17112 1.INSTALL NO. 2 INTAKE MANIFOLD
Install a new gasket and the No. 2 intake manifold with the 9 bolts.
17111 2.INSTALL NO. 1 INTAKE MANIFOLD
Install a new gasket and the No. 1 intake manifold with the 8 bolts.
3.INSTALL STARTER HOSE BRACKET SUB-ASSEMBLY
16268 4.INSTALL NO. 1 WATER BY-PASS PIPE
Install a new gasket and the No. 1 water by-pass pipe with the union bolt.
Install the bolt.
23920A 5.INSTALL FUEL COOLER
23763 6.INSTALL NO. 3 NOZZLE LEAKAGE PIPE
23764A 7.INSTALL NO. 4 NOZZLE LEAKAGE PIPE
16283 8.INSTALL NO. 6 WATER BY-PASS HOSE
9.INSTALL EGR VALVE WITH EGR COOLER (w/ EGR System)
25602 10.INSTALL NO. 2 EGR PIPE SUB-ASSEMBLY (w/ EGR System)
25601 11.INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY (w/ EGR System)
16289 12.CONNECT NO. 5 WATER BY-PASS PIPE
17114D 13.INSTALL NO. 3 INTAKE MANIFOLD
Install a new gasket to the No. 1 intake manifold and a new gasket to the No. 2 intake manifold.
Install the No. 3 intake manifold with the 16 bolts.
| Item | Length |
|---|---|
| Bolt A | 70 mm (2.76 in.) |
| Bolt B | 25 mm (0.984 in.) |
17113 14.INSTALL INTAKE PIPE
Install a new gasket.
Install the intake pipe with the 4 bolts and 2 nuts.
25614 15.INSTALL NO. 4 EGR PIPE (w/ EGR System)
Install 2 new gaskets to the pipe.
Install the No. 4 EGR pipe with the 4 bolts.
23801L 16.INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE SUB-ASSEMBLY
| *a | Marking |
Connect the fuel pump hose and No. 1 fuel hose to the fuel filter to injection pump fuel pipe sub-assembly, and slide the clamp to secure the hoses.
Align the markings and connect the hose.
Align the pinching portion of the clamp with the hose marking and connect the hose.
Install the fuel filter to injection pump fuel pipe sub-assembly with the bolt.
23810A 17.INSTALL COMMON RAIL LH
23820A 18.INSTALL COMMON RAIL RH
23705 19.INSTALL NO. 5 INJECTION PIPE SUB-ASSEMBLY
23805B 20.INSTALL NO. 5 FUEL PIPE SUB-ASSEMBLY
| *a | Marking |
Install a new gasket and the No. 5 fuel pipe sub-assembly with the union bolt.
Install the nut to the No. 5 fuel pipe sub-assembly.
Install the No. 2 injection pipe clamp with the bolt.
Connect the No. 3 fuel hose to the No. 5 fuel pipe sub-assembly, and slide the clamp to secure the hose.
Align the markings and connect the No. 3 fuel hose.
Align the pinching portion of the clamp with the No. 3 fuel hose marking and connect the No. 3 fuel hose.
23239D 21.INSTALL NO. 1 FUEL HOSE
23706 22.INSTALL NO. 6 INJECTION PIPE SUB-ASSEMBLY
w/ EGR System:
When installing a new No. 6 injection pipe, tighten the union nuts by hand until they contact the common rail.
Move the pipe vertically and horizontally and check that the pipe dose not rattle and the union nuts are securely installed. Afterward, tighten once more by hand, and then check that the parts are secure.
| *a | Fulcrum length |
Using a 17 mm union nut wrench, tighten the union nuts.
34 N*m (347 kgf*cm, 25 ft.*lbf)
Make sure there is no damage or foreign matter on the seal surfaces.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29.1 N*m (297 kgf*cm, 21 ft.*lbf)
After installation, check that the injection pipe is free from dents and damage, and the pipe is not deformed.
Install the 2 No. 2 injection pipe clamps with the 2 nuts.
w/o EGR System:
When installing a new No. 6 injection pipe, tighten the union nuts by hand until they contact the common rail.
Move the pipe vertically and horizontally and check that the pipe dose not rattle and the union nuts are securely installed. Afterward, tighten once more by hand, and then check that the parts are secure.
| *a | Fulcrum length |
Using a 17 mm union nut wrench, tighten the union nuts.
34 N*m (347 kgf*cm, 25 ft.*lbf)
Make sure there is no damage or foreign matter on the seal surfaces.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29.1 N*m (297 kgf*cm, 21 ft.*lbf)
After installation, check that the injection pipe is free from dents and damage, and the pipe is not deformed.
Install the No. 2 injection pipe clamp with the nut.
Install the No. 6 injection pipe sub-assembly with the bolt.
23.INSTALL INJECTION PIPE LH
When installing 4 new injection pipes, tighten the union nuts by hand until they contact the common rail assembly and injector assembly.
Move the pipe vertically and horizontally and check that the pipe dose not rattle and the union nuts are securely installed. Afterward, tighten once more by hand, and then check that the parts are secure.
| *a | Fulcrum length |
Using 17 mm union nut wrench, tighten the union nuts.
34 N*m (347 kgf*cm, 25 ft.*lbf)
Make sure there is no damage or foreign matter on the seal surfaces.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29.1 N*m (297 kgf*cm, 21 ft.*lbf)
After installation, check that the injection pipe is free from dents and damage, and the pipe is not deformed.
24.INSTALL INJECTION PIPE RH
When installing 4 new injection pipes, tighten the union nuts by hand until they contact the common rail assembly and injector assembly.
Move the pipe vertically and horizontally and check that the pipe dose not rattle and the union nuts are securely installed. Afterward, tighten once more by hand, and then check that the parts are secure.
| *a | Fulcrum length |
Using a 17 mm union nut wrench, tighten the union nuts.
34 N*m (347 kgf*cm, 25 ft.*lbf)
Make sure there is no damage or foreign matter on the seal surfaces.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29.1 N*m (297 kgf*cm, 21 ft.*lbf)
After installation, check that the injection pipe is free from dents and damage, and the pipe is not deformed.
17947B 25.INSTALL NO. 3 INTERCOOLER SUPPORT BRACKET
Install the No. 3 intercooler support bracket with the 2 bolts.
23265 26.INSTALL NO. 1 GAS FILTER
Install the No. 1 gas filter.
Connect the hose to the intake pipe.
82121 27.CONNECT ENGINE WIRE
RH Side:
Connect the engine wire with the 4 bolts.
Attach the 2 clamps.
Connect the 4 fuel injector connectors.
Connect the 2 connectors.
LH Side:
Connect the engine wire with the 7 bolts.
Connect the 4 fuel injector connectors.
Connect the 2 connectors.
Rear Side:
Connect the 2 wire harness brackets with the 2 bolts.
Connect the 2 ground wires with the 2 bolts.
Attach the clamp to the No. 3 intercooler support bracket.
23243C 28.INSTALL FUEL PUMP MOTOR WIRE
Connect the fuel pump motor connector.
Install the bracket with the bolt.
16278 29.INSTALL NO. 2 WATER BY-PASS PIPE
| *a | Marking |
Install the No. 2 water by-pass pipe, and slide the clamp to secure the hose.
Align the markings and connect the hose.
Align the pinching portion of the clamp with the hose marking and connect the hose.
16288 30.INSTALL NO. 4 WATER BY-PASS PIPE
w/ EGR System:
Connect the inlet water hose, No. 4 water by-pass hose and No. 7 water by-pass hose to the No. 4 water by-pass pipe, and slide the clamp to secure the hoses.
Install the No. 4 water by-pass pipe with the 2 bolts and nut.
Tighten the 2 bolts first.
w/o EGR System:
Connect the inlet water hose and No. 7 water by-pass hose to the No. 4 water by-pass pipe, and slide the clamp to secure the hoses.
Install the No. 4 water by-pass pipe with the 2 bolts and nut.
Tighten the 2 bolts first.
25850 31.INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY
44761 32.INSTALL VACUUM PUMP TO CONNECTOR TUBE
Install the vacuum pump to connector tube with the 3 bolts.
Connect the union to connector tube hose to the vacuum pump to connector tube, and slide the clamp to secure the hose.
Connect the engine wire clamp to the vacuum pump to connector tube.
82122 33.CONNECT NO. 2 ENGINE WIRE
Connect the No. 2 engine wire with the 2 bolts.
44769 34.INSTALL VACUUM RESERVOIR CONNECT TUBE
| *a | Upper |
Install the vacuum reservoir connect tube with the 4 bolts.
Connect the 2 vacuum hoses, and slide the clamp to secure the hose.
Align the hose markings as shown in the illustration.
Align the pinching portion of the clamp with the hose marking and connect the hose.
23804D 35.INSTALL NO. 4 FUEL PIPE SUB-ASSEMBLY
| *a | Upper |
Install the No. 4 fuel pipe sub-assembly with the 2 bolts.
Connect the No. 2 fuel hose to the No. 4 fuel pipe sub-assembly, and slide the clamp to secure the hose.
| Distance | Specified Condition |
|---|---|
| A | 2.0 to 7.0 mm (0.0787 to 0.276 in.) |
| B | 0 to 3.0 mm (0 to 0.118 in.) |
Install the hose so that its direction and position are as shown in the illustration.
Install the clamp so that its direction and position are as shown in the illustration.
23284A 36.INSTALL NO. 5 FUEL HOSE
| *a | Front |
| *b | Upper |
Install the No. 5 fuel hose to the No. 5 fuel pipe and No. 4 fuel pipe, and slide the 2 clamps to secure the hose.
Align the hose markings as shown in the illustration.
Align the pinching portion of the clamp with the hose marking as shown in the illustration and connect the hose.
16267 37.CONNECT NO. 2 AND NO. 3 WATER BY-PASS HOSES
| *a | Marking |
Connect the No. 2 water by-pass hose and No. 3 water by-pass hose, and slide the 2 clamps to secure the hoses.
Align the markings and connect the hose.
Align the pinching portion of the clamp with the hose marking and connect the hose.
12142 38.INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE
Apply a light coat of engine oil to a new O-ring.
Install the O-ring to the No. 2 engine oil level dipstick guide.
Install the No. 2 engine oil level dipstick guide with the bolt.
15301 39.INSTALL ENGINE OIL LEVEL DIPSTICK
26100G 40.INSTALL DIESEL THROTTLE BODY ASSEMBLY (for Bank 2)
26100G 41.INSTALL DIESEL THROTTLE BODY ASSEMBLY (for Bank 1)
17972 42.INSTALL NO. 2 COOL AIR INLET
17971 43.INSTALL NO. 1 COOL AIR INLET
17940D 44.INSTALL INTERCOOLER ASSEMBLY
45.BLEED AIR FROM FUEL SYSTEM
46.ADD ENGINE COOLANT
47.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
48. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART
49.INSPECT FOR FUEL LEAK
50.INSPECT FOR OIL LEAK
51.INSPECT FOR COOLANT LEAK
51442 52.INSTALL NO. 2 ENGINE UNDER COVER