32000
1.INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY
Using a vernier caliper and straightedge, measure dimension "A" between the transmission fitting surface of the engine*1 and the torque converter clutch fitting surface of the drive plate*2 (step 1).
Align the matchmarks on the transmission case and torque converter clutch, and then mesh the splines of the input shaft and turbine runner.
| *1 | Matchmark |
Mesh the splines of the stator shaft and stator while turning the torque converter clutch.
| *1 | Matchmark |
Turn the torque converter clutch approximately 180°.
Turn the torque converter clutch and align the matchmarks on the torque converter clutch and transmission case to fit the key of the oil pump drive gear into the slot on the torque converter clutch.
| *1 | Matchmark |
Do not push on the torque converter clutch when aligning the matchmarks.
Using a vernier caliper and straightedge, measure dimension B shown in the illustration and check that B is more than A (measured in step 1).
A + 1 mm (0.0394 in.) or more
33823
2.INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET
Install the transmission control cable bracket with the 2 bolts.
3.INSTALL WIRE HARNESS CLAMP BRACKET
Install the 4 brackets with the 4 bolts.
35000
4.INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
Apply clutch spline grease to the surface of the crankshaft that contacts the torque converter clutch centerpiece.
Toyota Genuine Clutch Spline Grease or equivalent
Approximately 1 g (0.0353 oz.)
| *1 | Torque Converter Clutch Center Peace |
| *2 | Crankshaft |
Confirm that the 2 knock pins are on the transmission contact surface of the engine block before transmission installation.
Install the automatic transmission with the 9 bolts.
35104V
5.CONNECT BREATHER PLUG HOSE
Connect the breather plug hose to the engine.
6.CONNECT WIRE HARNESS AND CONNECTOR
Connect the park/neutral start switch connector, transmission wire connector and 2 speed sensor connectors.
Push up the lever until the claw of the transmission wire connector makes a connection sound.
Connect the 2 connector clamps and 4 harness clamps.
Tilt up the automatic transmission.
12371
7.INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR
Install the rear engine mounting insulator to the transmission with the 4 bolts.
Install the rear engine mounting heat insulator to the engine mounting insulator.
51204
8.INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
Install the frame crossmember to the rear engine mounting insulator with the 4 bolts.
Install the frame crossmember with the 4 bolts and 4 nuts.
51225B
9.INSTALL FRONT SUSPENSION MEMBER BRACKET LH AND RH
Install the front suspension member bracket LH and RH with the 8 bolts.
32101A
10.INSTALL DRIVE PLATE AND TORQUE CONVERTER CLUTCH SETTING BOLT
Turn the crankshaft to gain access to the installation locations of the 6 torque converter clutch setting bolts and install each bolt while holding the crankshaft pulley bolt with a wrench.
Install the black bolt first, and then the 5 silver bolts.
Install the flywheel housing side cover.
28100
11.INSTALL STARTER ASSEMBLY
Install the starter (See page Engine / Hybrid System>1GR-FE STARTING>STARTER>INSTALLATION).
32921
12.CONNECT NO. 1 OIL COOLER INLET TUBE AND NO. 1 OIL COOLER OUTLET TUBE
Temporarily install the ends of the oil cooler inlet tube and outlet tub to each oil cooler tube union by hand.
Close the 2 No. 2 flexible hose clamps and install the 2 bolts.
Using a union nut wrench, tighten the inlet and outlet tubes.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
33820B
13.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the transmission control cable to the transmission control cable bracket with a new clip, and connect the cable end to the control shaft lever with the nut.
17119
14.INSTALL NO. 2 MANIFOLD STAY
Install the stay with the 3 bolts.
17118
15.INSTALL MANIFOLD STAY
Install the stay with the 3 bolts.
17410
16.INSTALL FRONT EXHAUST PIPE ASSEMBLY
Install the front exhaust pipe (See page Engine / Hybrid System>1GR-FE INTAKE / EXHAUST>EXHAUST PIPE>INSTALLATION).
37110
17.INSTALL PROPELLER SHAFT ASSEMBLY
Install the propeller shaft (See page Drivetrain>DRIVE SHAFT / PROPELLER SHAFT>PROPELLER SHAFT ASSEMBLY(for 2WD)>INSTALLATION).
18.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page Power Source / Network>1GR-FE BATTERY / CHARGING>GENERATOR>INSTALLATION).
19.ADD AUTOMATIC TRANSMISSION FLUID
Add automatic transmission fluid (See page Drivetrain>A750E AUTOMATIC TRANSMISSION / TRANSAXLE>AUTOMATIC TRANSMISSION FLUID>ADJUSTMENT).
20.ADJUST SHIFT LEVER POSITION
21.INSPECT SHIFT LEVER POSITION
22.INSPECT FOR EXHAUST GAS LEAK
53736B
23.INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL RH
53736
24.INSTALL FRONT FENDER APRON SEAL RH
51450
25.INSTALL REAR ENGINE UNDER COVER ASSEMBLY
51405A
26.INSTALL NO. 1 ENGINE UNDER COVER
27.PERFORM RESET MEMORY
Perform the RESET MEMORY procedures (A/T initialization) (See page Drivetrain>A750E AUTOMATIC TRANSMISSION / TRANSAXLE>AUTOMATIC TRANSMISSION SYSTEM>INITIALIZATION).