When replacing an injector (including interchanging injectors between cylinders), common rail, cylinder head, or intake manifold, replace the corresponding injection pipes with a new one.
When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines (See page Engine / Hybrid System>1VD-FTV (FUEL)>FUEL SYSTEM(w/ DPF)>ON-VEHICLE INSPECTION).
1.CHECK INJECTOR COMPENSATION CODE
13511 2.INSTALL NO. 1 AND NO. 2 CAMSHAFTS
| *a | Dot Mark |
| *b | Matchmark |
| *c | Number of Gear Teeth |
If replacing a camshaft with a new one, make a matchmark on the new camshaft in the same place as the old camshaft. Determine the matchmark placement by using the dot mark as a reference point and counting the number of gear teeth from the dot mark to the matchmark as shown in the illustration.
Add more than 19 cc (1.2 cu.in.) of engine oil into the cylinder head sub-assembly RH side oil holes.
Apply engine oil to the No. 1 valve rocker arm sub-assembly rollers and camshaft housing of the cylinder head sub-assembly RH.
Install the No. 1 and No. 2 camshafts.
Apply engine oil to the camshaft journals, lobes, thrust portion and gears.
| *a | Matchmark |
Align the matchmarks of the No. 1 and No. 2 camshaft timing gears shown in the illustration.
Place the 2 camshafts into the cylinder head sub-assembly RH.
Before and after setting the camshafts, firmly set the No. 1 valve rocker arm sub-assemblies to the No. 1 valve lash adjuster assemblies.
Install the No. 1 camshaft bearing cap.
Align the No. 1 camshaft bearing cap and the ring pins of the No. 2 camshaft bearing cap.
Temporarily install the 4 bolts by hand.
Install the No. 3 camshaft bearing caps.
Confirm the marks and numbers on the No. 3 camshaft bearing caps and place them in their proper position and direction.
Temporarily install the 8 bolts, which are not installed with the camshaft oil feed pipe sub-assembly, by hand.
Temporarily install the No. 1 and No. 2 camshaft oil feed pipe sub-assemblies with the 8 bolts by hand.
If even one of the camshaft oil feed pipe sub-assembly bolt holes does not match its No. 3 camshaft bearing cap bolt hole, replace the camshaft oil feed pipe sub-assembly.
The camshaft oil feed pipe sub-assembly is bent on the intake side, and straight on the exhaust side.
Temporarily install the 2 union bolts.
|
12 mm Head Bolt |
|
10 mm Head Bolt |
Uniformly tighten the 20 bolts in several steps in the order shown in the illustration.
Tighten the 2 union bolts.
Remove the service bolt from the No. 1 camshaft timing gear.
Do not drop the service bolt into the timing chain cover sub-assembly.
If the service bolt is difficult to remove, rotate the camshaft and remove the service bolt. Then realign the matchmarks of the No. 1 and No. 2 camshaft timing gears.
Temporarily install the No. 1 chain sub-assembly and No. 1 camshaft timing sprocket to the No. 2 camshaft.
Temporarily install the pump drive shaft gear with the 2 bolts.
Using SST, hold the pump drive shaft gear. Tighten the 2 bolts.
Rotate the crankshaft clockwise so that the 2 remaining pump drive shaft gear bolts can be installed.
Temporarily install the 2 bolts to the pump drive shaft gear.
Using SST, hold the pump drive shaft gear. Tighten the 2 bolts.
Remove the hexagon wrench from the No. 1 chain tensioner assembly.
Remove the adhesive from the threads of the taper screw plug and the bolt hole of the timing chain cover sub-assembly.
Apply adhesive to 3 or more threads of the taper screw plug.
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
Using a 10 mm hexagon wrench, install the taper screw plug.
13053 3.INSTALL NO. 3 AND NO. 4 CAMSHAFTS
| *a | Dot Mark |
| *b | Matchmark |
| *c | Number of Gear Teeth |
If replacing a camshaft with a new one, make a matchmark on the new camshaft in the same place as the old camshaft. Determine the matchmark placement by using the dot mark as a reference point and counting the number of gear teeth from the dot mark to the matchmark as shown in the illustration.
Add more than 19 cc (1.2 cu.in.) of engine oil into the cylinder head sub-assembly LH side oil holes.
Apply engine oil to the No. 2 valve rocker arm sub-assembly rollers and camshaft housing of the cylinder head sub-assembly LH.
Install the No. 3 and No. 4 camshafts.
Apply engine oil to the camshaft journals, lobes, thrust portion and gears.
| *a | Matchmark |
Align the matchmarks of the No. 3 and No. 4 camshaft timing gears shown in the illustration.
Place the 2 camshafts into the cylinder head sub-assembly LH.
Before and after setting the camshafts, firmly set the No. 2 valve rocker arm sub-assemblies to the No. 2 valve lash adjuster assemblies.
Install the No. 4 camshaft bearing cap.
Align the No. 4 camshaft bearing cap and the ring pins of the No. 5 camshaft bearing cap.
Temporarily install the 4 bolts by hand.
Install the No. 3 camshaft bearing caps.
Confirm the marks and numbers on the No. 3 camshaft bearing caps and place them in their proper position and direction.
Temporarily install the 8 bolts, which are not installed with the camshaft oil feed pipe sub-assembly, by hand.
Temporarily install the No. 3 and No. 4 camshaft oil feed pipe sub-assemblies with the 8 bolts by hand.
If even one of the camshaft oil feed pipe sub-assembly bolt holes does not match its No. 3 camshaft bearing cap bolt hole, replace the camshaft oil feed pipe sub-assembly.
The camshaft oil feed pipe sub-assembly is bent on the intake side, and straight on the exhaust side.
Temporarily install the 2 union bolts.
|
12 mm Head Bolt |
|
10 mm Head Bolt |
Uniformly tighten the 20 bolts in several steps in the order shown in the illustration.
Tighten the 2 union bolts.
Remove the service bolt from the No. 4 camshaft timing gear.
Do not drop the service bolt into the timing chain cover sub-assembly.
If the service bolt is difficult to remove, rotate the camshaft and remove the service bolt. Then realign the matchmarks of the No. 3 and No. 4 camshaft timing gears.
Temporarily install the No. 2 chain sub-assembly and No. 2 camshaft timing sprocket to the No. 3 camshaft with the 2 bolts.
Using SST, hold the No. 2 camshaft timing sprocket. Tighten the 2 bolts.
Rotate the crankshaft pulley clockwise so that the 2 remaining No. 2 camshaft timing sprocket bolts can be installed.
Temporarily install the 2 bolts to the No. 3 camshaft.
Using SST, hold the No. 2 camshaft timing sprocket. Tighten the 2 bolts.
Remove the hexagon wrench from the No. 2 chain tensioner assembly.
Remove the adhesive from the threads of the taper screw plug and the bolt hole of the timing chain cover sub-assembly.
Apply adhesive to 3 or more threads of the taper screw plug.
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
Using a 10 mm hexagon wrench, install the taper screw plug.
4.CHECK NO. 1 CYLINDER AT TDC/COMPRESSION
Rotate the crankshaft clockwise 3 times or more, and check that the timing marks of the camshafts (1 dot mark each) align. If the timing marks of the camshafts do not align, repeat the "Install No. 3 and No. 4 Camshafts" and "Install No. 1 and No. 2 Camshafts" procedures.
11202 5.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
12270 6.INSTALL OIL SEPARATOR ASSEMBLY
11201 7.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH
23670 8.INSTALL INJECTOR ASSEMBLY RH
23670 9.INSTALL INJECTOR ASSEMBLY LH
12262 10.INSTALL NO. 2 VENTILATION HOSE
27148B 11.INSTALL CONNECTING WIRE
23810A 12.INSTALL COMMON RAIL ASSEMBLY RH
23702 13.INSTALL INJECTION PIPE RH
12263 14.CONNECT NO. 3 VENTILATION HOSE
23801L 15.INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE SUB-ASSEMBLY
23820A 16.INSTALL COMMON RAIL ASSEMBLY LH
23765 17.INSTALL NO. 5 NOZZLE LEAKAGE PIPE
23812D 18.INSTALL NO. 2 FUEL PIPE
23701 19.INSTALL INJECTION PIPE LH
23764A 20.INSTALL NO. 4 NOZZLE LEAKAGE PIPE
23706 21.INSTALL NO. 6 INJECTION PIPE SUB-ASSEMBLY
11459 22.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE SUPPORT
Install the engine oil level dipstick guide support with the 2 bolts.
12142 23.INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE
15301 24.INSTALL ENGINE OIL LEVEL DIPSTICK
23243C 25.CONNECT FUEL PUMP MOTOR WIRE
44761 26.INSTALL VACUUM PUMP TO CONNECTOR TUBE
23763 27.INSTALL NO. 3 NOZZLE LEAKAGE PIPE
82112 28.CONNECT NO. 2 ENGINE ROOM WIRE
26100G 29.INSTALL DIESEL THROTTLE BODY ASSEMBLY (for Bank 2)
82111 30.CONNECT ENGINE ROOM MAIN WIRE
Connect the 2 connectors and 2 wire harness clamps with the 2 bolts.
Connect the 2 clamps with the engine wire.
Connect the 2 wire harness brakets with the 2 bolts.
Attach the clamp to the No. 3 intercooler support bracket.
Connect the 2 ground wires with the 2 bolts.
Connect the 2 wire harness clamps and attach the engine wire.
Connect the 6 connectors.
Connect the 4 fuel injector connectors.
Connect the engine wire with the 2 bolts.
Connect the 2 wire harness clamps and attach the engine wire.
Connect the 6 connectors.
Connect the 4 fuel injector connectors.
Connect the engine wire with the 5 bolts.
16288 31.INSTALL NO. 4 WATER BY-PASS PIPE
25850 32.INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY
44769 33.INSTALL VACUUM RESERVOIR CONNECT TUBE
17972 34.INSTALL NO. 2 COOL AIR INLET
17971 35.INSTALL NO. 1 COOL AIR INLET
17362B 36.INSTALL NO. 2 AIR TUBE
17940D 37.INSTALL INTERCOOLER ASSEMBLY
17341F 38.INSTALL NO. 1 AIR HOSE
87249B 39.CONNECT HEATER WATER OUTLET PIPE B
44310 40.CONNECT VANE PUMP ASSEMBLY
29300 41.INSTALL VACUUM PUMP ASSEMBLY
17878 42.INSTALL NO. 3 INTAKE AIR CONNECTOR PIPE
82111 43.CONNECT ENGINE ROOM MAIN WIRE
74403A 44.INSTALL BATTERY CARRIER SUB-ASSEMBLY
28800 45.INSTALL BATTERY
23271H 46.CONNECT NO. 1 AND NO. 2 FUEL HOSES
87246A 47.CONNECT HEATER WATER HOSE
44778 48.CONNECT CONNECTOR TO CHECK VALVE HOSE
16400 49.INSTALL RADIATOR ASSEMBLY
50.ADD ENGINE OIL
51.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
52. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART
53.BLEED AIR FROM FUEL SYSTEM
54.INSPECT FOR FUEL LEAK
55.ADD ENGINE COOLANT
56.INSPECT FOR OIL LEAK
57.INSPECT FOR COOLANT LEAK
58.WARM UP ENGINE
In order to bleed air from the chain tensioner assembly, drive the vehicle with the engine at 3000 rpm for 60 seconds or more.
59.INSPECT ENGINE OIL LEVEL
60.INSPECT FOR EXHAUST GAS LEAK
61.INSPECT ENGINE IDLE SPEED
62.INSPECT MAXIMUM ENGINE SPEED
53736 63.INSTALL FRONT FENDER APRON SEAL RH
53737B 64.INSTALL FRONT FENDER APRON SEAL LH