Home › Engine / Hybrid System › B58 (INTAKE / EXHAUST) › TURBOCHARGER › from 2020.03
RM3650E _51 Engine / Hybrid System _080024 B58 INTAKE / EXHAUST _0388138 TURBOCHARGER A

B58 INTAKE / EXHAUST  TURBOCHARGER  INSTALLATION  


PROCEDURE

Hide 16027 1.INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY (for 2 Port Type)

HINT:

Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.


Click hereEngine / Hybrid System>B58 (INTAKE / EXHAUST)>TURBO WATER PIPE (for Inlet Side)>INSTALLATION

Hide 16027 2.INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY (for 6 Port Type)

HINT:

Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.


Click hereEngine / Hybrid System>B58 (INTAKE / EXHAUST)>TURBO WATER PIPE (for Inlet Side)>INSTALLATION

Hide 15407 3.INSTALL INLET TURBO OIL PIPE SUB-ASSEMBLY (for 2 Port Type)

HINT:

Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.


Click hereEngine / Hybrid System>B58 (INTAKE / EXHAUST)>INLET TURBO OIL PIPE>INSTALLATION

Hide 15407 4.INSTALL INLET TURBO OIL PIPE SUB-ASSEMBLY (for 6 Port Type)

HINT:

Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.


Click hereEngine / Hybrid System>B58 (INTAKE / EXHAUST)>INLET TURBO OIL PIPE>INSTALLATION

Hide 16028 5.INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY (for 2 Port Type)

HINT:

Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.


Click hereEngine / Hybrid System>B58 (INTAKE / EXHAUST)>TURBO WATER PIPE (for Outlet Side)>INSTALLATION

Hide 16028 6.INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY (for 6 Port Type)

HINT:

Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.


Click hereEngine / Hybrid System>B58 (INTAKE / EXHAUST)>TURBO WATER PIPE (for Outlet Side)>INSTALLATION

Hide 7.INSTALL NO.2 HEAT INSULATOR (for 6 Port Type)

HINT:

Perform this procedure only when replacement of the turbocharger sub-assembly is necessary.


a.

Install the No.2 heat insulator.


b.

Tighten the screws.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 8.INSPECT THE COMPONENTS PRIOR TO INSTALLATION OF THE TURBOCHARGER SUB-ASSEMBLY

a.

Check the outlet turbo oil pipe and inlet turbo oil pipe sub-assembly for contamination, obstruction and damage: clean or replace if necessary.

HINT:

If the outlet turbo oil pipe and/or inlet turbo oil pipe sub-assembly are heavily contaminated, we recommend changing the engine oil and the oil filter.



b.

Check the No. 1 turbo water pipe sub-assembly and No. 2 turbo water pipe sub-assembly for the turbocharger sub-assembly for contamination, obstruction and damage: clean or replace if necessary.


c.

Check all bolt connections and cable connections for correct fit.


d.

Check air cleaner for contamination and clean or replace as needed.


e.

Check correct functioning of ventilation hose.


Hide 17201 9.INSTALL TURBOCHARGER SUB-ASSEMBLY (for 2 Port Type)

a.
A441914

Check screw-in depth (A) of the E6 stud bolts (1); if necessary, screw the stud bolts in further or unscrew.

NOTICE:

Secure the E6 stud bolts (1) with screw locking.


Adhesive:

Screw Lock Loctite 273, High Strength


Standard:

Dimension (A) = 30 mm (1.18 in.)



b.
A441931

Clean sealing surfaces (1) on the exhaust manifold and on the cylinder head sub-assembly.

NOTICE:
·

Damage to the surface.

·

The use of metal-cutting tools (e.g. emery cloth) to clean the surfaces can damage them and lead to leaks or engine damage.

-

Do not use any metal-cutting tools.





c.
A441932

Replace exhaust manifold to head gaskets.


d.
A441913

Position the exhaust manifold to head gaskets (1) on the cylinder head sub-assembly.

HINT:

Make sure the exhaust manifold to head gaskets (1) are positioned correctly.



e.
A441910

Install turbocharger sub-assembly (1) in the direction of the arrow.

HINT:

Protect the turbocharger sub-assembly (1) from falling.



f.
A441907

Replace the nuts on the turbocharger sub-assembly.


g.

Tighten nuts.

Torque:
18 N*m (184 kgf*cm, 13 ft.*lbf)


h.

Replace the T40 bolt.


i.

Tighten the T40 bolt on the turbocharger sub-assembly.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


j.

Install the No. 1 turbo water pipe sub-assembly in the cylinder block sub-assembly and tighten the T30 bolt.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


k.

Tighten down the T30 bolt.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


l.

Fill turbocharger sub-assembly up to the top with engine oil using the inlet turbo oil pipe sub-assembly connection.

Engine oil:

Toyota Genuine Motor Oil SN 0W-20 C5 for GR Toyota Supra


HINT:
·

Technically suitable engine oils for BMW Group engines

·

Observe the sign in the engine compartment! Only pour in approved engine oil with the correct SAE viscosity classification.




Hide 17201 10.INSTALL TURBOCHARGER SUB-ASSEMBLY (for 6 Port Type)

a.
C435019

Check screw-in depth (A) of the upper stud bolt (1).

Standard:

Dimension (A) = 30 mm (1.18 in.)



b.
C435018

Clean sealing surfaces (1) on the cylinder head sub-assembly using special tool.

NOTICE:
·

Damage to the surface.

·

The use of metal-cutting tools (e.g. emery cloth) to clean the surfaces can damage them and lead to leaks or engine damage.

-

Do not use any metal-cutting tools.





c.
C435017

Replace exhaust manifold to head gaskets (1).


d.

Install the exhaust manifold to head gaskets (1) into the marked area.


e.
C435020

Clean sealing surfaces (1) on the turbocharger sub-assembly.

NOTICE:
·

Damage to the surface.

·

The use of metal-cutting tools (e.g. emery cloth) to clean the surfaces can damage them and lead to leaks or engine damage.

-

Do not use any metal-cutting tools.





f.
C435016

Install the turbocharger sub-assembly (1).

CAUTION:
·

Heavy component.

·

Heavy components can lead to injury or damage.

-

Remove and install heavy components with the aid of another person/other persons.





g.

Thermal compensating elements of the turbocharger sub-assembly (1) or exhaust manifold should not be bent or deformed.


h.
C435015

Install the slide rail (1).

HINT:

Install slide rail (1) so that the part number is seen.



i.
C435014

Replace the nuts.


j.

Tighten nuts in sequence (1) to (7).

Torque:
1st 10Nm
2nd 10Nm
3rd 16Nm
4th 16Nm
5th 16Nm



k.

Make sure the thermal compensating elements (A) have not been damaged.


l.

Loosen nuts (1) and (2).


m.
C435007

Remove special tool 2 466 467 at the exhaust turbocharger (3).

SST
09290-WA020  


n.
C435008

Loosen nuts (1) and (2).


o.

Remove special tool 2 466 467 at the exhaust turbocharger (3).

SST
09290-WA020  


p.
C435006

Loosen screw (2).


q.

Remove the bracket (1) of the special tool 2 446 919 and set it aside.

SST
09290-WA010  


r.
C435021

Release clamping lever (1) of the special tool 2 446 919 in the direction of arrow.

SST
09290-WA010  


s.
C434996

Loosen screw (1).


t.

Remove special tool 2 446 919 at the turbocharger sub-assembly.

SST
09290-WA010  


u.

Renew O-ring on the No. 1 turbo water pipe sub-assembly of the turbocharger sub-assembly.


v.

Feed in and install No. 1 turbo water pipe sub-assembly for the turbocharger sub-assembly (3).


w.

Tighten down screws.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


x.

Renew screws.


y.

Install turbocharger stay.


z.

Tighten down screws.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


Hide 15407 11.CONNECT INLET TURBO OIL PIPE SUB-ASSEMBLY (for 2 Port Type)

a.

Position turbo oil inlet pipe sub-assembly.


b.

Tighten down the T30 bolt.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 15407 12.CONNECT INLET TURBO OIL PIPE SUB-ASSEMBLY (for 6 Port Type)

a.

Renew O-ring on the inlet turbo oil pipe sub-assembly of the turbocharger sub-assembly.


b.

Position turbo oil inlet pipe sub-assembly.


c.

Tighten down the screw.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 16028 13.CONNECT NO. 2 TURBO WATER PIPE SUB-ASSEMBLY (for 2 Port Type)

a.

Tighten the T30 bolt on the holder of the No. 2 turbo water pipe sub-assembly.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


b.

Connect the coolant hose.


Hide 16028 14.CONNECT NO. 2 TURBO WATER PIPE SUB-ASSEMBLY (for 6 Port Type)

a.

Tighten the screw on the holder of the No. 2 turbo water pipe sub-assembly.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


b.

Connect the coolant hose.

HINT:

The coolant return line must engage audibly.



Hide 17167 15.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR (for 6 Port Type)

Hide 25051 17.INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

Hide 22.INSTALL STEERING LINK ASSEMBLY

Hide 23.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 24.ADD ENGINE COOLANT (for High Temperature)

Hide 25.INSPECT FOR COOLANT LEAK (for High Temperature)