16322
1.INSTALL WATER INLET PIPE
Apply soapy water to 2 new O-rings and install them to the water inlet pipe.
Install the water inlet pipe to the No. 1 heat exchanger cover.
11302
2.INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
Apply a light coat of engine oil to a new oil pump gasket.
Install the oil pump gasket to the cylinder block.
Apply a light coat of engine oil to a new O-ring.
Install the O-ring to the oil pan sub-assembly.
Apply seal packing in a continuous line to the timing chain cover sub-assembly as shown in the following illustration.
| *a | Continuous Line Area | *b | Dashed Line Area |
| *c | Diagonal Line Area | - | - |
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
| Area | Seal Packing Diameter | Application Position from Inside Edge of Cover |
|---|---|---|
| Continuous Line Area | 3.0 to 4.0 mm (0.118 to 0.157 in.) | 2.5 mm (0.0984 in.) |
| Dashed Line Area | 6.4 mm (0.252 in.) or more, or within OK area shown in illustration | 7.0 mm (0.276 in.) |
| Diagonal Line Area | 3.0 to 4.0 mm (0.118 to 0.157 in.) | 5.5 mm (0.217 in.) |
| *a | Seal Packing Thickness |
| *b | Seal Packing Width |
| *c | OK Area |
When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
Install the timing chain cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
Do not start the engine for at least 2 hours after installing.
Align the oil pump drive rotor spline and crankshaft as shown in the illustration and install the timing chain cover sub-assembly.
Temporarily install the 26 bolts and nut.
| Item | Length | Thread Diameter |
|---|---|---|
| Bolt A | 25 mm (0.984 in.) | 8 mm (0.315 in.) |
| Bolt B | 55 mm (2.17 in.) | 8 mm (0.315 in.) |
| Bolt C | 70 mm (2.76 in.) | 8 mm (0.315 in.) |
| Bolt D | 35 mm (1.38 in.) | 10 mm (0.394 in.) |
| Bolt E | 55 mm (2.17 in.) | 10 mm (0.394 in.) |
| Bolt F | 80 mm (3.15 in.) | 10 mm (0.394 in.) |
| *1 | Nut |
Make sure that there is no oil on the bolt threads.
Tighten the 3 bolts in several steps in the sequence shown in the illustration.
Temporarily install the fan bracket assembly with the 5 bolts to the timing chain cover sub-assembly.
| Item | Length | Thread Diameter |
|---|---|---|
| Bolt A | 70 mm (2.76 in.) | 8 mm (0.315 in.) |
| Bolt B | 80 mm (3.15 in.) | 10 mm (0.394 in.) |
Temporarily install the V-ribbed belt tensioner assembly with the bolt and 6 mm hexagon bolt to the timing chain cover sub-assembly.
Tighten the 8 bolts labeled 4 to 11 in several steps in the sequence shown in the illustration.
Tighten the 22 bolts and nut labeled 12 to 34 in several steps in the sequence shown in the illustration.
After the installation, if the seal packing has seeped out at the areas labeled A shown in the illustration, wipe it off.
11301C
3.INSTALL FRONT CRANKSHAFT OIL SEAL
11202
4.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
Install 5 new gaskets to the No. 2 camshaft bearing cap and No. 3 camshaft bearing cap.
Install the cylinder head cover gasket LH to the cylinder head cover sub-assembly LH.
Remove any oil from the contact surface.
Apply seal packing as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
|
Seal Packing |
Remove any oil from the contact surface.
Install the cylinder head cover sub-assembly LH within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
Install the cylinder head cover sub-assembly LH and a new seal washer with the 14 bolts.
Do not start the engine for at least 2 hours after the installation.
11201
5.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH
Install 5 new gaskets to the No. 1 camshaft bearing cap and No. 3 camshaft bearing cap.
Install the cylinder head cover gasket RH to the cylinder head cover sub-assembly RH.
Remove any oil from the contact surface.
Apply seal packing as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
|
Seal Packing |
Remove any oil from the contact surface.
Install the cylinder head cover sub-assembly RH within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
Install the cylinder head cover sub-assembly RH and a new seal washer with the 14 bolts.
Do not start the engine for at least 2 hours after the installation.
19500
6.INSTALL IGNITION COIL ASSEMBLY
Install the 8 ignition coils with the 8 bolts.
17363Q
7.CONNECT NO. 3 AIR TUBE
Install a new gasket to the No. 3 air tube.
Connect the No. 3 air tube with the 2 nuts and bolt.
| *1 | No. 3 Air Tube |
| *2 | Exhaust Manifold |
| *a | Claw |
Make sure the gasket's claws are not caught between the No. 3 air tube and exhaust manifold.
Install the wire harness clamp bracket with the bolt to the cylinder head cover sub-assembly RH.
17364A
8.CONNECT NO. 4 AIR TUBE
Install a new gasket to the No. 4 air tube.
Connect the No. 4 air tube with the 2 nuts and bolt.
| *1 | No. 4 Air Tube |
| *2 | Exhaust Manifold |
| *a | Claw |
Make sure the gasket's claws are not caught between the No. 4 air tube and exhaust manifold.
Install the wire harness clamp bracket with the bolt to the cylinder head cover sub-assembly LH.
13471
9.INSTALL CRANKSHAFT PULLEY
Align the key groove of the crankshaft pulley with the crankshaft pulley set key, and slide on the crankshaft pulley to install it.
| *a | Hold |
| *b | Turn |
Using SST, install the crankshaft pulley set bolt.
16603
10.INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Install the No. 1 idler pulley sub-assembly to the timing chain cover sub-assembly with the bolt.
16173
11.INSTALL WATER PUMP PULLEY
16279
12.INSTALL NO. 3 WATER BY-PASS PIPE
Perform this procedure only when replacement of the No. 3 water by-pass pipe is necessary.
Install the No. 3 water by-pass pipe to the front water by-pass joint with the bolt.
| *a | Stopper |
| *b | Protrusion |
Align the notch of the stopper with the protrusion of the front water by-pass joint.
16355
13.INSTALL FRONT WATER BY-PASS JOINT
Install 2 new gaskets and the front water by-pass joint to the cylinder head with the 4 nuts.
Install the No. 2 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
16293
14.CONNECT NO. 10 WATER BY-PASS HOSE
Connect the No. 10 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
| *1 | No. 9 Water By-pass Hose |
| *2 | No. 10 Water By-pass Hose |
| *a | Paint Mark (Orange) |
| *b | Paint Mark (Yellow) |
16297
15.CONNECT NO. 9 WATER BY-PASS HOSE
Connect the No. 9 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
16323
16.INSTALL WATER INLET HOUSING
Install a new gasket to the timing chain cover sub-assembly.
| *1 | Gasket |
Install the water inlet housing with the 3 bolts.
16281F
17.CONNECT NO. 5 WATER BY-PASS HOSE
16296
18.CONNECT NO. 8 WATER BY-PASS HOSE
16206
19.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Connect the No. 2 water by-pass hose to the water by-pass pipe sub-assembly, and slide the clamp to secure the hose.
Install the water by-pass pipe sub-assembly to the cylinder head cover sub-assembly RH with the 2 bolts.
20.INSTALL AIR TUBE SUB-ASSEMBLY RH
Install the air tube sub-assembly RH to the cylinder head cover sub-assembly RH with the 2 bolts.
16261G
21.INSTALL NO. 1 WATER BY-PASS HOSE
12613
22.INSTALL NO. 3 ENGINE COVER
12614
23.INSTALL NO. 4 ENGINE COVER
27020
24.INSTALL GENERATOR ASSEMBLY
44320
25.CONNECT VANE PUMP ASSEMBLY
Connect the vane pump assembly to the timing chain cover sub-assembly with the 2 bolts.
| *a | Spacer |
Before performing the following procedures, move the spacer until the vane pump assembly can be installed.
11452
26.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
15671
27.INSTALL OIL FILTER BRACKET
Apply a light coat of engine oil to 2 new O-rings.
Install the 2 O-rings to the timing chain cover sub-assembly.
Install the oil filter bracket to the timing chain cover sub-assembly with the 2 nuts and 2 bolts.
83520
28.INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY
29.INSTALL OIL FILTER ELEMENT
88320
30.CONNECT COOLER COMPRESSOR ASSEMBLY
Connect the cooler compressor assembly with the 2 stud bolts.
Install the 2 bolts and 2 nuts.
Tighten the bolts and nuts in the order shown in the illustration to connect the cooler compressor assembly.
31.CONNECT HEATER HOSE AND NO. 1 WATER BY-PASS PIPE
Connect the No. 1 water by-pass pipe with the 2 bolts to the cylinder head cover sub-assembly RH.
Connect the heater hose to the water by-pass pipe sub-assembly, and slide the clamp to secure the hose.
17343
32.CONNECT NO. 3 AIR INJECTION SYSTEM HOSE
Connect the No. 3 air injection system hose to the air tube sub-assembly RH, and slide the clamp to secure the hose.
33.CONNECT ENGINE WIRE
Connect the wire harness clamp bracket to the timing chain cover sub-assembly with the bolt.
Engine Room RH Side:
Connect the 9 clamps.
Connect the 2 air pump connectors.
Install the ground wire RH with the bolt.
Connect the noise filter connector.
Connect the 2 VVT sensor connectors.
Connect the injector connector.
Connect the 4 ignition coil connectors.
Connect the 2 camshaft timing oil control valve connectors.
Connect the power steering oil pressure switch connector and solenoid valve connector.
for 4WD:
Connect the clamp and junction connector.
Engine Room LH Side:
Connect the cooler compressor connector.
Connect the 6 clamps.
Connect the camshaft position sensor connector.
Connect the 2 camshaft timing oil control valve connectors.
Connect the engine coolant temperature sensor connector.
Install the ground wire LH with the bolt.
Connect the noise filter connector.
Connect the 2 VVT sensor connectors.
Connect the 4 ignition coil connectors.
Connect the injector connector.
Connect the 2 wire harness clamps.
Connect the 4 air injection control driver connectors.
Connect the 2 connectors and attach the 2 clamps to the engine room junction block.
Install the engine room relay block cover.
25710
34.INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2)
17341F
35.CONNECT NO. 1 AIR HOSE
25710
36.INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)
17111
37.INSTALL INTAKE MANIFOLD
16400
38.INSTALL RADIATOR ASSEMBLY
39.ADD ENGINE OIL
40.ADD ENGINE COOLANT
41.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
42.INSPECT FOR OIL LEAK
43.INSPECT FOR COOLANT LEAK
44.CHECK ENGINE OIL LEVEL