When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
After removing the injection pipes, clean them with a brush and compressed air.
23670
1.INSTALL INJECTOR ASSEMBLY
Be sure to install the injector, No. 1 nozzle holder clamp, washer and bolt in their original positions.
Install 4 new injection nozzle seats to the cylinder head.
Apply a small amount of clean engine oil to 4 new O-rings.
Install an O-ring to each injector as shown in the illustration.
| *1 | New O-Ring |
Insert the 4 injectors into the cylinder head.
Insert the injector until it touches the injection nozzle seat surface.
After installing the injector to the cylinder head, the O-ring may prevent the injector from fully seating. If so, pull out the injector and reinstall it.
Always return an injector to the same place it was removed from.
For an injector that has been replaced with a new injector, register the injector compensation code (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION).
Temporarily install 4 new washers and the 4 No. 1 nozzle holder clamps with the 4 bolts.
| *1 | Washer |
| *a | Downward |
Apply a small amount of engine oil to the threads and under the heads of the clamp bolts.
The fork portion of the nozzle holder clamp must be set on the injector.
Before tightening the bolts, check that the No. 1 nozzle holder clamp is set properly.
When installing the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in the following step.
When tightening the bolts, pay attention so as not to tilt the bolt and the clamp.
Do not reuse the washer.
If the nozzle leakage pipe is accidentally tightened beyond the torque specification, it must be replaced.
| *1 | Nozzle Clamp Holder |
Temporarily install the 4 injection pipes with the union nuts.
To position the injectors, loosely tighten the union nut.
Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
If scratches or dents are present, replace the nozzle leakage pipe.
Set the leakage pipe and 5 new gaskets in place.
| *1 | Union Bolt |
| *2 | Hollow Screw |
Apply a small amount of oil to the 4 injector hollow screws and union bolt.
Temporarily install the leakage pipe with the 4 injector hollow screws and union bolt.
Tighten the 4 holder clamp bolts.
Tighten the 4 hollow screws in order from 1 to 4.
| *1 | Union Bolt |
If a hollow screw is accidentally tightened beyond the torque specification, it must be replaced.
Tighten the union bolt.
If the union bolt is accidentally tightened beyond the torque specification, it must be replaced.
Remove the 4 injection pipes.
2.INSPECT FOR FUEL LEAK
Check that there are no leaks from the nozzle leakage pipe connection.
Install the gasket and No. 2 nozzle leakage pipe to the cylinder head with SST (check valve).
23762-27010 (No. 2 nozzle leakage pipe)
90904-30012 (Gasket)
Apply a small amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe connection.
Install SST (turbocharger pressure gauge) to the fuel return side of the leakage pipe, maintain 100 kPa (1.0 kgf/cm2, 15 psi) of pressure for 60 seconds and check that no bubbles form.
After checking for fuel leaks, wipe off the soapy water from the leakage pipe connection.
Remove SST, the No. 2 nozzle leakage pipe and gasket.
Never reinstall the disassembled union bolt to the engine.
11201
3.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.
| *1 | No. 3 Cylinder Head Cover Gasket |
| *2 | Cylinder Head Cover |
Do not install the No. 3 cylinder head cover gaskets at an angle.
Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.
Remove any old seal packing (FIPG material) from the cylinder head.
Apply seal packing to the specific areas shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
| *1 | Seal Packing |
Remove any oil from the contact surface.
Install the head cover within 3 minutes after applying seal packing.
Do not start the engine for at least 2 hours after installing the seal packing.
Install a new cylinder head cover gasket and the cylinder head cover with the 10 bolts and 2 nuts.
Install 4 new nozzle holder seals.
11202D
4.INSTALL NO. 2 CYLINDER HEAD COVER SUB-ASSEMBLY
Install the No. 2 cylinder head cover with the 4 bolts.
Attach the 2 wire harness clamps and connect the wire harness to the No. 2 cylinder head cover.
Connect the 4 injector connectors.
12229
5.INSTALL VENTILATION PIPE
23770
6.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
15601
7.INSTALL OIL FILTER SUB-ASSEMBLY
23704
8.INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
Keep the joints of the injection pipe clean.
Temporarily install the No. 4 injection pipe with the union nuts.
Install the bolt.
If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection clamp with a new one.
Make sure that the inner-rubbers of the injection pipe fit inside the clamps.
When installing the pipe, check that the inner-rubbers and the clamps are in their proper positions.
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.
| *a | Common Rail Side |
| *b | Injector Side |
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
17118
9.INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE
26100G
10.INSTALL INTAKE AIR CONNECTOR WITH DIESEL THROTTLE BODY ASSEMBLY (w/o EGR System)
11.CONNECT ENGINE WIRE (w/o EGR System)
17871A
12.INSTALL AIR CONNECTOR STAY (w/o EGR System)
23701
13.INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY (w/o EGR System)
When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
Keep the joints of the injection pipe clean.
Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.
Install the No. 2 and No. 3 injection pipe clamps with the 2 bolts and 2 nuts as shown in the illustration.
| *1 | No. 2 Injection Pipe |
If the painted mark on the No. 2 injection pipe has disappeared, use the illustration as a reference to install the clamps.
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.
| *a | Common Rail Side |
| *b | Injector Side |
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
22267A
14.INSTALL THROTTLE BODY BRACKET (w/o EGR System)
17113E
15.INSTALL NO. 1 INTAKE PIPE (w/o EGR System)
25709E
16.CONNECT NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY (w/o EGR System)
87245A
17.CONNECT INLET HEATER WATER HOSE (w/o EGR System)
25800
18.INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR System)
Install the electric EGR control valve assembly (See page Engine / Hybrid System>1KD-FTV (EMISSION CONTROL)>EGR VALVE>INSTALLATION).
19.PERFORM REGISTRATION
Perform registration of the injector compensation code (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION).
Perform registration of pilot quantity learning (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION).
20.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
21.ADD ENGINE COOLANT (w/ EGR System with EGR Cooler)
22.BLEED AIR FROM FUEL SYSTEM
23.INSPECT FOR COOLANT LEAK (w/ EGR System with EGR Cooler)
24.INSPECT FOR FUEL LEAK
25.INSPECT FOR OIL LEAK
26.INSPECT ENGINE OIL LEVEL