Home › Engine / Hybrid System › 1GD-FTV (ENGINE MECHANICAL) › ENGINE UNIT › 2015.06–2018.06
RM27T0E _51 Engine / Hybrid System _053665 1GD-FTV ENGINE MECHANICAL _0260522 ENGINE UNIT A

1GD-FTV ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


CAUTION / NOTICE / HINT

NOTICE:
·

When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.

Replaced Parts (A) Pipes Requiring New Replacement
Injector assembly (including shuffling the injector assemblies between the cylinders)
·

No. 1 injection pipe sub-assembly

·

No. 2 injection pipe sub-assembly


Supply pump assembly Fuel inlet pipe sub-assembly
·

Common rail assembly

·

Cylinder block sub-assembly

·

Cylinder head sub-assembly

·

Cylinder head gasket

·

Timing chain case assembly


·

No. 1 injection pipe sub-assembly

·

No. 2 injection pipe sub-assembly

·

Fuel inlet pipe sub-assembly



·

After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.

·

The injector assembly is a precision instrument. Do not use the injector assembly if it is struck or dropped.

·

The supply pump assembly is a precision instrument. Do not use the supply pump assembly if it is struck or dropped.

·

The common rail assembly is a precision instrument. Do not use the common rail assembly if it is struck or dropped.

·

Hold the supply pump assembly itself during removal and installation. Do not hold the pre-stroke control valve or fuel pipe, etc.

·

Hold the common rail assembly itself during removal and installation. Do not hold the pressure discharge valve or fuel pressure sensor, etc.

·

Make sure foreign matter does not enter the fuel path.



PROCEDURE

Hide 16575C 1.INSTALL NO. 1 WATER HOSE CLAMP BRACKET

a.

Install the No. 1 water hose clamp bracket to the timing chain case assembly with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 88451B 4.INSTALL VISCOUS HEATER CRANKSHAFT PULLEY (w/ Viscous Heater)

Hide 25709E 5.INSTALL NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 4 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly with the bolt.

Torque:
23 N*m (235 kgf*cm, 17 ft.*lbf)


Hide 25708 6.INSTALL NO. 3 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 3 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 4 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.


Hide 25707 7.INSTALL NO. 2 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 2 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly and oil pan sub-assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 25706 8.INSTALL NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 1 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 2 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.


c.

Connect the No. 1 vacuum transmitting hose sub-assembly to the vacuum pump assembly.


Hide 25804A 9.INSTALL VACUUM SWITCHING VALVE SUB-ASSEMBLY (for Engine Mounting)

Hide 16620 10.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

Hide 16603 11.INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY

Hide 16304 12.INSTALL WATER OUTLET SUB-ASSEMBLY

a.

Install a new gasket and the water outlet sub-assembly to the timing chain cover sub-assembly with the 4 bolts and 2 nuts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 16207 13.INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Install the No. 2 water by-pass pipe sub-assembly to the engine water pump assembly and water inlet with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 3 water by-pass hose to the water outlet sub-assembly, and slide the clamp to secure the hose.


Hide 15407 14.TEMPORARILY INSTALL TURBO OIL INLET PIPE SUB-ASSEMBLY

Hide 17141 15.TEMPORARILY INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY

a.

Install 2 new gaskets to the exhaust manifold and turbocharger sub-assembly.


b.

Temporarily install the exhaust manifold to turbocharger sub-assembly with 3 new nuts.


c.
A352802E01
1.046,1.836 1.095,1.893 false 1.095,1.893 1.198,1.893 false 1.209,1.816 1.448,2.032 0.239,0.216 10 *1

Temporarily install the exhaust manifold with turbocharger sub-assembly, 8 collars and the 8 plate washers to the cylinder head sub-assembly with 8 new nuts.

Text in Illustration
*1 Collar
V100136

Engine Side

NOTICE:

Make sure that the side of the collar with the smaller diameter faces the exhaust manifold.



d.

Install a new gasket on the union bolt side to turbo oil inlet pipe sub-assembly.


e.

Temporarily install the union bolt.


Hide 17293 17.TEMPORARILY INSTALL TURBOCHARGER STAY

a.

Temporarily install the turbocharger stay to the turbocharger sub-assembly, with 3 bolts and nut.


Hide 17141 18.TIGHTEN EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY

Hide 87101 20.INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY

a.
A354088E02
1.313,0.292 1.458,0.458 0.146,0.167 10 true 2 1.354,1.698 1.5,1.865 0.146,0.167 10 false 3 2.927,1.406 3.073,1.573 0.146,0.167 10 false 1 2.844,0.615 3,0.802 0.156,0.188 10 true 4

Temporarily install the No. 1 viscous heater bracket sub-assembly to the cylinder block sub-assembly and timing chain cover sub-assembly with the 4 bolts.


b.

Tighten the 4 bolts in the sequence shown in the illustration to install the No. 1 viscous heater bracket sub-assembly.

Torque:
25 N*m (250 kgf*cm, 18 ft.*lbf)


Hide 16268 22.INSTALL NO. 1 WATER BY-PASS PIPE

a.

Install a new gasket and the No. 1 water by-pass pipe to the timing chain cover sub-assembly with the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

HINT:

Make sure that the claw of the gasket faces the No. 1 water by-pass pipe.



Hide 12361 24.INSTALL FRONT ENGINE MOUNTING INSULATOR RH

a.

Install the front engine mounting insulator RH to the front No. 1 engine mounting bracket RH with the nut.

Torque:
64 N*m (653 kgf*cm, 47 ft.*lbf)


b.

Connect the No. 3 vacuum transmitting hose sub-assembly to the front No. 1 engine mounting bracket RH.


Hide 16281 32.CONNECT NO. 4 WATER BY-PASS HOSE

a.

Connect the No. 4 water by-pass hose to the No. 1 injector holder, and slide the clamp to secure the hose.


Hide 16282 33.INSTALL NO. 5 WATER BY-PASS HOSE

a.

Attach the clamp and install the No. 5 water by-pass hose to the No. 1 water hose clamp bracket.


b.

Connect the No. 5 water by-pass hose to the No. 1 injector holder and water outlet sub-assembly, and slide the 2 clamps to secure the hose.


Hide 12229 34.INSTALL PCV PIPE (for Cold Area Specification Vehicles)

Hide 12261 35.INSTALL PCV HOSE (except Cold Area Specification Vehicles)

Hide 88431 37.INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET

NOTICE:

Install the No. 1 compressor mounting bracket exactly as described in the procedures below to properly secure and prevent damage to the fan and generator V belt.


a.
A354094

Temporarily install the No. 1 compressor mounting bracket to the cylinder block sub-assembly with the 2 bolts.

HINT:

Temporarily install the No. 1 compressor mounting bracket with the 2 bolts so that the No. 1 compressor mounting bracket can be moved by hand.



b.
A354095E02
1.115,3.521 1.302,3.677 0.188,0.156 10 true *a 2.625,3.521 2.813,3.677 0.188,0.156 10 true *a 3.198,3.531 3.385,3.688 0.188,0.156 10 true *a 1.875,4.427 2.063,4.583 0.188,0.156 10 false *b 2.458,4.427 2.646,4.583 0.188,0.156 10 false *b 0.521,2.677 0.708,2.833 0.188,0.156 10 false *c 0.771,1.469 0.896,1.646 0.125,0.177 10 true A

Push the No. 1 compressor mounting bracket toward the cylinder block sub-assembly as shown in the illustration and tighten bolt A.

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)

Text in Illustration
*a No Clearance
*b Push
*c Front

HINT:

Make sure there is no clearance between the cylinder block sub-assembly and No. 1 compressor mounting bracket as shown in the illustration.



c.
A354096E01
2.726,1.183 2.93,1.42 0.205,0.237 2.765,1.225 2.907,1.382 0.141,0.158 10 3 2.966,0.478 3.171,0.715 0.205,0.237 3.006,0.52 3.147,0.678 0.141,0.158 10 2 0.973,0.382 1.177,0.619 0.205,0.237 1.03,0.424 1.171,0.582 0.141,0.158 10 1

Uniformly tighten the 3 bolts in the order shown in the illustration.

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)


Hide 16025 38.INSTALL NO. 5 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Install a new gasket and the No. 5 water by-pass pipe sub-assembly to the cylinder block sub-assembly with the 3 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)

HINT:

Make sure that the claw of the gasket faces the No. 5 water by-pass pipe sub-assembly.



Hide 23300 39.INSTALL FUEL FILTER ASSEMBLY

a.

Install the fuel filter assembly to the cylinder block sub-assembly with the 2 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 41.INSTALL HOSE BRACKET

a.

Install the hose bracket to the cylinder head sub-assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 19871 43.INSTALL NO. 1 GLOW PLUG CONNECTOR

Hide 23701 45.TEMPORARILY INSTALL NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY

Hide 23701 47.TIGHTEN NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY

Hide 48.INSTALL WIRING HARNESS CLAMP BRACKET

a.
A354083E02
0.729,0.563 0.885,0.74 0.156,0.177 10 true A 2.313,0.677 2.469,0.833 0.156,0.156 10 true B 2.958,0.146 3.115,0.302 0.156,0.156 10 false B

for LHD:

Install the 3 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 3 bolts.

Torque:
for bolt A : 10 N*m (102 kgf*cm, 7 ft.*lbf)
for bolt B : 8.4 N*m (86 kgf*cm, 74 in.*lbf)


b.
A354084E03
0.948,0.667 1.115,0.823 0.167,0.156 10 true A 3.052,0.844 3.219,1 0.167,0.156 10 true B

for RHD:

Install the 2 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 2 bolts.

Torque:
for bolt A : 10 N*m (102 kgf*cm, 7 ft.*lbf)
for bolt B : 8.4 N*m (86 kgf*cm, 74 in.*lbf)


Hide 23770 52.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY

Hide 22803 58.INSTALL FUEL INJECTION PUMP COVER SUB-ASSEMBLY

Hide 23812D 61.INSTALL NO. 2 FUEL PIPE

a.

Install the No. 2 fuel pipe to the manifold stay with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 1 fuel hose to the No. 2 fuel pipe, and slide the clamp to secure the hose.


Hide 25800 63.INSTALL NO. 1 EGR COOLER AND NO. 2 EGR VALVE ASSEMBLY WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY

Hide 16209 64.INSTALL NO. 4 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Install the No. 4 water by-pass pipe sub-assembly to the intake manifold with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

for Cold Area Specification Vehicles:

Attach the clamp and connect the No. 11 water by-pass hose to the No. 2 fuel pipe.


c.

Connect the water hose to the No. 2 EGR valve assembly, and slide the clamp to secure the hose.


d.

Connect the No. 6 water by-pass hose to the No. 4 water by-pass pipe sub-assembly, and slide the clamp to secure the hose.


Hide 25601 66.INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY

a.

Using an E8 "TORX" socket wrench, install 2 new stud bolts to the exhaust manifold.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Install 2 new gaskets and the No. 1 EGR pipe sub-assembly to the exhaust manifold, electric EGR control valve assembly and No. 1 vacuum transmitting pipe sub-assembly with the bolt and 4 new nuts.

Torque:
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)
for nut : 29 N*m (296 kgf*cm, 21 ft.*lbf)


Hide 27148A 67.INSTALL CONNECTING WIRE

a.

Attach the 2 clamps and install the connecting wire to the hose bracket.


b.

Connect the connector to the common rail assembly.


Hide 16206B 68.INSTALL NO. 3 WATER BY-PASS PIPE SUB-ASSEMBLY

Hide 12631A 73.INSTALL ENGINE COVER BRACKET

a.

Install the engine cover bracket to the cylinder head cover sub-assembly and hose bracket with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 82121 84.INSTALL ENGINE WIRE