Home › Suspension › SUSPENSION CONTROL › HEIGHT CONTROL ACCUMULATOR
RM2660E _53 Suspension _052813 SUSPENSION CONTROL _0255370 HEIGHT CONTROL ACCUMULATOR A

SUSPENSION CONTROL  HEIGHT CONTROL ACCUMULATOR  INSTALLATION  


PROCEDURE

Hide 49130F 1.INSTALL SUSPENSION CONTROL PUMP ACCUMULATOR ASSEMBLY

C172584

a.

Install the accumulator with the 3 nuts.

Torque:
31 N*m (316 kgf*cm, 23 ft.*lbf)


Hide 48987 2.INSTALL NO. 7 HEIGHT CONTROL TUBE

C174938E01
0.42,2.645 1.613,2.828 1.193,0.184 10 Union Nut Wrench 2.776,1.643 3.301,1.956 0.526,0.313 10 Fulcrum Length 2.116,1.329 1.079,2.121 false 1.076,2.125 1.076,2.616 false

a.

Using a union nut wrench, install the No. 7 control tube to the control valve and accumulator.

Torque:
without union nut wrench : 15 N*m (155 kgf*cm, 11 ft.*lbf)
with union nut wrench : 14 N*m (143 kgf*cm, 10 ft.*lbf)

HINT:
·

Use a torque wrench with a fulcrum length of 300 mm (11.8 in.).

·

The torque value for use with a union nut wrench is effective when the union nut wrench is parallel to the torque wrench.




Hide 17420 3.INSTALL CENTER EXHAUST PIPE ASSEMBLY

a.

for 1GR-FE:

Install the center exhaust pipe (See page Engine / Hybrid System>1GR-FE (INTAKE / EXHAUST)>EXHAUST PIPE>INSTALLATION).


b.

for 1UR-FE:

Install the center exhaust pipe (See page Engine / Hybrid System>1UR-FE (INTAKE / EXHAUST)>EXHAUST PIPE>INSTALLATION).


c.

for 3UR-FE:

Install the center exhaust pipe (See page Engine / Hybrid System>3UR-FE (INTAKE / EXHAUST)>EXHAUST PIPE>INSTALLATION).


d.

for 1VD-FTV:

Install the center exhaust pipe (See page Engine / Hybrid System>1VD-FTV (INTAKE / EXHAUST)>EXHAUST PIPE(w/o DPF)>INSTALLATION).


Hide 17430 4.INSTALL TAILPIPE ASSEMBLY

Hide 489D5 8.INSTALL HEIGHT CONTROL UNIT INSULATOR

Hide 9.CHECK FOR EXHAUST GAS LEAK

If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.