Home › Engine / Hybrid System › 1GD-FTV (ENGINE MECHANICAL) › ENGINE UNIT › 2018.06–2019.08
RM27T0E _51 Engine / Hybrid System _053665 1GD-FTV ENGINE MECHANICAL _0260522 ENGINE UNIT A

1GD-FTV ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


CAUTION / NOTICE / HINT

NOTICE:
·

When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.

Replaced Parts (A) Pipes Requiring New Replacement
Injector assembly (including shuffling the injector assemblies between the cylinders)
·

No. 1 injection pipe sub-assembly

·

No. 2 injection pipe sub-assembly


Supply pump assembly Fuel inlet pipe sub-assembly
·

Common rail assembly

·

Cylinder block sub-assembly

·

Cylinder head sub-assembly

·

Cylinder head gasket

·

Timing chain case assembly


·

No. 1 injection pipe sub-assembly

·

No. 2 injection pipe sub-assembly

·

Fuel inlet pipe sub-assembly



·

After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.

·

The injector assembly is a precision instrument. Do not use the injector assembly if it is struck or dropped.

·

The supply pump assembly is a precision instrument. Do not use the supply pump assembly if it is struck or dropped.

·

The common rail assembly is a precision instrument. Do not use the common rail assembly if it is struck or dropped.

·

Hold the supply pump assembly itself during removal and installation. Do not hold the pre-stroke control valve or fuel pipe, etc.

·

Hold the common rail assembly itself during removal and installation. Do not hold the pressure discharge valve or fuel pressure sensor, etc.

·

Make sure foreign matter does not enter the fuel path.



PROCEDURE

Hide 16575C 1.INSTALL NO. 1 WATER HOSE CLAMP BRACKET

a.

Install the No. 1 water hose clamp bracket to the timing chain case assembly with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 88451B 4.INSTALL VISCOUS HEATER CRANKSHAFT PULLEY (w/ Viscous Heater)

Hide 25709E 5.INSTALL NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 4 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly with the bolt.

Torque:
23 N*m (235 kgf*cm, 17 ft.*lbf)


Hide 25708 6.INSTALL NO. 3 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 3 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 4 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.


Hide 25707 7.INSTALL NO. 2 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 2 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly and oil pan sub-assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 25706 8.INSTALL NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY

a.

Install the No. 1 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 2 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.


c.

Connect the No. 1 vacuum transmitting hose sub-assembly to the vacuum pump assembly.


Hide 25804A 9.INSTALL VACUUM SWITCHING VALVE SUB-ASSEMBLY (for Engine Mounting)

Hide 16620 10.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

Hide 16603 11.INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY

Hide 16304 12.INSTALL WATER OUTLET SUB-ASSEMBLY

a.

Install a new gasket and the water outlet sub-assembly to the timing chain cover sub-assembly with the 4 bolts and 2 nuts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 16207 13.INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Install the No. 2 water by-pass pipe sub-assembly to the engine water pump assembly and water inlet with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 3 water by-pass hose to the water outlet sub-assembly, and slide the clamp to secure the hose.


Hide 15407 14.TEMPORARILY INSTALL TURBO OIL INLET PIPE SUB-ASSEMBLY

Hide 17141 15.TEMPORARILY INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY

a.

Install 2 new gaskets to the exhaust manifold and turbocharger sub-assembly.


b.

Temporarily install the exhaust manifold to turbocharger sub-assembly with 3 new nuts.


c.
A352802E01
1.046,1.836 1.095,1.893 false 1.095,1.893 1.198,1.893 false 1.209,1.816 1.448,2.032 0.239,0.216 10 *1

Temporarily install the exhaust manifold with turbocharger sub-assembly, 8 collars and the 8 plate washers to the cylinder head sub-assembly with 8 new nuts.

Text in Illustration
*1 Collar
V100136

Engine Side

NOTICE:

Make sure that the side of the collar with the smaller diameter faces the exhaust manifold.



d.

Install a new gasket on the union bolt side to turbo oil inlet pipe sub-assembly.


e.

Temporarily install the union bolt.


Hide 17293 17.TEMPORARILY INSTALL TURBOCHARGER STAY

a.

Temporarily install the turbocharger stay to the turbocharger sub-assembly, with 3 bolts and nut.


Hide 17141 18.TIGHTEN EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY

Hide 87101 20.INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (w/ Viscous Heater)

a.
A354088E02
1.313,0.292 1.458,0.458 0.146,0.167 10 true 2 1.354,1.698 1.5,1.865 0.146,0.167 10 false 3 2.927,1.406 3.073,1.573 0.146,0.167 10 false 1 2.844,0.615 3,0.802 0.156,0.188 10 true 4

Temporarily install the No. 1 viscous heater bracket sub-assembly to the cylinder block sub-assembly and timing chain cover sub-assembly with the 4 bolts.


b.

Tighten the 4 bolts in the sequence shown in the illustration to install the No. 1 viscous heater bracket sub-assembly.

Torque:
25 N*m (250 kgf*cm, 18 ft.*lbf)


Hide 16268 22.INSTALL NO. 1 WATER BY-PASS PIPE

a.

Install a new gasket and the No. 1 water by-pass pipe to the timing chain cover sub-assembly with the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

HINT:

Make sure that the claw of the gasket faces the No. 1 water by-pass pipe.



Hide 12361 24.INSTALL FRONT ENGINE MOUNTING INSULATOR RH

a.

Install the front engine mounting insulator RH to the front No. 1 engine mounting bracket RH with the nut.

Torque:
64 N*m (653 kgf*cm, 47 ft.*lbf)


b.

Connect the No. 3 vacuum transmitting hose sub-assembly to the front No. 1 engine mounting bracket RH.


Hide 89463C 25.INSTALL NO. 1 NITROGEN OXIDES SENSOR (w/ Urea SCR System)

Hide 25051 26.INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

Hide 89463C 28.CONNECT NO. 1 NITROGEN OXIDES SENSOR (w/ Urea SCR System)

Hide 17167 30.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

Hide 89467B 31.INSTALL AIR FUEL RATIO SENSOR (w/o Urea SCR System)

Hide 17168 32.INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR

Hide 16281 34.CONNECT NO. 4 WATER BY-PASS HOSE

a.

Connect the No. 4 water by-pass hose to the No. 1 injector holder, and slide the clamp to secure the hose.


Hide 16282 35.INSTALL NO. 5 WATER BY-PASS HOSE

a.

Attach the clamp and install the No. 5 water by-pass hose to the No. 1 water hose clamp bracket.


b.

Connect the No. 5 water by-pass hose to the No. 1 injector holder and water outlet sub-assembly, and slide the 2 clamps to secure the hose.


Hide 12229 37.INSTALL PCV PIPE (for Cold Area Specification Vehicles)

Hide 12261 38.INSTALL PCV HOSE (except Cold Area Specification Vehicles)

Hide 89422C 39.INSTALL ENGINE COOLANT TEMPERATURE SENSOR

Hide 88431 40.INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET

NOTICE:

Install the No. 1 compressor mounting bracket exactly as described in the procedures below to properly secure and prevent damage to the fan and generator V belt.


a.
A354094

Temporarily install the No. 1 compressor mounting bracket to the cylinder block sub-assembly with the 2 bolts.

HINT:

Temporarily install the No. 1 compressor mounting bracket with the 2 bolts so that the No. 1 compressor mounting bracket can be moved by hand.



b.
A354095E02
1.115,3.521 1.302,3.677 0.188,0.156 10 true *a 2.625,3.521 2.813,3.677 0.188,0.156 10 true *a 3.198,3.531 3.385,3.688 0.188,0.156 10 true *a 1.875,4.427 2.063,4.583 0.188,0.156 10 false *b 2.458,4.427 2.646,4.583 0.188,0.156 10 false *b 0.521,2.677 0.708,2.833 0.188,0.156 10 false *c 0.771,1.469 0.896,1.646 0.125,0.177 10 true A

Push the No. 1 compressor mounting bracket toward the cylinder block sub-assembly as shown in the illustration and tighten bolt A.

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)

Text in Illustration
*a No Clearance
*b Push
*c Front

HINT:

Make sure there is no clearance between the cylinder block sub-assembly and No. 1 compressor mounting bracket as shown in the illustration.



c.
A354096E01
2.726,1.183 2.93,1.42 0.205,0.237 2.765,1.225 2.907,1.382 0.141,0.158 10 3 2.966,0.478 3.171,0.715 0.205,0.237 3.006,0.52 3.147,0.678 0.141,0.158 10 2 0.973,0.382 1.177,0.619 0.205,0.237 1.03,0.424 1.171,0.582 0.141,0.158 10 1

Uniformly tighten the 3 bolts in the order shown in the illustration.

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)


Hide 16025 41.INSTALL NO. 5 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Install a new gasket and the No. 5 water by-pass pipe sub-assembly to the cylinder block sub-assembly with the 3 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)

HINT:

Make sure that the claw of the gasket faces the No. 5 water by-pass pipe sub-assembly.



Hide 23300 42.INSTALL FUEL FILTER ASSEMBLY

a.

Install the fuel filter assembly to the cylinder block sub-assembly with the 2 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 44.INSTALL HOSE BRACKET

a.

Install the hose bracket to the cylinder head sub-assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 19850 45.INSTALL GLOW PLUG ASSEMBLY

Hide 19871 46.INSTALL NO. 1 GLOW PLUG CONNECTOR

Hide 23810A 47.INSTALL COMMON RAIL ASSEMBLY

Hide 23701 48.TEMPORARILY INSTALL NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY

Hide 23670 49.TIGHTEN INJECTOR ASSEMBLY

Hide 23701 50.TIGHTEN NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY

Hide 51.INSTALL WIRING HARNESS CLAMP BRACKET

a.
A354083E02
0.729,0.563 0.885,0.74 0.156,0.177 10 true A 2.313,0.677 2.469,0.833 0.156,0.156 10 true B 2.958,0.146 3.115,0.302 0.156,0.156 10 false B

for LHD:

Install the 3 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 3 bolts.

Torque:
for bolt A : 10 N*m (102 kgf*cm, 7 ft.*lbf)
for bolt B : 8.4 N*m (86 kgf*cm, 74 in.*lbf)


b.
A354084E03
0.948,0.667 1.115,0.823 0.167,0.156 10 true A 3.052,0.844 3.219,1 0.167,0.156 10 true B

for RHD:

Install the 2 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 2 bolts.

Torque:
for bolt A : 10 N*m (102 kgf*cm, 7 ft.*lbf)
for bolt B : 8.4 N*m (86 kgf*cm, 74 in.*lbf)


Hide 53.INSTALL WIRING HARNESS CLAMP BRACKET

Hide 23770 55.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY

Hide 23804C 56.INSTALL FUEL INLET PIPE SUB-ASSEMBLY

Hide 23271H 57.INSTALL NO. 1 FUEL HOSE

Hide 23273H 58.INSTALL NO. 2 FUEL HOSE

Hide 23804D 59.INSTALL NO. 4 FUEL PIPE SUB-ASSEMBLY

Hide 23243B 60.INSTALL FUEL PUMP MOTOR WIRE

Hide 22803 61.INSTALL FUEL INJECTION PUMP COVER SUB-ASSEMBLY

Hide 63.INSTALL WIRING HARNESS CLAMP BRACKET

Hide 23812D 64.INSTALL NO. 2 FUEL PIPE

a.

Install the No. 2 fuel pipe to the manifold stay with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 1 fuel hose to the No. 2 fuel pipe, and slide the clamp to secure the hose.


Hide 11409 65.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

Hide 25800 66.INSTALL NO. 1 EGR COOLER AND NO. 2 EGR VALVE ASSEMBLY WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY

Hide 16209 67.INSTALL NO. 4 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Install the No. 4 water by-pass pipe sub-assembly to the intake manifold with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

for Cold Area Specification Vehicles:

Attach the clamp and connect the No. 11 water by-pass hose to the No. 2 fuel pipe.


c.

Connect the water hose to the No. 2 EGR valve assembly, and slide the clamp to secure the hose.


d.

Connect the No. 6 water by-pass hose to the No. 4 water by-pass pipe sub-assembly, and slide the clamp to secure the hose.


e.

w/ Urea SCR System:

Install the No. 17 water by-pass hose to the No. 1 EGR pipe sub-assembly and No. 4 water by-pass pipe sub-assembly, and slide the 2 clamps to secure the hose.


Hide 25601 69.INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY

a.

Using an E8 "TORX" socket wrench, install 2 new stud bolts to the exhaust manifold.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Install 2 new gaskets and the No. 1 EGR pipe sub-assembly to the exhaust manifold, electric EGR control valve assembly and No. 1 vacuum transmitting pipe sub-assembly with the bolt and 4 new nuts.

Torque:
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)
for nut : 29 N*m (296 kgf*cm, 21 ft.*lbf)


Hide 27148A 70.INSTALL CONNECTING WIRE

a.

Attach the 2 clamps and install the connecting wire to the hose bracket.


b.

Connect the connector to the common rail assembly.


Hide 16206B 71.INSTALL NO. 3 WATER BY-PASS PIPE SUB-ASSEMBLY

Hide 16278 84.INSTALL NO. 2 WATER BY-PASS PIPE

Hide 26100G 85.INSTALL DIESEL THROTTLE BODY ASSEMBLY

Hide 77246C 86.INSTALL FUEL MAIN TUBE SUPPORT (w/ Urea SCR System)

Hide 17360A 87.INSTALL AIR TUBE ASSEMBLY (w/o Urea SCR System)

Hide 82121 88.INSTALL ENGINE WIRE

Hide 12632 89.INSTALL NO. 2 ENGINE COVER BRACKET (w/o Urea SCR System)

Hide 12633 90.INSTALL NO. 3 ENGINE COVER BRACKET (w/o Urea SCR System)