16322
1.INSTALL WATER INLET PIPE
Apply soapy water to 2 new O-rings and install them to the water inlet pipe.
Install the water inlet pipe to the No. 1 heat exchanger cover.
11302
2.INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
Apply a light coat of engine oil to a new oil pump gasket.
Install the oil pump gasket to the cylinder block.
Apply a light coat of engine oil to a new O-ring.
Install the O-ring to the oil pan sub-assembly.
Apply seal packing in a continuous line to the timing chain cover sub-assembly as shown in the following illustration.
| *a | Continuous Line Area | *b | Dashed Line Area |
| *c | Diagonal Line Area | - | - |
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
| Area | Seal Packing Diameter | Application Position from Inside Edge of Cover |
|---|---|---|
| Continuous line area | 3.0 to 4.0 mm (0.118 to 0.157 in.) | 2.5 mm (0.0984 in.) |
| Dashed line area | 6.4 mm (0.252 in.) or more, or within OK area shown in illustration | 7.0 mm (0.276 in.) |
| Diagonal line area | 3.0 to 4.0 mm (0.118 to 0.157 in.) | 5.5 mm (0.217 in.) |
| *a | Seal Packing Thickness |
| *b | Seal Packing Width |
| *c | OK Area |
When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
Install the timing chain cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
Do not start the engine for at least 2 hours after installing.
Align the oil pump drive rotor spline and crankshaft as shown in the illustration. Install the spline and timing chain cover sub-assembly to the crankshaft.
Temporarily install the timing chain cover with the 28 bolts and nut.
| Item | Length | Thread Diameter |
|---|---|---|
| Bolt A | 25 mm (0.984 in.) | 8 mm (0.315 in.) |
| Bolt B | 55 mm (2.17 in.) | 8 mm (0.315 in.) |
| Bolt C | 70 mm (2.76 in.) | 8 mm (0.315 in.) |
| Bolt D | 35 mm (1.38 in.) | 10 mm (0.394 in.) |
| Bolt E | 55 mm (2.17 in.) | 10 mm (0.394 in.) |
| Bolt F | 80 mm (3.15 in.) | 10 mm (0.394 in.) |
| *1 | Nut |
Make sure that there is no oil on the bolt threads.
Tighten the 3 bolts in several steps in the sequence shown in the illustration.
Temporarily install the fluid coupling bracket with the 4 bolts.
| Item | Length | Thread Diameter |
|---|---|---|
| Bolt A | 70 mm (2.76 in.) | 8 mm (0.315 in.) |
| Bolt B | 80 mm (3.15 in.) | 10 mm (0.394 in.) |
Temporarily install the V-ribbed belt tensioner assembly with the standard bolt and 6 mm hexagon wrench bolt.
Tighten the 8 bolts labeled 4 to 11 in several steps in the sequence shown in the illustration.
Tighten the 23 bolts and nut labeled 12 to 35 in several steps in the sequence shown in the illustration.
After the installation, if the seal packing has seeped out at the areas labeled A shown in the illustration, wipe it off.
11202
3.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
Install 5 new O-rings to the No. 2 camshaft bearing cap and No. 3 camshaft bearing cap.
Install the gasket to the cylinder head cover sub-assembly LH.
Remove any oil from the contact surface.
Apply seal packing as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
|
Seal Packing |
Remove any oil from the contact surface.
Install the cylinder head cover sub-assembly LH within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
Install the cylinder head cover sub-assembly LH washer with a new seal and the 14 bolts.
Do not start the engine for at least 2 hours after the installation.
11201
4.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
Install 5 new O-rings to the No. 1 camshaft bearing cap and No. 3 camshaft bearing cap.
Install the gasket to the cylinder head cover sub-assembly.
Remove any oil from the contact surface.
Apply seal packing as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
|
Seal Packing |
Remove any oil from the contact surface.
Install the cylinder head cover sub-assembly within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
Install the cylinder head cover sub-assembly washer with a new seal and the 14 bolts.
Do not start the engine for at least 2 hours after the installation.
19500
5.INSTALL IGNITION COIL ASSEMBLY
13521A
6.INSTALL CRANKSHAFT TIMING GEAR KEY
Install the crankshaft timing gear key to the crankshaft.
13471
7.INSTALL CRANKSHAFT PULLEY
8.CONNECT WIRE HARNESS CLAMP BRACKET
Connect the wire harness clamp bracket to the timing chain cover sub-assembly with the bolt.
16603
9.INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Install the No. 1 idler pulley sub-assembly with the bolt.
16173
10.INSTALL WATER PUMP PULLEY
16323
11.INSTALL WATER INLET HOUSING
17303
12.INSTALL AIR PIPE SUB-ASSEMBLY
Connect the 2 hoses.
Install the air pipe sub-assembly with the bolt.
12611
13.INSTALL NO. 1 ENGINE COVER
11212
14.INSTALL NO. 2 CYLINDER HEAD COVER
16355
15.INSTALL FRONT WATER BY-PASS JOINT
Install 2 new gaskets and the front water by-pass joint with the 4 nuts to the cylinder head.
Connect the No. 2 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
16.CONNECT NO. 10 WATER BY-PASS HOSE
Connect the No. 10 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
| *1 | No. 9 Water By-pass Hose |
| *2 | No. 10 Water By-pass Hose |
| *a | Paint Mark (Orange) |
| *b | Paint Mark (Yellow) |
17.CONNECT NO. 9 WATER BY-PASS HOSE
Connect the No. 9 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
16268
18.INSTALL NO. 1 WATER BY-PASS PIPE
Install the No. 1 water by-pass pipe with the 2 bolts.
16206
19.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Connect the No. 2 water by-pass hose and No. 3 water by-pass hose to the water by-pass pipe sub-assembly, and slide the 2 clamps to secure the hoses.
Install the water by-pass pipe sub-assembly with the 2 bolts.
17303
20.INSTALL AIR PIPE SUB-ASSEMBLY
16261G
21.INSTALL NO. 1 WATER BY-PASS HOSE
Connect the No. 1 water by-pass hose to the water inlet housing and front water by-pass joint, and slide the 2 clamps to secure the hoses.
27020
22.INSTALL GENERATOR ASSEMBLY
11452
23.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
24.INSTALL ENGINE OIL COOLER
15671
25.INSTALL OIL FILTER BRACKET
83520
26.INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY
27.INSTALL OIL FILTER ELEMENT
23902
28.INSTALL NO. 2 FUEL TUBE SUB-ASSEMBLY
Connect the No. 2 fuel tube sub-assembly with the 2 bolts.
88320
29.INSTALL COOLER COMPRESSOR ASSEMBLY
Install the cooler compressor assembly with the 2 stud bolts.
Install the 2 bolts and 2 nuts.
Tighten the bolts and nuts in the order shown in the illustration to install the cooler compressor assembly.
17342
30.CONNECT NO. 2 AIR INJECTION SYSTEM HOSE
17343
31.CONNECT NO. 3 AIR INJECTION SYSTEM HOSE
17111
32.INSTALL INTAKE MANIFOLD
82122
33.INSTALL NO. 2 ENGINE WIRE
82121
34.INSTALL ENGINE WIRE
87246C
35.CONNECT OUTLET HEATER WATER HOSE C
Connect the outlet heater water hose C to the No. 1 water by-pass pipe, and slide the clamp to secure the hose.
| *a | RR |
| *b | LH |
| *c | 45° |
Install the outlet heater water hose C so that the direction of the hose clamp is as indicated in the illustration.
87245C
36.CONNECT INLET HEATER WATER HOSE C
Connect the inlet heater water hose C to the water by-pass pipe sub-assembly, and slide the clamp to secure the hose.
| *a | RR |
| *b | LH |
| *c | 45° |
Install the inlet heater water hose C so that the direction of the hose clamp is as indicated in the illustration.
17880
37.INSTALL AIR CLEANER HOSE ASSEMBLY
38.INSTALL AIR CLEANER ASSEMBLY
16400
39.INSTALL RADIATOR ASSEMBLY
41.INSPECT FOR OIL LEAK
42.CHECK ENGINE OIL LEVEL