Home › Brake › BRAKE SYSTEM (OTHER) › BRAKE BOOSTER (for Gasoline Model) › 2020.03–2020.07
RM36W0E _54 Brake _088656 BRAKE SYSTEM (OTHER) _0422047 BRAKE BOOSTER(for Gasoline Model) A

BRAKE SYSTEM (OTHER)  BRAKE BOOSTER(for Gasoline Model)  INSTALLATION  


PROCEDURE

Hide 44785 1.INSTALL BRAKE BOOSTER GASKET

a.

Install a new brake booster gasket to the brake booster assembly.


Hide 44610 2.INSTALL BRAKE BOOSTER ASSEMBLY

a.

Temporarily install the brake booster assembly to the vehicle.

NOTICE:

Do not apply excessive force to the brake lines or refrigerant lines.



b.

Return the front No. 1 brake tube and front No. 2 brake tube to their original positions.

NOTICE:

Do not apply excessive force to the brake tubes.



c.

Temporarily install the lock nut and brake master cylinder push rod clevis to the brake booster assembly.

NOTICE:

Fully tighten the lock nut when adjusting the brake pedal height.



d.
C435054N01
0.583,1.333 0.781,1.531 0.198,0.198 10 true 1 2.75,0.604 2.948,0.802 0.198,0.198 10 true 2 0.604,0.594 0.802,0.792 0.198,0.198 10 true 3 2.76,1.333 2.958,1.531 0.198,0.198 10 true 4

Install the 4 nuts to secure the brake booster assembly.

Torque:
12.7 N*m (130 kgf*cm, 9 ft.*lbf)

NOTICE:

Tighten the 4 nuts in the order shown in the illustration.



e.

Remove the protective tape.


f.

Connect the connector.


Hide 3.CONNECT CHECK VALVE TO CONNECTOR TUBE HOSE

a.
C435052C01
1.219,1.156 0.49,0.844 true 0.229,0.729 0.479,0.958 0.25,0.229 10 true *a
*a Paint Mark


Connect the check valve to connector tube hose to the brake booster assembly and slide the clip to secure it.

NOTICE:
·

When connecting the check valve to connector tube hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing upward.




Hide 4.INSTALL BRAKE LINE

a.

Engage the 6 clamps to install the 2 new No. 1 brake tube clamps to the brake lines.


b.

Engage the clamp to install a new No. 2 brake tube clamp to the vehicle body.


c.

Engage the 3 clamps to install the brake lines to the No. 2 brake tube clamp.


d.

for Manual Transaxle:

i.

Engage the clamp to install the clutch master cylinder to flexible hose tube to the No. 2 brake tube clamp.



e.
C435057C01
1.771,4.229 2.083,4.427 0.313,0.198 10 false *a
*a Torque Wrench Fulcrum Length


Engage the 10 clamps to install the 2 new No. 5 brake tube clamps to the brake lines.


f.

Temporarily install front No. 1 brake tube and front No. 2 brake tube to the correct position on the brake actuator assembly.


g.

Using a 12 mm union nut wrench, tighten the front No. 1 brake tube and front No. 2 brake tube.

Torque:
Specified tightening torque : 19.5 N*m (199 kgf*cm, 14 ft.*lbf)

NOTICE:
·

Do not kink or damage the brake lines.

·

Do not allow the brake lines to twist or interfere with other parts or the vehicle body during tightening.

·

Do not allow any foreign matter such as dirt or dust to enter the brake lines from the connecting parts.



HINT:
·

Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION

·

When using a union nut wrench (fulcrum length of 20 mm (0.787 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)): 17.4 N*m (177 kgf*cm, 13 ft.*lbf)




Hide 55225C 5.INSTALL DASH PANEL HEAT INSULATOR

a.

Install dash panel heat insulator to the vehicle body with the 3 nuts.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


Hide 51451A 6.INSTALL CENTER ENGINE UNDER COVER

Hide 47101A 8.INSTALL BRAKE PEDAL RETURN SPRING

Hide 55606 10.INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

Hide 47201 12.INSTALL BRAKE MASTER CYLINDER SUB-ASSEMBLY