1.INSTALL COMMON RAIL ASSEMBLY
Install the common rail assembly with the 2 bolts.
55 N*m (561 kgf*cm, 41 ft.*lbf)
Connect the fuel hose.
Connect the fuel pressure sensor connector.
2.INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE
Temporarily install the fuel filter to injection pump fuel pipe with the 2 union nuts.
Using a union nut wrench (17 mm), tighten the union nuts.
35 N*m (357 kgf*cm, 26 ft.*lbf)
If the supply pump assembly has been replaced, the fuel filter to injection pump fuel pipe must also be replaced.
Refer to the torque above when not using the union nut wrench. When using the union nut wrench, calculate the torque in accordance with the lengths of the union nut wrench and torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
Install the pipe clamp with the nut. Tighten the nut until the clamp's edges make contact with the engine side clamp's edges.
3.INSTALL INJECTION PIPE SUB-ASSEMBLY
Temporarily install the 4 injection pipe sub-assemblies with the union nuts.
Using a union nut wrench (17 mm), tighten the 8 union nuts.
35 N*m (357 kgf*cm, 26 ft.*lbf)
If the common rail has been replaced, the injection pipe sub-assemblies must also be replaced.
Refer to the torque above when not using the union nut wrench. When using the union nut wrench, calculate the torque in accordance with the lengths of the union nut wrench and torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
4.INSTALL INJECTION PIPE CLAMP
Install the 2 injection pipe clamps with the 2 nuts. Tighten the nut until the clamp's edges make contact with the engine side clamp's edges.
5.INSTALL NO. 2 HARNESS BRACKET
Install the No. 2 harness bracket with the 2 bolts.
29 N*m (291 kgf*cm, 21 ft.*lbf)
Engage the 3 harness clamps.
6.INSTALL NO. 2 INTAKE PIPE WITH EGR VALVE
16206
7.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
17113
8.INSTALL INTAKE PIPE WITH VENTURI ASSEMBLY
15301
9.INSTALL OIL DIPSTICK GUIDE
17342P
10.INSTALL NO. 2 AIR HOSE
44360
11.INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY
25625B
12.INSTALL EGR VALVE BRACKET
13.INSTALL WIRE HARNESS AND CONNECTORS
25608
14.INSTALL EGR COOLER SUB-ASSEMBLY
17271
15.INSTALL NO. 1 TURBO INSULATOR
17113
16.INSTALL INTAKE PIPE
16206C
17.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
18.ADD ENGINE COOLANT
58701A
19.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY (for LHD)
58701A
20.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY (for RHD)
33504F
21.INSTALL SHIFT LEVER SUB-ASSEMBLY (for Manual Transmission)
58841A
22.INSTALL SHIFTING HOLE COVER (for Automatic Transmission)
33503F
23.INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY (for Automatic Transmission)
33820B
24.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY (for RHD)
33820B
25.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY (for LHD)
58848A
26.INSTALL SHIFT LEVER HOLE COVER WITH BOOTS (for RHD)
27.BLEED AIR FROM FUEL SYSTEM
28.INSPECT FOR COOLANT LEAK
29.INSPECT FOR OIL LEAK
30.INSPECT FOR FUEL LEAK
33531B
31.INSTALL SHIFT AND SELECT LEVER SHAFT DUST BOOT (for LHD)
58534A
32.INSTALL TRANSMISSION COVER MAT (for Manual Transmission)
58420
33.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY (for Automatic Transmission)
33820B
34.INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)
33820B
35.ADJUST TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)
36. SHIFT LEVER POSITION (for Automatic Transmission)
58420
37.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY
58521D
38.INSTALL ENGINE SERVICE HOLE COVER MAT (w/o Carpet)
58734B
39.INSTALL ENGINE SERVICE COVER REAR WEATHERSTRIP
58410
40.INSTALL ENGINE SERVICE HOLE COVER
58521D
41.INSTALL ENGINE SERVICE HOLE COVER MAT (w/ Carpet)
51441D
42.INSTALL NO. 1 ENGINE UNDER COVER (for Plastic Type)
51441D
43.INSTALL NO. 1 ENGINE UNDER COVER (for Metal Type)
51459
44.INSTALL ENGINE SIDE COVER STAY (for TCAP Made)