The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced when charging the HV battery are shown below.
Orange wire harnesses and connectors indicate high-voltage circuits. To prevent electric shock, always follow the procedure described in the repair manual.
for 2WD: Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID CONTROL SYSTEM (for 2WD)>PRECAUTION
for 4WD/AWD: Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID CONTROL SYSTEM (for 4WD/AWD)>PRECAUTION
To prevent electric shock, wear insulated gloves when working on wire harnesses and components of the high voltage system.
After the ignition switch is turned off, the radio and display receiver assembly or the radio receiver assembly records various types of memory and settings. As a result, after turning the ignition switch off, make sure to wait at least 120 seconds before disconnecting the cable from the negative (-) auxiliary battery terminal.
1.INSPECT AUXILIARY BATTERY VOLTAGE
Measure the auxiliary battery voltage.
Approximately 11 V or more
The horn should sound clearly.
If the voltage is 10 V or less, either charge the auxiliary battery (charging usually takes about 1 hour), or replace it with an auxiliary battery that is already charged.
2. PREPARATION FOR HV BATTERY CHARGING
The hybrid system has high-voltage circuits. Accidents, such as electric shock, or electric leaks may result if the hybrid system is not operated in a correct manner. Make sure to follow the correct procedure.
Be sure to wear insulated gloves.
Removing the service plug grip interrupts the high voltage circuit.
High voltage wiring connectors are orange.
Check the charge level of the HV battery.
If the hybrid system fails to start and "Traction Battery Needs to be Protected Shift into P to Restart" is displayed on the multi-information display, the HV battery may be discharged.
Confirm if the engine starts. If the engine starts, leave it idling with the shift lever in P until the engine stops (self charge has completed).
If the engine cannot start, charge the HV battery.
Before performing external charging, always use the GTS to perform troubleshooting.
Charging time using a THS charger is 10 minutes per charge cycle. The charging time when using the THS charger is a short charging time (when the HV battery temperature is 25°C (77°F), 10 minutes may be sufficient, if the HV battery temperature is 0°C (32°F), then three 10 minute charge cycles may be required) for putting the engine in a condition where it can be started (the system can enter the READY-on state). (The THS charger will automatically stop 10 minutes after charging starts.)
Remove the service plug grip.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>SERVICE PLUG GRIP>REMOVAL
Check the terminal voltage.
Disconnect the engine room main wire.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>FRAME WIRE>REMOVAL
Remove the connector cover assembly.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>INVERTER WITH CONVERTER>REMOVAL
Check the terminal voltage.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>INVERTER WITH CONVERTER>REMOVAL
Install the connector cover assembly.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HV BATTERY>REMOVAL
Connect the engine room main wire.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>FRAME WIRE>INSTALLATION
Remove the rear No. 1 seat assembly LH.
Click hereVehicle Interior>SEAT>REAR NO. 1 SEAT ASSEMBLY (for 60/40 Split Seat Type LH Side)>REMOVAL
Remove the rear No. 1 seat assembly RH.
Click hereVehicle Interior>SEAT>REAR NO. 1 SEAT ASSEMBLY (for 60/40 Split Seat Type RH Side)>REMOVAL
Separate the front floor carpet assembly.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>BATTERY BLOWER>REMOVAL
Remove the rear floor silencer.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>BATTERY BLOWER>REMOVAL
Remove the No. 10 HV battery shield panel.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HV BATTERY>REMOVAL
Disconnect the HV floor under wire.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HV BATTERY>REMOVAL
Inspect the electrical insulation of the HV battery.
| *a | Service Plug Grip Removed
(Service Plug Grip Connecting Terminals) |
Using a megohmmeter set to 500 V, measure the resistance according to the value(s) in the table below.
Be sure to set the megohmmeter to 500 V when performing this test. Using a setting higher than 500 V can result in damage to the component being inspected.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - Body ground | Ignition switch off | 10 MΩ or higher |
| 2 - Body ground | Ignition switch off | 10 MΩ or higher |
| *a | Component without harness connected
(HV Battery Junction Block Assembly) |
Using a megohmmeter set to 500 V, measure the resistance according to the value(s) in the table below.
Be sure to set the megohmmeter to 500 V when performing this test. Using a setting higher than 500 V can result in damage to the component being inspected.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Q2-1 (CBI) - Body ground | Ignition switch off | 10 MΩ or higher |
| Q3-1 (CEI) - Body ground | Ignition switch off | 10 MΩ or higher |
Connect the THS charger in the order shown in the illustration.
| *1 | HV Battery | *2 | HV Floor Under Wire |
| *3 | Inverter with Converter Assembly | - | - |
| *a | EV Bonding Cable (Green Cable) | *b | Low Voltage Cable |
| *c | High Voltage Cable | *d | Power Input Plug |
| *e | Grounded AC 100 to 240 V Receptacle | *f | THS Charger |
Connect all of the THS charger cables in the order shown in the illustration to prevent electrical shock.
Connect the 2 SST (high voltage cable) connectors to the HV battery junction block assembly.
Connect the SST (high voltage cable) terminal to the position shown in the illustration with the nut.
Connect the SST (EV bonding cable (green cable)) terminal to the position shown in the illustration with the nut.
| *a | EV Bonding Cable (Green Cable) |
| *b | THS Charger |
Connect the SST (EV bonding cable (green cable)) terminal to SST (THS charger).
Connect the SST (low voltage cable) terminal to the position shown in the illustration with the nut.
| *a | Low Voltage Cable |
| *b | High Voltage Cable |
| *c | THS Charger |
| *d | Power Input Plug |
Connect SST (low voltage cable) and SST (high voltage cable) to SST (THS charger) in the order shown in the illustration.
Install the service plug grip.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>SERVICE PLUG GRIP>INSTALLATION
Connect the cable to the negative (-) auxiliary battery terminal.
Click hereGeneral>MAINTENANCE>A25A-FXS, A25B-FXS AUXILIARY BATTERY>INSTALLATION
Connect SST (power input plug) of SST (THS charger) to a grounded AC 100 to 240 V receptacle.
Always use an AC 100 to 240 V receptacle with a properly functioning ground. The ground is designed to reduce the chance of electric shock if a malfunction occurs. Do not use the charger if any of the pins on its plug have been damaged or removed.
3. HV BATTERY CHARGING
Check the value of the Data List item while performing the Active Test.
| Active Test Display |
|---|
| Hybrid Battery Charge |
| Data List Display |
|---|
| SMRG Status |
| SMRB Status |
If the values of the Data List items are not as specified in the table below, turn the GTS and the ignition switch off and then perform the HV battery charging procedure again.
| Step | Active Test
"Battery Charge" |
THS charger START
Switch |
Data List
"System Main Relay Status - SMRB" |
Data List
"System Main Relay Status - SMRG" |
|---|---|---|---|---|
| 1 | OFF | OFF | OFF | OFF |
| 2 | OFF → ON | OFF | OFF → ON | OFF → ON |
| 3 | ON | OFF → ON | ON | ON |
Make sure that the EMERGENCY STOP switch is in the reset condition (the switch is turned clockwise and released).
Make sure that the BREAKER is in the ON position.
Turn the THS charger MAIN switch on.
The MAIN indicator will illuminate (green).
Press the START switch.
When the START switch is turned on, the INITIAL CHECK indicator illuminates and an initial check starts. When the initial check completes successfully, the INITIAL CHECK indicator turns off, the CHARGING indicator illuminates and charging will start at the same time.
While the INITIAL CHECK indicator is illuminated, the insulation, 400 V output, emergency stop switch, connector connections and ground connection are inspected.
Repeat the charge cycle 3 times. When the last cycle has finished, turn the THS charger MAIN switch off.
Charging time using the THS charger is 10 minutes per charge cycle. The charging time when using a THS charger is a short charging time (when the battery temperature is 25°C (77°F), 10 minutes may be sufficient, if the battery temperature is 0°C (32°F), then three 10 minute charge cycles may be required) for putting the engine in a condition where it can be started (the system can enter the READY-on state). (The THS charger will automatically stop 10 minutes after charging starts.)
There is very little chance of overcharging the HV battery during the second or third charging cycle. The SOC will not likely increase beyond the upper limit because it was low enough to prevent the engine from starting. Even if the SOC was to increase enough to exceed the limit, the hybrid vehicle control ECU will stop the Active Test to prevent overcharging.
Cranking the engine once causes the SOC to drop approximately 1%.
Charging the HV battery once (10 minutes) using the THS charger restores the SOC approximately 2%.
Turn the ignition switch off.
Remove the THS charger and connect the HV floor under wire (for HV Battery).
Disconnect SST (power inlet plug) of SST (THS charger) from the grounded AC 100 to 240 V receptacle.
Disconnect the cable from the negative (-) auxiliary battery terminal.
Click hereGeneral>MAINTENANCE>A25A-FXS, A25B-FXS AUXILIARY BATTERY>REMOVAL
Remove the service plug grip.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>SERVICE PLUG GRIP>REMOVAL
| *a | Low Voltage Cable |
| *b | High Voltage Cable |
| *c | THS Charger |
Disconnect SST (high voltage cable) and SST (low voltage cable) from SST (THS charger) in the order shown in the illustration.
Remove the nut and disconnect the SST (low voltage cable) terminal.
| *a | EV Bonding Cable (Green Cable) |
| *b | THS Charger |
Disconnect the SST (EV bonding cable (green cable)) terminal from SST (THS charger).
Remove the nut and disconnect the SST (EV bonding cable (green cable)) terminal.
Remove the nut and disconnect the SST (high voltage cable) terminal.
Disconnect the 2 SST (high voltage cable) connectors from the HV battery junction block assembly.
Connect the HV floor under wire.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HV BATTERY>INSTALLATION
Install the No. 10 HV battery shield panel.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HV BATTERY>INSTALLATION
Install the service plug grip.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>SERVICE PLUG GRIP>INSTALLATION
Connect the cable to the negative (-) auxiliary battery terminal.
Click hereGeneral>MAINTENANCE>A25A-FXS, A25B-FXS AUXILIARY BATTERY>INSTALLATION
Turn the ignition switch to ON (READY) and check if the engine starts.
If the engine does not start, perform the HV battery charging operation again.
Install the rear floor silencer.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>BATTERY BLOWER>INSTALLATION
Install the front floor carpet assembly.
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>BATTERY BLOWER>INSTALLATION
Install the rear No. 1 seat assembly LH.
Click hereVehicle Interior>SEAT>REAR NO. 1 SEAT ASSEMBLY (for 60/40 Split Seat Type LH Side)>INSTALLATION
Install the rear No. 1 seat assembly RH.
Click hereVehicle Interior>SEAT>REAR NO. 1 SEAT ASSEMBLY (for 60/40 Split Seat Type RH Side)>INSTALLATION
4. CHECK HV BATTERY AFTER HV BATTERY CHARGE
Check for DTCs.
Perform the self-charging operation.
Start the engine and leave it idling with the shift lever in P until the engine stops.
When the engine stops idling, this indicates that self-charging is complete. Perform any initialization procedures required after the negative (-) auxiliary battery terminal is disconnected and reconnected.