSE

A127742
  1. Install the outlet radiator hose to the radiator.

  1. A127748E01
    Position the clip as illustrated.


67. CONNECT INLET RADIATOR HOSE

A127743E01
  1. Install the inlet radiator hose and No. 5 water by-pass hose to the radiator.

  1. A128580E01
    Position clips A and B as illustrated.


68. INSTALL RADIATOR SUPPORT UPPER

A127758
  1. Install the radiator support upper with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


69. INSTALL HOOD LOCK ASSEMBLY

  1. B127322
    Install the hood lock striker with the 3 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


70. INSTALL COOLER CONDENSER ASSEMBLY

  1. E126558
    Install the cooler condenser.


71. INSTALL RADIATOR SUPPORT UPPER BRACKET

E126555
  1. Install the 2 brackets with the 2 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


72. INSTALL FRONT BUMPER REINFORCEMENT SUB-ASSEMBLY UPPER
  1. Install the reinforcement and install the 2 bolt.

  1. Connect the 2 horns connectors.


73. INSTALL FRONT BUMPER
  1. Install the front bumper (Click here).


74. INSTALL RADIATOR RESERVE TANK ASSEMBLY

  1. A124930
    Install the reservoir with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


75. INSTALL ECM

  1. A124573
    Install the 2 ECM brackets with the 4 screws.

    Torque:
    3.0 N*m{ 30 kgf*cm , 27 in.*lbf }

  1. A124572
    Connect the 2 ECM connectors.

    1. Connect the 2 connectors to the ECM and lower the 2 levers.

      NOTICE:
      Make sure that the 2 levers are securely lowered.

  1. A124570
    Install the ECM with the 3 bolts.

    Torque:
    6.5 N*m{ 66 kgf*cm , 57 in.*lbf }


76. CONNECT HOSES AND CONNECTORS
  1. Install the vacuum switching valve bracket and vacuum transmitting pipe with the 3 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 ECM connectors.

  1. Connect the 2 heater hoses.

  1. Connect the 2 fuel hoses.

  1. Connect the vacuum pump hose.

  1. Connect the 2 injector driver connectors.

  1. Connect the starter wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }

  1. Connect the 3 connectors and wire with the nut.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the engine room junction block cover (upper).


77. INSTALL AIR CLEANER BRACKET

  1. A124934
    Install the bracket with the 3 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 2 fuel hoses to the bracket.

  1. Connect the 2 wire harness clamps.

  1. A124933
    Install the glow plug relay and connect the fuel filter level switch connector.


78. INSTALL FUEL FILTER ASSEMBLY
  1. Install the fuel filter with the bolt.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }

  1. Connect the 4 hoses.

  1. Connect the level warning switch connector.

    A125342


79. INSTALL AIR CLEANER CASE

  1. A129328
    Install the air cleaner case with the 3 bolts and connect the wire harness clamp.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the air cleaner element.


80. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  1. A124929E02
    Insert the hinge parts of the air cleaner cap into the air cleaner case, and then hang the 3 hook clamps.

  1. Connect the mass air flow meter connector.

  1. Connect the wire harness clamp.


81. INSTALL BATTERY BRACKET REINFORCEMENT

  1. A124919
    Install the bracket reinforcement with the 2 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


82. INSTALL FRONT BATTERY BRACKET

  1. A124918
    Install the front bracket with the 4 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Attach the 2 wire harness clamps.


83. INSTALL BATTERY

84. REMOVE BATTERY CLAMP SUB-ASSEMBLY

  1. A124917E01
    Attach the hook of the battery clamp to the front battery bracket.

  1. Temporarily tighten the nut and install the bolt.

  1. Adjust the battery clamp's position.

  1. Fully tighten the nut and bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Attach the 2 wire harness clamps.


85. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

86. INSTALL HOOD SUB-ASSEMBLY

B127320E01
  1. Install the hood with the 4 bolts.

    Torque:
    13.0 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Adjust the hood position (Click here).


87. ADD MANUAL TRANSAXLE OIL

88. ADD TRANSFER OIL

89. ADD ENGINE OIL
  1. Wipe the oil pan and drain plug before installing the plug.

  1. Install a new gasket and the oil pan drain plug.

    Torque:
    38 N*m{ 387 kgf*cm , 28 ft.*lbf }

  1. A123522
    Close the oil pan drain service cover and install the clip.

  1. Add new oil.

    Standard oil capacity:
    Item
    Specified Condition
    Drain and refill with oil filter change
    5.9 liters ( 6.2 US qts, 5.2 Imp. qts)
    Drain and refill without oil filter change
    5.5 liters ( 5.8 US qts, 4.8 Imp. qts)
    Dry fill
    6.7 liters ( 7.1 US qts, 5.9 Imp. qts)

  1. Install the oil filler cap.


90. ADD ENGINE COOLANT
  1. Tighten the radiator drain cock plug by hand.

  1. Tighten the cylinder block drain cock plug.

    Torque:
    12.7 N*m{ 130 kgf*cm , 10 ft.*lbf }

  1. Add TOYOTA Super Long Life Coolant (SLLC) to the radiator reservoir filler opening.

  1. A126841E01
    Continue adding TOYOTA SLLC until it is filled to the B line.

    HINT:
    The B line is the lower edge of the inner wall of the filler neck.

    Standard capacity:
    Item
    Specified Condition
    w/o Combustion Type Power Heater
    7.3 liters
    (7.7 US qts, 6.4 Imp. qts)
    w/ Combustion Type Power Heater
    7.7 liters
    (8.1 US qts, 6.8 Imp. qts)

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

    NOTICE:
    Never use water as a substitute for engine coolant.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level drops below the B line, add TOYOTA SLLC to the B line.

  1. Install the radiator reservoir cap.

  1. Start the engine, and warm it up until the cooling fan operates.

    1. Set the air conditioning as follows while warming up the engine.

      Item
      Specified Condition
      Manual Air Conditioning System
      Fan speed - Any setting except "OFF"
      Temperature - Toward WARM
      Air conditioning switch "OFF"
      Automatic Air Conditioning System
      Temperature - Toward MAX
      Air conditioning switch "OFF"

    2. Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.

      NOTICE:
      1. Make sure that the radiator reservoir still has some coolant in it.
      2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
      3. If there is not enough coolant, the engine may burn out or overheat.
      4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the B line.
      5. Until the coolant level has stabilized, run the engine at 2,000 rpm.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    When pressing the radiator hoses:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the radiator fan.

  1. Stop the engine and wait until the coolant cools down to ambient temperature.

  1. A126840
    Check that the coolant level is between the FULL and LOW line.
    If the coolant level is below the LOW line, repeat all of the procedures above.
    If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW line.


91. BLEED AIR FROM FUEL SYSTEM

  1. A130544
    Using the hand pump, bleed air from the fuel system until pumping becomes difficult.


92. REGISTRATION OF INJECTOR COMPENSATION CODE
  1. Register injector compensation code (Click here).


93. INSPECT ENGINE OIL LEAKS
  1. Start the engine. Make sure that no oil leaks from the connection point of the oil filter cap assembly.


94. INSPECT ENGINE COOLANT LEAKS
  1. Remove the radiator reservoir cap.

    CAUTION:
    To avoid the danger of being burned, do not remove the radiator reservoir cap while the engine and radiator are still hot. Thermal expansion will cause hot engine coolant and steam to blow out from the radiator.

  1. A128571E01
    Fill the radiator with coolant, and then attach a radiator cap tester.

  1. Warm up the engine.

  1. Pump the radiator cap tester to 137 kPa (1.4 kgf/cm2, 19 psi), and then check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leakage.
    If there are no signs of external coolant leaks, check the heater core, cylinder block and head.

  1. Reinstall the radiator cap.


95. INSPECT FUEL LEAKS

  1. B127990E01
    Perform the ACTIVE TEST.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch on (IG).

    3. Turn the intelligent tester ON.

    4. Enter the following menus: Powertrain / Engine / Active Test.

    5. Perform the Active Test.

      Intelligent Tester Display
      Test Details
      Control Range
      Diagnostic Notes
      Test the Fuel Leak
      Pressurizing common rail internal fuel pressure, and checking for fuel leaks
      Stop/Start
      1. Fuel pressure inside common rail pressurized to specified value and engine speed increased to 2,000 rpm when Start is selected
      2. Above conditions to be maintained while test is Start


96. INSPECT EXHAUST GAS LEAKS

97. ADJUST TRANSMISSION CONTROL CABLE

HINT:
  1. After the shift lever or the shift cable is replaced, be sure to adjust the transmission control cable assembly.
  2. If the shift lever does not move (or the shift lever is difficult to move) to the 1st or 2nd position, or if it is possible to move the shift lever to the reverse position without pulling up the slider shaft, the length of the cable must be adjusted.

  1. C133959E02
    To release the lock (lock condition to lock release condition).

    HINT:
    While holding the shift lever in the reverse direction, lock the cable length adjustment mechanism of the select cable.

  1. C116736E02
    Pressing the shift and select lever shaft (*1) and pin (*2), push in pin (*3) and check that the shift and select lever shaft is secured at the 1st-2nd gear selected position (the shaft comes to a stop at the position 8 mm (0.31 in.) below the N position).

    1. Remove the stopper pin, release the lock, and reinsert the stopper pin.

  1. C127226E02
    Turn the shift lever in the reverse direction without pulling up the slider shaft.

  1. C133959E02
    While holding the shift lever in the reverse direction, lock the cable length adjustment mechanism of the select cable.

  1. C116736E01
    Release the pin that fixes the transmission outer lever.

    1. Pull the pin toward the left front side of the vehicle.

  1. C136703E01
    for new shift lever:
    Remove the stopper pin and dispose of it.


98. INSTALL FRONT FLOOR COVER

  1. A130273
    Install the floor cover with the 3 clips, bolt and nut.


99. INSTALL NO. 2 ENGINE UNDER COVER
  1. Install the under cover with the 2 clips.


100. INSTALL ENGINE UNDER COVER REAR LH
  1. Install the under cover with the 2 clips.


101. INSTALL ENGINE UNDER COVER REAR RH
  1. Install the under cover with the 2 clips.


102. INSTALL NO. 1 ENGINE UNDER COVER
  1. Install the under cover with the 4 bolts and 12 clips.


103. INSTALL NO. 1 ENGINE COVER

  1. A123518
    Attach the 4 clips to install the engine cover.


104. INSTALL RADIATOR SUPPORT OPENING COVER

  1. B130259
    Install the 2 clips.


105. ADJUST FRONT WHEEL ALIGNMENT
  1. Adjust the front wheel alignment (Click here).


106. INSPECT IDLE SPEED

NOTICE:
When checking the idle speed, shift the transmission to the neutral position.

HINT:
  1. For more information about the intelligent tester, refer to its operator's manual.
  2. If an intelligent tester is not available, use a tachometer's tester probe as a substitute.

  1. Warm up and stop the engine.

  1. B127990E06
    Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch on (IG).

  1. Select the item:
    Powertrain / Engine / Data List / Engine SPD.

    HINT:
    Refer to the intelligent tester operator's manual if you need help to select Data List.

  1. Inspect the engine idle speed.

    HINT:
    1. Turn all the electrical system and the A/C OFF.
    2. Inspect the engine idle speed with the cooling fan OFF.

    Standard idle speed:
    750 to 850 rpm

  1. Turn the ignition switch off.

  1. Disconnect the intelligent tester from the DLC3.


107. INSPECT MAXIMUM ENGINE SPEED
  1. Start the engine.

  1. Depress the accelerator pedal to the limit.

  1. Check the maximum engine speed.

    Maximum engine speed:
    5,100 to 5,250 rpm

← INSTALLATION (Nov 2005 – Dec 2006)INSTALLATION (from Aug 2007) →